Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RPX.V ·

Red Pine Announces Targeted 15,000 Metre Drill Program at Wawa in 2021

Exploration Programs

NEWS RELEASE

Red Pine Announces Targeted 15,000 Metre Drill Program at Wawa in 2021

Toronto, Ontario – April 1, 2021 – Red Pine Exploration Inc. (TSX-V: RPX) ("Red Pine" or

the "Company") is pleased to announce its exploration and drilling plans for 2021 at its

100% owned Wawa Gold Project , located 2 kilometres southeast of Wawa, Ontario . With

the announcement of the proj ect's consolidation of ownership to 100% (see February 23,

2021, News Release), Red Pine is now ready to execute a strategic drill program designed

to expand the existing NI 43-101 mineral resources and to explore the multiple additional

highly prospective targets on the property. An estimated 15,000 metres of diamond drilling

is planned in 2021 with the program continuing into 2022.

Wawa Project highlights

• 100% ownership (recently consolidated from 63.31%)

• Two mineral deposits (Surluga and Minto Mine South) with currently estimated NI

43-101 resource of 1,307,000 tonnes @ 5.47 g/t gold for 230,000 ounces in the

indicated category and 2,716,000 tonnes @ 5.39 g/t gold for 471,000 ounces in the

inferred category1

• Resource principally located between the surface and 300 metres vertical depth

• Discovery of higher -grade mineralization in the Jubilee Shear Zone (host of the

Surluga Deposit) down plunge of the existing resource

• Preliminary drilling identified five (5) high -grade gold exploration targets that

could grow the current resource : Hornblende, Minto B, Grace/Nyman, Minto Mine

South and Parkhill # 4 shear zones

• Potential for additional high-grade gold targets in the extension of the Jubilee Shear

Zone, south of the Parkhill Fault

Quentin Yarie, President and CEO of Red Pine, stated, "After a great deal of work, we are

happy to have consolidated Red Pine' s ownership of the Wawa Gold Project to 100%. Well

funded, we are now set to resume our drilling and exploration programs and continue to grow

the mineral resources on the property . Our earlier drill programs discovered mineralized

zones beneath the Surluga Deposit and six other mineralized exploration targets adjacent to

and beyond the current NI 43-101 resources. The focus of our 2021 exploration program will

be to expand Surluga at depth and test the other targets. We are very pleased to now be able

to fully develop and realize value as we grow 100% of the Wawa Gold Project for Red Pine

shareholders."

2021 Drilling and Exploration Program

The main target for diamond drilling in 2021 will be the Jubilee Shear Zone, host of the

Surluga Deposit NI 43-101 mineral resource. The resource extension and definition drilling

program will test the high er-grade gold-bearing structures previously identified by Red

Pine. The Company will also test a number of exploration targets on the property that have

the potential to be converted into resources as Red Pine continues to develop the project.

Extension of the Surluga Deposit NI 43-101 Resource

The Company will prioritize the extension of the higher-grade gold mineralization zone

discovered in 2020, 300 metres down-dip of the current Surluga Deposit resource which

generally lies from near -surface to a depth of 300 meters. Drilling the Jubilee Shear Zone

extension at depth will also test the westernmost down- dip extension of the Minto Mine

South Shear Zone, host of the second known resource on the Wawa Gold Project – the Minto

Mine South Deposit.

2020 diamond drilling highlights in the Jubilee Shear Zone (Figure 1):

• 3.38 g/t gold over 13.3 m true width ("TW"), including 15.31 g/t gold over 1.64 m

(SD-20-293)

• 5.2 g/t gold over 6.31 m TW including 15.7 g/t gold over 1.07 m and 12.4 g/t gold

over 0.78 m (SD-20-289)

• 1.63 g/t gold over 23.34 m TW, including 17.32 g/t gold over 0.88 m and 14.72

g/t gold over 0.85 m (SD-20-292)

• 2.06 g/t gold over 11.8 m TW, including 3.67 g/t over 1.03 m and 7.45 g/t gold

over 0.84 m (SD-20-291)

Figure 1- 2020 diamond drilling highlights in the Jubilee Shear Zone

A review of historical data suggests that the Jubilee Shear Zone's northern extension, where

limited drilling has been conducted, could host undiscovered zones of high -grade

mineralization less than 300 metres below the surface. Geological data recorded in certain

boreholes at the edge of the structure's current footprint suggests potential proximity to

stronger mineralized zones.

Targets beyond Surluga

The section below summarizes the exploration targets identified for further investigation.

Figure 2 - Exploration targets that will be tested in 2021

Jubilee Shear Zone south of the Parkhill Fault

In 2019 and 2020, Red Pine' s mechanized stripping and mapping program on the Jubilee

Shear Zone, south of the Parkhill Fault, indicated structural attributes comparable to those

found north of the fault. Shallow historical drilling by Duraine Mines Ltd. in 1981 combined

with Red Pine's geological mapping and channel sampling indicated gold mineralization.

Drilling in this underexplored extension of the structure could expand shallow gold

mineralization in the Jubilee Shear Zone to a 2 km strike length.

Diamond drilling highlights in the southern extension of the Jubilee Shear Zone (source

AFRI 41N15NE0055 for Duraine Mines drilling results):

• 3.06 g/t gold over 2.70 m, including 41.14 g/t gold over 0.16 m (D81-02)

• 6.95 g/t gold over 1.01 m, including 15.39 g/t gold over 0.45 m (D81-04)

• 8.33 g/t gold over 1.34 m, including 24.34 g/t gold over 0.34 m (D81-08)

• 3.99 g/t gold over 1.00 m (S302 – RPX 2019 historic core sampling)

Grace and Nyman Shear Zones

The Grace and Nyman shear systems , host of the historical Darwin- Grace Mine, will be

targeted for the discovery of shallow high -grade gold mineralization. Red Pine 's 2017

drilling demonstrated that high -grade gold mineralization is still present outside the

mine's historic footprint and that mineralization in the Nyman vein extends at depth. Red

Pine's mechanized stripping and mapping program s located the Grace Shear Zone

extension, 110 m etres north of the northernmost underground development of the

Darwin-Grace Mine. The 2021 drilling program will test this new area in the structure.

Red Pine's diamond drilling highlights in the Grace and Nyman Shear Zones:

• 42.22 g/t gold over 2.44 m , including 107.49 g/t gold over 0.54 m (DG -17-55 –

Grace Shear Zone)

• 57.31 g/t gold over 3.14 m, including 138 g/t gold over 1.11 m (DG-17-56 – Grace

Shear Zone)

• 10.1 g/t gold over 0.82 m (DG-17-66 – Nyman Shear Zone)

Hornblende Shear Zone

Red Pine' s d iamond drilling in the Hornblende Shear Zone showed that gold

mineralization, with potential zones of higher -grade mineralization, occurs over a strike

length of at least 1.6 km. The largest zone of higher -grade mineralization, identified by

historic drilling and confirmed by Red Pine's drilling, occurs at the seventh level of the

historical Surluga Mine. Red Pine's drilling in the Hornblende Shear Zone also identified

additional zones of broad mineralization with discrete zones of higher -grade

mineralization in the structure.

Diamond drilling highlights in the Hornblende Shear Zone include:

• 5.61 g/t gold over 8.5 m, including 15.42 g/t gold over 2.9 m (HS-15-31)

• 2.91 g/t gold over 4.5 m, including 5.77 g/t gold over 1 m (HS-15-28)

• 3.18 g/t gold over 9.54 m, including 19.54 g/t gold over 0.61 m (U0007L7)

Minto B Shear Zone

The Minto B Shear Zone is located above the Jubilee Shear Zone, over the central and

southern segments of the Surluga Deposit resource, north of the Parkhill Fault. Diamond

drilling and mechanized stripping traced the structure over a strike length of 1 km and

uncovered broad zones of gold mineralization. A higher -grade core also occur s in the

structure, the size and grade could be defined with additional drilling. Diamond drilling in

the Minto B Shear Zone will be undertaken concurrently with resource conversion,

definition and exploration drilling in the Jubilee Shear Zone.

Diamond drilling highlights in the Minto B Shear Zone includes:

• 2.1 g/t gold over 10.6 m, including 3.7 g/t gold over 5.6 m (SD-18-256)

• 13.65 g/t gold over 2 m (SD-15-07)

• 4.69 g/t gold over 6.1 m, including 14.37 g/t gold over 1.52 m (U1683L5)

Announcement of Vice President of Exploration

Red Pine is pleased to announce the appointment of Mr. Jean-François Montreuil, P.Geo.,

Ph.D. as Vice President of Exploration of the Company effective immediately.

Dr. Montreuil graduated from Laval University (Quebec City) in 2009 with a Masters in

Earth Sciences and obtained a Doctorate in Earth Sciences from INRS-ETE (Quebec City) in

2016. He has over 12 years’ experience in mineral exploration. Jean-Francois was the Head

Geologist at Red Pine and MacDonald Mines Exploration where he contributed to the

discovery and definition of the Minto Mine South deposit and the extension of the Surluga

Deposit. Jean-Francois is a registered member of th e Ordre des Géologues du Québec and

the Professional Geoscientists of Ontario.

"We are very pleased t hat Jean -Francois has accepted this responsibility at Red Pine ,"

commented Red Pine’s CEO, Quentin Yarie. "Jean-Francois has demonstrated great success

in practical mineral exploration, and we are eager to continue working with him on growing

Red Pine’s gold resources in Wawa."

Announcement of Investor Relations Manager

As Red Pine moves into a new stage of exploration and development, the Company

welcomes Tara Asfour as Investor Relations Manager. Ms. Asfour holds over 10 years of

management, strategy development and capital raising experience, as well as a Masters in

Business Administration from Herzing University and Political Science, and an

undergraduate degree from Concordia University. Ms. Asfour is the Chief Development

Officer at FairGreen Capital Partners and holds corporate affairs and investor relations

experience in the mining, resource, technology, infrastructure, health, and

wellness industries.

On-site Quality Assurance/Quality Control ("QA/QC") Measures

Drill core samples were transported in security sealed bags for analyses at Actlabs in

Ancaster, Ontario. Individual samples were labelled, placed in plastic sample bags and

sealed. Groups of samples were then placed into durable rice bags and then shipped. The

remaining coarse reject portions of the samples remain in storage if further work or

verification is needed.

Red Pine has implemented a quality -control program to comply with best practices in the

sampling and analysis of drill core. As part of its QA/QC program, Red Pine inserts external

gold standards (low to high grade) and bla nks every 20 samples in addition to random

standards, blanks, and duplicates.

Qualified Person

Quentin Yarie, P.Geo. and Chief Executive Officer of Red Pine and the Qualified Person, as

defined by National Instrument 43 -101, has reviewed and approved the news release's

technical information.

COVID-19 Precautions

Red Pine has developed and implemented compliant precautions and procedures

according to guidelines for the Province of Ontario . Protocols were put in place to ensure

our employees ' and contractors' safety , thereby reducing the potential for community

contact and spreading of the virus.

About Red Pine Exploration Inc.

Red Pine Exploration Inc. is a gold and base-metals exploration company headquartered in

Toronto, Ontario, Canada. The Company's common shares trade on the TSX Venture

Exchange under the symbol "RPX".

For more information about the Company, visit www.redpineexp.com

Or contact:

Quentin Yarie, President and CEO, (416) 364-7024, [email protected]

Or Tara Asfour, Investor Relations Manager, (514) 833-1957 [email protected]

1National Instrument 43 -101 Technical Report for the Wawa Gold Project, Brian Thomas P.Geo. Golder

Associates Ltd, effective July 16, 2019

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This News Release contains forward -looking statements. In some cases, you can identify forward -looking

statements by terminology such as " may", "should", "expects", "plans", "anticipates", "believes", "estimates",

"predicts", "potential" or "continue" or the negative of these terms or other comparable terminology. These

statements are only predictions and involve known and unknown risks, uncertainties and other factors that may

cause our or our industry 's actual results, levels of activity, performance or achievements to be materially

different from any future results, levels of activity, performance or achievements expressed or implied by these

forward-looking statements.

Although the Company believes that the assumptions and factors used in preparing the forward -looking

information in this news release are reasonable, undue reliance should not be placed on such information, which

only applies as of the date of this news release. The Company disclaims any intention or obligation to update or

revise any forward-looking information, whether as a result of new information, future events or otherwise,

other than as required by law.