Toronto, Ontario (July 24, 2024) – Red Pine Exploration Inc. (TSXV: RPX, OTCQB: RDEXF )

(“Red Pine ” or the “ Company”) reports the results of the expanded independent verification

sampling and assaying of drill core performed by WSP Canada Inc. (“WSP”) as part of the ongoing

resource estimation for the Wawa Gold Project, Ontario.

Michael Michaud, President and CEO of Red Pine commented: “ I am pleased to see that t he

independent verification sampling completed by WSP is in good agreement with the corrected

database assay values ensuring that we have a project database that is accurate to support the

upcoming resource estimate. The independent verification sampling of core was the final stage

of assay verification, and we now have f ull confidence in the database and the resource

estimation, which remains on schedule to be completed in August.

In addition, t he independent verification sampling also re -confirmed the presence of significant

gold mineralization on the Wawa Gold Project and we continue to see the untested exploration

potential of the property.”

Independent verification sampling methodology

Independent sample verification of the drill core was completed between May 21 and May 23,

2024 by Brian Thomas, P.Geo. of WSP Canada Inc. (“WSP”), a Qualified Person as defined by

National Instrument 43-101. The verification sampling and assaying included core that was drilled

since 2014 to present and included historic drill core collected by previous operators.

The sample verification program considered 50 samples from Red Pine drilling intersections from

2014 to 2024. Each verification sample consisted of either individual or composited samples

selected from intersections distributed in 21 drill holes. A total of 33 verification samples covered

the main zone of the Jubilee Shear, 1 sample covered the lower segments of the Jubilee Shear,

4 covered the Minto B Shear Zone and 12 covered the Minto Mine Shear. The verification samples

consisted of quartered NQ-sized drill core for the drill holes completed between December 2014

and April 2015, and quartered HQ-sized drill core for the holes completed after May 2015.

The verification sampling of historical core (drilled prior to 2014 by previous operators) considered

15 composite samples all covering the main segment of the Jubilee Shear and distributed in 11

underground historical drill holes and 1 historical surface drill hole. Each sample of historical drill

core consisted of a composite sample taken from the entire box of mechanically split A -sized to

B-sized drill core. All the remaining half core that was present in each box was included in the

samples. The drill holes and the intersections for the historical samples were selected based on

the ability to establish precise boundaries for the previously sampled intervals, the composite

grade of the intersections contained in the boxes and their location.

The verification samples were transported in sealed rice bags by WSP from the Wawa Gold

Project to ALS Canada Ltd. in Sudbury. Sample preparation was done at ALS Sudbury and gold

analyses were done at ALS Vancouver. Quartered HQ and NQ drill cores were crushed, and 250

gram (“g”) fractions were pulverized to 85% passing 75 microns. Historical drill cores, because of

the larger sample volume, were crushed and then a 1000 g fraction was pulverized to 85%

passing 75 microns. Gold was analyzed for most of the verification samples by 50-g fire assaying

with a gravimetric finish, with some larger, higher -grade samples analyzed by 1-kilogram (“kg”)

screen metallic assay methods. Metallic screening considered 1 kg pulp screened to 100 microns,

duplicate 50-g fire assay on screen undersize and complete assaying of the oversize fraction.

Blanks and certified reference materials were included in the analyses of the verification samples.

Although there exists higher variability on an individual sample comparison as is typical of most

gold deposits, the sampling completed by WSP o n the Company’s drill holes, and the historical

drilling which occurred prior to Red Pine acquiring the property, are in good agreement with the

assay values in Red Pine's corrected assay database. Based on the combined historical and Red

Pine verified samples, the assay results from the verification sampling are on average within 13%

of the original assay value.

The complete results of the verification sampling are presented at Appendix 1 and Appendix 2.

The full reporting of the verification assays will be included in the Company’s updated National

Instrument 43-101 Technical Report.

Qualified Person

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified

Person, as defined by National Instrument 43 -101, has reviewed and approved the technical

information contained in this news release.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario,

Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX"

and on the OTCQB Markets under the symbol “RDEXF”.

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen

major investment by several producers in the last five years. Its land package hosts numerous

historic gold mines and is over 7000 hectares in size. Red Pine is building a strong position as a

major mineral exploration and development player in the Michipicoten region.

For more information about the Company, visit www.redpineexp.com

Or contact:

Michael Michaud, President and CEO, at (416) 364-7024 or [email protected]

Or

Carrie Howes, Director Corporate Communications, at (416) 644 -7375 or

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Note Regarding Forward-Looking Information

This news release contains statements which constitute “forward -looking information” within the

meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs

and current expectations of the Company with respect to future business activities and operating

performance.

Forward-looking information is often identified by the words “may”, “would”, “could”, “should”,

“will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward-

looking information contained in this news release includes, but may not be limited to, statements

regarding the timing of its updated resource estimate release and the presence of significant gold

mineralization on the Wawa Gold Project continuing to see the untested exploration potential of

the property. Investors are cautioned that forward -looking information is not based on historical

facts but instead reflects management’s expectations, estimates or projections concerning future

results or events based on the opinions, assumptions and estimates of management considered

reasonable at the date the statements are made. Such opinions, assumptions and estimates are

inherently subject to a variety of risks and uncertainties that could cause actual events or results

to differ materially from those projected and undue r eliance should not be placed on such

information, as unknown or unpredictable factors could have material adverse effects on future

results, performance or achievements. Among the key factors that could cause actual results to

differ materially from those projected in the forward -looking information are : the Company's

expectations in connection with the projects and exploration programs being met, the impact of

general business and economic conditions, global liquidity and credit availability on the timing of

cash flows and the values of assets and liabilities based on projected future conditions, fluctuating

gold prices, currency exchange rates (such as the Canadian dollar versus the United States

Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the

Company's mineral reserves and resources, changes in project parameters as plans continue to

be refined, changes in project development, construction, production and commissioning time

frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices

for fuel, power, labour and other consumables contributing to higher costs and general risks of

the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected

changes in mine life, seasonality and weather, costs and timing of the development of new

deposits, success of exploration activities, permitting time lines, government regulation of mining

operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and

limitations on insurance.

This information contained in this news release is qualified in its entirety by cautionary statements

and risk factor disclosure contained in filings made by the Company, including the Company’s

financial statements and related MD&A for the year ended July 31, 2023, and the interim financial

reports and related MD&A for the period s ended October 31, 2023, January 31, 2024 and April

30, 2024 , filed with the securities’ regulatory authorities in certain provinces of Canada and

available at www.sedar.com.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying

the forward-looking information prove incorrect, actual results may vary materially from those

described herein as intended, planned, anticipated, believed, estimated or expected. Although

the Company has attempted to identify important risks, uncertainties an d factors which could

cause actual results to differ materially, there may be others that cause results not to be as

anticipated, estimated or intended. The Company does not intend, and does not assume any

obligation, to update this forward-looking information except as otherwise required by applicable

law.

Appendix 1 – Drill core assay results from the independent verification sampling of Red

Pine drill core samples by WSP

Sampl

es

Compos

ites

Au (g/t)

samples

Au (g/t)

composites

SD-14-03 268.50 269.65 1.15 1.15 1471546 13.90 13.90 P449201 12.70

SD-14-03 269.65 270.70 1.05 1.05 1471547 14.60 14.60 P449202 11.25

267.00 267.77 0.77 1471573 11.60

267.77 268.90 1.13 1471575 6.42

268.90 270.00 1.10 1471576 1.69

270.00 271.12 1.12 1471578 13.10

271.12 272.37 1.25 1471579 3.72

272.37 273.64 1.27 1471580 2.12

273.64 274.60 0.96 1471581 8.87

274.60 275.60 1.00 1471582 9.77

275.60 276.60 1.00 1471583 11.80

155.00 156.00 1.00 1471652 5.79

156.00 157.00 1.00 1471653 10.30

157.00 158.00 1.00 1471654 11.60

158.00 159.00 1.00 1471655 22.60

159.00 160.00 1.00 1471656 18.30

160.00 161.00 1.00 1471658 23.40

SD-18-234 272.77 273.70 0.93 0.93 708865 19.80 19.80 P449206 17.40

SD-18-234 273.70 274.70 1.00 1.00 708866 60.20 60.20 P449207 19.00

SD-18-234 274.70 275.68 0.98 0.98 708867 3.83 3.83 P449208 2.03

SD-18-255 189.79 190.41 0.62 0.62 923203 11.30 11.30 P449203 17.95

SD-18-255 190.41 191.20 0.79 0.79 923204 76.40 76.40 P449204 40.90

SD-18-255 191.20 191.94 0.74 0.74 923206 6.81 6.81 P449205 132.00

546.45 547.63 1.18 771726 2.62

547.63 548.60 0.97 771727 5.36

554.77 555.93 1.16 771735 3.48

555.93 557.02 1.09 771736 0.66

318.57 319.65 1.08 122815 2.30

319.65 320.73 1.08 122816 1.81

SD-22-414 320.73 321.84 1.11 1.11 122817 6.96 6.96 P449230 2.42

P449220 1.44

4.92 SD-22-414 Jubilee - Main

Shear

2.16 2.05 P449229

P449211 5.38

Jubilee - Main

Shear

Jubilee - Main

Shear

SD-20-291

Jubilee - Main

Shear

2.15

12.65

SD-14-05 3.00 21.43 P449214 20.10

SD-14-05

Jubilee - Main

Shear

3.00 9.23 P449213

3.86 P449219 8.12

SD-20-291 2.25 2.11

Red Pine verified

database WSP

Sample

Number

WSP Au

(g/t)

Jubilee - Main

Shear

SD-14-04

Jubilee - Main

Shear

3.00 6.02

Hole ID Zone From

(m) To (m)

RPX

Sample

Number

Length (m)

SD-14-04 2.96 10.16 P449212 12.80

P449210 6.02

SD-14-04 3.64 6.05

Sampl

es

Compos

ites

Au (g/t)

samples

Au (g/t)

composites

298.36 299.18 0.82 808722 5.74

299.18 300.00 0.82 808723 26.00

303.00 304.00 1.00 808728 6.76

304.00 305.14 1.14 808729 2.76

305.14 306.25 1.11 808730 3.14

SD-23-451 355.38 356.54 1.16 1.16 808779 23.50 23.50 P449217 27.50

356.54 357.70 1.16 808781 5.01

357.70 358.86 1.16 808782 3.77

SD-23-455 682.41 683.76 1.35 1.35 992145 3.64 3.64 P449227 4.02

SD-23-455 683.76 684.90 1.14 1.14 992146 21.60 21.60 P449228 27.40

SD-23-456 251.85 252.80 0.95 0.95 990362 5.58 5.58 P449224 4.70

SD-23-456 252.80 253.56 0.76 0.76 990364 23.00 23.00 P449225 21.70

257.45 258.52 1.07 990368 3.75

258.52 259.63 1.11 990369 3.00

259.63 260.75 1.12 990371 3.17

SD-23-477 297.90 298.52 0.62 0.62 997619 5.05 5.05 P449221 1.58

SD-23-477 299.16 300.11 0.95 0.95 997623 17.10 17.10 P449222 27.70

SD-23-477 305.94 306.46 0.52 0.52 997630 93.20 93.20 P449223 87.20

201.00 202.26 1.26 999843 2.18

202.26 203.51 1.25 999844 2.78

203.51 204.62 1.11 999845 7.46

204.62 205.73 1.11 999846 3.45

205.73 206.73 1.00 999847 1.12

206.73 207.90 1.17 999848 3.03

211.29 212.42 1.13 999853 14.70

212.42 213.42 1.00 999854 12.40

SD-17-107 Jubilee -

Lower Shear 197.00 198.00 1.00 1.00 498071 49.20 49.20 P449209 0.25

250.76 252.00 1.24 125696 6.31

252.00 253.26 1.26 125697 7.42

253.36 254.52 1.16 654177 1.65

254.52 255.73 1.21 654178 0.78

255.73 257.18 1.45 654179 1.25

258.58 259.47 0.89 654182 1.63

259.47 260.34 0.87 654183 2.70

266.86 267.84 0.98 654191 0.68

267.84 268.82 0.98 654192 4.00

268.82 269.79 0.97 654193 1.17

5.87

SD-23-419

SD-22-413 Minto B Shear 2.50 6.87 P449250

SD-24-490 2.13 13.62 P449249

Hole ID Zone From

(m) To (m)

Length (m) RPX

Sample

Number

Red Pine verified

database WSP

Sample

Number

WSP Au

(g/t)

2.16 P449244 2.40

SD-23-419 2.93 1.95 P449245 0.72

Minto B Shear

3.82 1.22 P449243 1.46

SD-23-419 1.76

Jubilee - Main

Shear

SD-24-490

Jubilee - Main

Shear

2.51 2.48 P449246 2.59

13.05

SD-24-490 2.17 2.15 P449248 1.89

SD-24-490 2.22 5.46 P449247 5.82

Jubilee - Main

Shear

Jubilee - Main

Shear

SD-23-456 3.30 3.30

4.12 P449216

P449226 4.19

3.84

SD-23-451 2.32 4.39 P449218 2.03

SD-23-451

Jubilee - Main

Shear

1.64 15.87 P449215 12.65

SD-23-451 3.25

Sampl

es

Compos

ites

Au (g/t)

samples

Au (g/t)

composites

SD-22-373 161.15 162.10 0.95 0.95 804249 21.70 21.70 P449239 6.99

SD-22-373 162.10 163.16 1.06 1.06 804155 93.20 93.20 P449240 116.00

SD-22-373 163.16 164.17 1.01 1.01 804157 1.76 1.76 P449241 0.52

SD-18-222 Minto Mine

Shear 257.88 258.60 0.72 0.72 713784 46.50 46.50 P449242 8.18

SD-17-171 200.38 201.39 1.01 1.01 524057 11.30 11.30 P449232 12.55

SD-17-171 201.39 202.30 0.91 0.91 524058 2.94 2.94 P449233 2.82

SD-17-115 108.93 109.96 1.03 1.03 498141 5.71 5.71 P449234 3.26

SD-17-115 109.96 110.96 1.00 1.00 498142 16.40 16.40 P449235 21.00

SD-17-105 92.00 92.97 0.97 0.97 373214 11.50 11.50 P449236 8.92

SD-17-105 94.00 95.00 1.00 1.00 373216 6.33 6.33 P449237 2.67

95.00 96.00 1.00 373217 2.72

96.00 97.00 1.00 373218 2.04

152.93 153.62 0.69 372166 19.80

153.62 154.31 0.69 372167 20.20

12.85

2.38 P449238 2.63

SD-17-86 Minto Mine

Shear 1.38 20.00 P449231

Minto Mine

Shear

Minto Mine

Shear

Minto Mine

Shear

Minto Mine

Shear

WSP Au

(g/t)Hole ID

SD-17-105 2.00

Zone From

(m) To (m)

Length (m) RPX

Sample

Number

Red Pine verified

database WSP

Sample

Number

Appendix 2 – Drill core assay results from the independent verification sampling of

historical drill core samples by WSP

Samples Composi

tes

Au (g/t)

samples

Au (g/t)

composites

174.80 175.56 0.76 38747 0.00

175.56 176.48 0.92 38748 2.19

176.48 177.39 0.91 38749 2.47

177.39 178.31 0.92 38750 0.82

0.76 1.52 0.76 27523 0.34

1.52 2.29 0.77 27524 0.00

2.29 3.05 0.76 27525 0.00

3.05 3.81 0.76 27526 1.03

3.81 4.57 0.76 27527 0.69

4.57 5.33 0.76 27528 0.34

5.33 6.10 0.77 27529 0.34

6.10 6.86 0.76 27530 0.00

6.86 7.62 0.76 27531 0.00

7.62 8.38 0.76 27532 0.00

8.38 9.14 0.76 27533 0.00

9.14 9.91 0.77 27534 0.00

9.91 10.67 0.76 27535 0.00

10.67 11.43 0.76 27536 0.34

11.43 12.19 0.76 27537 0.34

12.19 12.95 0.76 27538 0.00

12.95 13.72 0.77 27539 1.37

13.72 14.48 0.76 27540 7.20

14.48 15.24 0.76 27541 3.43

0.00 0.76 0.76 28104 0.00

0.76 1.52 0.76 28105 0.00

1.52 2.29 0.77 28106 0.69

2.29 3.05 0.76 28107 0.00

3.05 3.81 0.76 28108 0.00

3.81 4.57 0.76 28109 0.00

4.57 5.33 0.76 28110 0.00

WSP Sample

Number WSP Au (g/t)

Length (m) Red Pine reconciled

database

Hole ID From

(m) To (m)

Sample

Weight

(kg)

RPX Sample

Number

P4491623.51 3.38 0.87S235 1.43

P4491606.86 5.90 1.22U0644L5 0.30

P4491597.62 6.17 1.17U0644L5 1.27

P4491575.33 4.41 0.31U0658L5 0.10