Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

RPX.V ·

Red Pine Commences Surface Trenching and Sampling Programme in Potential Open Pit Areas at Wawa Gold Project

Exploration Programs

Red Pine Commences Surface Trenching and Sampling Programme in

Potential Open Pit Areas at Wawa Gold Project

TORONTO--(BUSINESS WIRE)--October 9, 2025--Red Pine Exploration Inc. (TSXV: RPX,

OTCQB: RDEXF) (“Red Pine” or the “Company”) is pleased to announce the commencement

of a new surface trenching and geologic mapping and sampling program at the Wawa Gold

Project, that aims to better define the geometry of the gold mineralization in the areas with open

pit potential (See Press Release dated May 8, 2025).

Michael Michaud, President and CEO of Red Pine, commented: “We are pleased to announce

that a surface trenching program has started in the northern zone, targeting a potential open pit,

where recent drilling has returned a number of higher-grade intersections.

The mapping and sampling of near-surface mineralization is a cost-effective way to collect vital

data about the distribution and geometry of gold mineralization, that will support any future

mining assessment.

We remain excited about the open pit potential of this northern area, that will form part of the

updated mineral resource estimate and preliminary economic assessment (“PEA”) expected to be

released in H1 2026.”

Mechanized trenching program in the Potential North Pit area

The North Pit area is located at the northern end of one of the ore shoots in the Jubilee Shear

where the Jubilee Intrusive Stock is comprised of relatively homogeneous dioritic and tonalitic

intrusions. This homogeneity of the Jubilee Intrusive Stock favoured the development of large

fractures that were filled in and above the Jubilee Shear by an array of gold mineralized quartz

veins forming a broad zone of gold mineralization with locally very significant gold enrichment.

Mechanized trenching is targeting the surface projection of high-grade gold mineralization over

approximately 60 metres (“m”) along the strike of the Jubilee Shear within the mining patents

and leases. Smaller satellite trenches will also be completed beyond the principal trench along

significant veins identified in the main trench to extend the known mineralization. Detailed

geological mapping and methodical channel sampling of the veins will be done on the main

quartz veins observed on the trenches. Previous significant drilling intersections in the North Pit

area include (Figure 1 and 2):

 45.38 grams per tonne gold (“g/t Au”) over 3.13 m core length, including 141.00 g/t Au

over 0.88 m in hole SD-25-559 (see press release of June 18, 2025)

 14.51 g/t Au over 4.81 m, including 90.40 g/t Au over 0.67 m in hole SD-25-552 (see

press release of May 12, 2025)

 Previous intersections from the same area reported in the National Instrument 43-101

Technical Report dated September 30, 2024 include:

o 109.00 g/t Au over 0.86 m in historical hole U0590L3;

o 176.00 g/t Au over 0.78 m in hole SD-16-45.

Baseline studies

Baseline studies continue to progress on the project. Key developments include the installation of

8 monitoring wells, packer testing of drill holes in the areas identified for open pit potential to

better constrain groundwater movement, and additional data collection on fauna (Figure 3).

The mineral resource estimation, as well as mine design and metallurgical studies, which will be

included in the PEA targeted for release in the first half of 2026, are also continuing.

Quality Assurance/Quality Control ("QA/QC") Measures

Individual drill core samples are labelled and sawn in half along a pre-marked cutting line. A

consistent half-core sample is then placed in an individual numbered plastic sample bag that is

sealed. The remaining half-core samples are kept at the Company’s core storage facility located

on the Wawa Gold project. Quarter-core duplicates are taken from certain samples to define the

variability of gold distribution. Groups of samples are then placed into durable rice bags sealed

with security seals to be transported by commercial carrier for analysis at Activation

Laboratories Ltd. (Actlabs), Ancaster, Ontario. NQ core assays are obtained by 50-gram fire-

assay with a AA finish or by 1-kilogram metallic screen fire assay. The 1-kilogram metallic

screen assay method is selected for samples anticipated to contain coarse gold and when the

original fire-assay returns results greater or equal to 2.25 g/t Au. The residual coarse reject

portions of the samples remain in storage for a minimum 90-day period if further work or

verification is needed.

As part of its QA/QC program, Red Pine inserts external gold standards (low- to high-grade) and

blanks every 20 samples and routinely inserts blanks immediately after samples with visible

gold. Quarter core duplicates are routinely inserted to evaluate the natural variability of gold

mineralization. Assay certificates are sent to at least three members of the senior management

team, and they are directly accessible from the WebLIMS portal of Actlabs. Approximately 5%

of the pulps and coarse rejects analyzed at Actlabs are sent to Agat Laboratories in Thunder Bay

for umpire testing.

Qualified Person

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified

Person, as defined by National Instrument 43-101, has reviewed and approved the technical

information contained in this news release.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario,

Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX"

and on the OTCQB Markets under the symbol “RDEXF”.

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen

major investment by several producers in the last five years. The Company’s land package hosts

numerous historic gold mines and is over 7,000 hectares in size. Red Pine is building a strong

position as a major mineral exploration and development player in the Michipicoten region.

For more information about the Company, visit www.redpineexp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains statements which constitute “forward-looking information” within the

meaning of applicable securities laws, including statements regarding the plans, intentions,

beliefs and current expectations of the Company with respect to future business activities and

operating performance.

Forward-looking information is often identified by the words “may”, “would”, “could”,

“should”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” or similar

expressions. Forward-looking information contained in this news release includes, but may not

be limited to, statements regarding the surface stripping and trenching program helping to

estimate the gold in the area and its geometry for any future mining assessment; the release of a

mineral resource estimate and PEA in H1 2026; smaller satellite trenches being completed

beyond the principal trench along significant veins identified in the main trench to extend the

known mineralization; and detailed geological mapping and methodical channel sampling of the

veins being done on the main quartz veins observed on the trenches.

Investors are cautioned that forward-looking information is not based on historical facts but

instead reflects management’s expectations, estimates or projections concerning future results or

events based on the opinions, assumptions and estimates of management considered reasonable

at the date the statements are made. Such opinions, assumptions and estimates are inherently

subject to a variety of risks and uncertainties that could cause actual events or results to differ

materially from those projected and undue reliance should not be placed on such information, as

unknown or unpredictable factors could have material adverse effects on future results,

performance or achievements. Among the key factors that could cause actual results to differ

materially from those projected in the forward-looking information are: the Company's

expectations in connection with the projects and exploration programs being met, the impact of

general business and economic conditions, global liquidity and credit availability on the timing

of cash flows and the values of assets and liabilities based on projected future conditions,

fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United

States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes

in the Company's mineral reserves and resources, changes in project parameters as plans

continue to be refined, changes in project development, construction, production and

commissioning time frames, the possibility of project cost overruns or unanticipated costs and

expenses, higher prices for fuel, power, labour and other consumables contributing to higher

costs and general risks of the mining industry, failure of plant, equipment or processes to operate

as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the

development of new deposits, success of exploration activities, permitting time lines,

government regulation of mining operations, environmental risks, unanticipated reclamation

expenses, title disputes or claims, and limitations on insurance.

This information contained in this news release is qualified in its entirety by cautionary

statements and risk factor disclosure contained in filings made by the Company, including the

Company’s financial statements and related MD&A for the year ended July 31, 2024, and the

interim financial reports and related MD&A for the period ended January 31, 2024, April 30,

2024, October 31, 2024, January 31, 2025, April 30, 2025 and July 31, 2025, filed with the

securities’ regulatory authorities in certain provinces of Canada and available at

www.sedarplus.ca.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying

the forward-looking information prove incorrect, actual results may vary materially from those

described herein as intended, planned, anticipated, believed, estimated or expected. Although the

Company has attempted to identify important risks, uncertainties and factors which could cause

actual results to differ materially, there may be others that cause results not to be as anticipated,

estimated or intended. The Company does not intend, and does not assume any obligation, to

update this forward-looking information except as otherwise required by applicable law.

Contacts

Michael Michaud, President and Chief Executive Officer, at (416) 364-7024 or

[email protected]

Or

Manish Grigo, Director of Corporate Development, at (416) 569-3292 or

[email protected]