Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ROS.V ·

Roscan Gold Drills 6.15gpt over 46.5m, Intersects Fresh Rock and Confirms Northern Extension of the Southern Mankouke Mineralization Trend

Drill Results

Roscan Gold Drills 6.15gpt over 46.5m,

Intersects Fresh Rock and Confirms Northern

Extension of the Southern Mankouke

Mineralization Trend

Toronto, Ontario--(Newsfile Corp. - August 12, 2020) -

Roscan Gold Corporation

(TSXV: ROS)

(FSE: 2OJ) (OTC PINK: RCGCF)

("Roscan" or the "Company")

is pleased to announce positive

diamond drill results (Figure 1) from an additional 20 holes totaling 3,788 meters (m) at its Mankouke

South Target. DDMan-20-54 (Figure 1 and Figure 3) intersected 6.15 gpt over 46.5m from 118.5m,

which has increased the width of the mineralized zone to 125m. Hole DDMan-20-61 intersected 2.76 gpt

over 6m including 9.55 gpt over 1m in Fresh Rock and increases vertical depth of mineralization to

173m (Figure 3).

The Government Aeromagnetic Survey (SYSMIN), which covers both the Kandiole Project area (Figure

4) and the area of hole DDMan-20-59, indicates that the Southern Mankouke Mineralized Trend is

faulted off to the West, and the continuation of the Northern Mineralization Trend is shown by DDMan-20-

59.

Drilling Highlights:

Southern Mankouke - Diamond Drill Holes

6.15 gpt gold over 46.5m from drill hole DDMan-20-54 from 118.5m;

5.20 gpt gold over 41.0m from drill hole DDMan-20-57 from 38.5m;

Including 52.6 gpt over 1.0m from 61.5m

And 2.01 gpt gold over 25.0m from 7.5m

3.98 gpt gold over 68.0m from drill hole DDMan-20-56 from 7.5m;

4.89 gpt gold over 22.0m from drill hole DDMan-20-59 from 7.5m;

4.18 gpt gold over 17.0m from drill hole DDMan-20-52 from 133.5m

;

And 9.57 gpt gold over 7.0m from 157.5m

2.92 gpt gold over 18.0m from drill hole DDMan-20-50 from 114.5m

;

2.76 gpt gold over 6.0m from drill hole DDMan-20-61 from 146.4m

;

Including 9.55 gpt over 1.0m from 151.4m

1.98 gpt gold over 47.0m from drill hole DDMan-20-48 from 6.5m

.

Air Core Drilling

3.00 gpt gold over 20.0m from drill hole ACMan20-467 from 8.0m;

1.12 gpt gold over 36.0m from drill hole ACMan20-469 from 12.0m;

2.80 gpt gold over 12.0m from drill hole ACMan20-660 from 34.0m;

1.79 gpt gold over 20.0m from drill hole ACMan20-663 from 30.0m

(End of Hole);

1.62 gpt gold over 12.0m from drill hole ACMan20-665 from 38.0m;

(End of Hole).

Notes: 1: True width yet to be determined, 2: Table 1 - Assay Highlights, 3: 0.5gpt used as cut-off with

4m internal dilution for drill holes at Mankouke South, and 2m internal dilution for regional

drill holes,

4:

No top-cut.

AC regional fence drilling tests termite mound anomalies. In the event that significant results are

returned, first follow-up is generally more AC fence drilling along strike and if mineralization of significant

grade is confirmed over a significant strike distance, follow-up is done with RC and / or DD drilling.

These 314 AC holes aided us to establish 200m strike length at northern extension to date.

Nana Sangmuah, President and CEO, stated

,

"These positive results demonstrate the extension of the

Southern Mankouke mineralization to the North, based on the offset which the Geophysics identified

in Figure 4. We have traced this new zone over 200 meters in strike length and continue to increase

the foot print of the deposit.

We are very excited to intersect gold in the fresh rock again and increase

the depth of mineralization at Mankouke South. We remain focused on testing the full potential of our

tenement package in order to yield more discoveries and expand on Mankouke South (Figure 2).

Drilling in 2020 should unlock the potential of our highly prospective land package leading to more

news flow in the coming weeks."

Figure 1: Plan View delineating the offset to the North and expansion to the West

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/4821/61554_91fab06724668a21_001full.jpg

Figure 2: Cross Section depicting Depth and High Grade Continuity - DDMan-20-57

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/4821/61554_91fab06724668a21_002full.jpg

Figure 3: Cross Section depicting the Extension to the West and Vertical Depth - DDMan-20-61

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/4821/61554_91fab06724668a21_003full.jpg

Drill hole DDMan-20-54 intersected one of the highest gram meters to date at Southern

Mankouke. This drill hole, when coupled with previously high-grade drill holes, shows the persistent

high grade nature of the deposit.

Drill hole DDMan-20-61 indicates a westerly dip of the mineralized zone, intersected the fresh rock

and increased the vertical depth of the mineralization. This hole identifies the potential of the

deposit to the west and we will continue to drill to clearly understand the extents.

DDMan-20-59 confirms the offset to the northwest whereby the mineralization picks up again on

the northern portion. Also, the rock texture north of the offset is similar to that of southern portion of

Mankouke South.

Figure 4: Geophysics data showing the offset and major structure on Kandiole Project

To view an enhanced version of Figure 4, please visit:

https://orders.newsfilecorp.com/files/4821/61554_91fab06724668a21_004full.jpg

The gold mineralization at Mankouke South is associated with quartz veining (Figure 5 and Figure 6)

and/or disseminated and stringer pyrite hosted in brecciated, silicified and locally sheared greywackes

and mudstones underlain by interbedded limestones and mudstones of the Kofi Formation. Mankouke

South is located approximately 25km east of the Fekola mine (B2Gold Corp.).

Figure 5: Drill Core Photo DDMan-20-59 (Northern Extension) showing high grade sections

mineralization style comparable to Mankouke South Zone DDMan-20-57 (Figure 6)

To view an enhanced version of Figure 5, please visit:

https://orders.newsfilecorp.com/files/4821/61554_91fab06724668a21_005full.jpg

Figure 6: Drill Core Photo DDMan-20-57 (Mankouke South Target) showing broadly high grade sections

similar to Hole DDMan-20-59 (Northern Extension)

To view an enhanced version of Figure 6, please visit:

https://orders.newsfilecorp.com/files/4821/61554_91fab06724668a21_006full.jpg

Drilling Contract and Analytical Protocol

The drilling contracts were awarded to Target Drilling SARL and Geodrill who both employ multi-purpose

(AC/RC/DD) rig and AC rigs at the Kandiole Project. The AC drilling is mainly focused on drilling

exploration targets.

All diamond drill samples are sent for preparation to Bureau Veritas Mineral Laboratories in Bamako,

Mali and transported by Bureau Veritas to their analytical facility in Abidjan, Ivory Coast for fire assay

with atomic absorption finish and by gravimetric finish for grades above 10gpt Au. Most the AC drilling

was sent to SGS. Roscan applied industry-standard QA/QC procedures to the program. Certified

reference materials, blanks and field duplicates are inserted at appropriate intervals.

Table 1: Drillhole Highlights at Mankouke South (August 11

th

, 2020)

Hole ID

Section

From

To

Interval (m)

gpt Au

DDMAN20-42

1376200

NSR

DDMAN20-43

1376200

NSR

DDMAN20-44

1375700

8

10

2

1.14

24

25

1

0.97

31

34

3

1.87

39

57

18

2.11

including

41

43

2

9.43

99

100

1

0.91

127

128

1

0.79

DDMAN20-45

1376200

NSR

DDMAN20-46

1376400

NSR

DDMAN20-47

1375700

30

31

1

0.61

46

61

15

1.05

103

130

27

1.36

146

152

6

3.47

157

165

8

0.96

DDMAN20-48

1376000

6.5

53.5

47

1.98

including

35.5

38.5

3

5.35

and

49.5

51.5

2

6.68

86.5

87.5

1

1.31

96.5

103.5

7

2.62

DDMAN20-49

1375650

NSR

DDMAN20-50

1376000

28.5

35.5

7

1.5

47.5

48.5

1

0.8

65.5

70.5

5

0.85

82.5

88.5

6

1.06

114.5

132.5

18

2.92

including

119.5

121.5

2

19.8

142.5

145.5

3

2.64

155.5

156.5

1

0.51

DDMAN20-51

1375650

64

70

6

1.08

DDMAN20-52

1375950

25.5

30.5

5

1.46

50.5

51.5

1

0.65

63.5

64.5

1

0.76

69.5

79.5

10

4.03

including

76.5

79.5

3

10.4

93.5

99.4

5.9

0.55

104.4

116.5

12.1

1.78

133.5

150.5

17

4.18

including

141.5

145.5

4

9.14

157.5

164.5

7

9.57

including

161.5

164.5

3

15.6

170.5

171.5

1

0.66

DDMAN20-53

1375600

NSR

DDMAN20-54

1375750

109.5

112.5

3

0.67

118.5

165

46.5

6.15

including

120

126.5

6.5

10.3

and

132.5

142.5

10

10.1

172.5

174

1.5

0.76

DDMAN20-55

1380550

NSR

DDMAN20-56

1375850

7.5

75.5

68

3.98

including

27.5

42.5

15

8.1

and

64.5

66.5

2

14

DDMAN20-57

1375850

7.5

32.5

25

2.01

including

23.5

24.5

1

22.3

38.5

79.5

41

5.2

including

47.5

49.5

2

13.9

and

56.5

64.5

8

15.4

including

61.5

62.5

1

52.6

84.5

100.5

16

1.97

122.5

126.5

4

1.69

including

127.5

128.5

1

5.3

DDMAN20-58

1380900

NSR

DDMAN20-59

1376390

7.5

29.5

22

4.89

including

18.5

23.5

5

9.07

and

27.5

29.5

2

9.17

DDMAN20-60

1380800

68.3

69.3

1

1.67

103.3

107.3

4

0.57

DDMAN20-61

1375750

117.5

124.5

7

1.19

146.4

152.4

6

2.76

including

151.4

152.4

1

9.55

175.4

176.4

1

0.54

185.4

187.4

2

1.13

198.4

199.4

1

0.52

218.4

226.4

8

0.96

ACMAN20-466

1376390

18

28

10

0.99

ACMAN20-467

1376390

8

28

20

3

ACMAN20-469

1376390

12

48

36

1.12

ACMAN20-470

1376390

6

14

8

0.74

34

38

4

0.77

48

50

2

0.5

ACMAN20-471

1376390

10

18

8

1.68

24

26

2

0.52

ACMAN20-472

1376390

10

16

6

0.98

24

26

2

0.65

ACMAN20-473

1376390

10

22

12

0.59

44

48

4

2.97

ACMAN20-647

1376300

14

20

6

0.59

30

32

2

0.76

ACMAN20-654

1376300

14

22

8

0.81

30

36

6

1.27

42

48

6

0.48

ACMAN20-655

1376300

18

32

14

0.76

36

44

8

0.65

ACMAN20-656

1376300

36

44

8

0.81

48

50

2

0.63

ACMAN20-657

1376300

18

20

2

0.55

ACMAN20-660

1376350

34

46

12

2.8

ACMAN20-661

1376350

20

28

8

3.06

32

34

2

0.58

ACMAN20-662

1376350

8

10

2

2.07

ACMAN20-663

1376350

14

16

2

0.61

30

50

20

1.79

ACMAN20-664

1376350

8

14

6

0.45

18

26

8

1.41

44

50

6

0.61

ACMAN20-665

1376350

22

24

2

0.59

38

50

12

1.62

ACMAN20-337

1377470

6

7

1

0.7

ACMAN20-355

1375860

18

20

2

0.86

ACMAN20-357

1375860

18

19

1

0.83

34

38

4

1.29

ACMAN20-415

1377080

24

28

4

1.75

ACMAN20-491

1377580

0

2

2

0.68

Table 2: Drillhole ID Mankouke South (August 11

th

, 2020)