Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ROS.V ·

Roscan Expands Gold Zone at Mankouke and Makes a New Discovery at Its Kandiole Project in Western Mali

Drill Results

Roscan Expands Gold Zone at Mankouke and Makes a

New Discovery at Its Kandiole Project in Western Mali

Bedford, Nova Scotia--(Newsfile Corp. - July 22, 2019) -

Roscan Gold Corporation (TSXV: ROS) ("Roscan" or the

"Company")

is pleased to announce the positive assay results from both its diamond drilling and air core (AC) drilling

programs at its Kandiole Project in Mali, West Africa. This drilling program was completed during April to July of 2019 and was

designed to test both the north and south extensions of the Mankouke gold discovery zone and many other strong termite and

soil, gold anomalies. The Mankouke gold discovery has been shown, by detailed drilling, to have a strike length of at least 500

metres. In addition, the recent very impressive AC drilling assay results at the southern end of the Mankouke permit, as shown in

Figure 1, supports the existence of a 7-kilometer long mineralization target corridor associated with the Mankouke discovery.

HIGHLIGHTS

In hole ACMan 19-167

5.86 g/t Au over 26.0 m (incl. 9.44 g/t Au over 10.0 m)

In hole ACMan 19-168

3.74 g/t Au over 30.0 m (incl. 6.73 g/t Au over 6.0 m)

In hole DDH 19-04

8.63 g/t Au over 10.0 m (incl. 11.48 g/t Au over 7.0 m)

In hole DDH 19-03

6.53 g/t Au over 5.0 m (incl. 10.09 g/t Au over 3.0 m)

In hole DDH 19-03

5.56 g/t Au over 3.0 m (incl. 7.14 g/t Au over 2.0 m)

In hole DDH 19-08

3.45 g/t Au over 10.0 m (incl. 6.76 g/t Au over 3.0 m)

Note:

True widths cannot be determined with the information available

A summary of all assay results is presented in Table 1.

COMMENTARY

Greg Isenor, President and CEO of Roscan Gold, stated: "

We are continuing to show that

we have an excellent new gold

discovery at Mankouke that appears to have strike and depth continuity. Our land package has great potential and we are

extremely encouraged by the hits we are seeing on the Mankouke permit. There are many assays yet to be received and

these will be available in the coming weeks. We are extremely pleased our approach to exploration in this area has been

successful. Additional drilling is part of an obvious next step.

The drilling around the Mankouke discovery shows that a strong mineralization system exists and is" alive". This is not

supergene mineralization. We have drilled 19 core holes and have received results for 11 and have significant assays in 8 of

the 11 holes. We are waiting for results for both AC and DDH on the north extension of the trend. (See fig 2). Deeper holes

are planned when we return to drilling after the rain season. The drilling season is over for a few months, however many

results yet to be received. We have the funds to continue drilling after the seasonal rains (July to October). In addition, the

excellent AC results we received in the south of the Mankouke permit (see fig 1) will be followed up as soon as possible.

"

DRILLING PROGRAM

The drilling was carried out during the period May to July with two rigs, one air core drilling rig and one multi-purpose diamond

drilling rig. The diamond drilling was completed in the Mankouke discovery zone area and designed to test for extensions to the

zone. The drilling program has been suspended until the end of the rainy season. At this point in the drilling program, there has

been 19 diamond drill holes completed for a total of 2,017 meters. Assay results have not been received for eight diamond drill

holes. See Figure 2.

A total of 607 AC holes were drilled for a total meterage of 28,037 metres. Approximately 60% of the assays of the AC drilling

have been received. The AC drilling covered the entire land package with testing the most important termite anomalies. Lines of

AC holes were drilled across the target areas generally in an east-west direction and drilled at -50 degrees to the west to a

depth of 45 to 60 metres in a heel to toe fashion. AC drilling is used to sample unconsolidated ground with compressed air used

to remove the cuttings from the hole. During the Kandiole drilling program, 2 metres long samples were collected. For each 2

metre intersection an ~2-kilogram sample was collected and sent to the laboratory.

A check sample of approximately 5

kilograms was collected for possible future tests.

INTREPRETATION

The gold mineralization intersected to date in the Mankouke Zone is hosted in breccia zones which are interbedded with

saprolitic metasediments. Recent core holes have intersected gold mineralized breccia (8.63 g/t Au over 10 metres from 79.1

metres to 89.1 metres along the drill hole) at a vertical depth of 60 metres. This drilling indicates that the initially reported gold

discovery (News Release January 24, 2019) has "roots" and is not near surface enrichment (supergene). This drilling

information clearly shows the potential at depth in this area and identifies that this is typical Birimian, hydrothermal-type gold

mineralization.

Additional interpretation will be completed when all data is available.

PLANS

Remaining assays will be received and processed during the rainy season. It is expected that drilling will resume as early as

mid-October and will primarily consist of both diamond drilling, to test for both the extensions of the Mankouke gold discovery,

and, to test significant AC intersections identified in other areas of the property. In addition, AC drilling will be continued to test

the remaining, untested termite and gold soil anomalies.

QUALIFIED PERSON AND SAMPLE PROTOCOL

The technical content in this news release has been reviewed and approved by Gregory P. Isenor, P. Geo, a Qualified Person as

defined by NI 43-101.

For quality control, duplicated samples were systematically collected in the field, and blank samples were inserted in the sample

batches sent to the laboratory. Before their transportation, the samples were stored in a Roscan secured location in the field.

Batches of samples were transported by truck, driven by Roscan contractors, to the Bureau Veritas laboratory sample

preparation installation of in Bamako; prepared samples were then shipped by Bureau Veritas to their treatment installation at

Abidjan, Ivory Coast. During the assay process, the laboratory applied its own quality controls with blanks, duplicates and

standard samples. The assay method was atomic absorption (AA) with pre-concentration by fire assay (FA); the detection limit

of the method is of 5 ppb.

ABOUT ROSCAN

Roscan Gold Corporation is a Canadian gold exploration company focused on the acquisition and exploration of gold properties

in West Africa. The Company has assembled a significant land position of 100%-owned permits in an area of producing gold

mines (including B2 Gold's Fekola Mine which lies in a contiguous property to the west of Kandiole), and major gold deposits,

located both north and south of its Kandiole Project in west Mali.

For further information, please contact:

Greg Isenor

President and Chief Executive Officer

Tel: (902) 832-5555

Email:

[email protected]

Forward Looking Statements

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information

is characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar

words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information involves risks,

uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those

expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from

such forward-looking information include, but are not limited to, changes in the state of equity and debt markets, fluctuations

in commodity prices, delays in obtaining required regulatory or governmental approvals, and other risks involved in the

mineral exploration and development industry, including those risks set out in the Company's management's discussion and

analysis as filed under the Company's profile at www.sedar.com. Forward-looking information in this news release is based on

the opinions and assumptions of management considered reasonable as of the date hereof, including that all necessary

governmental and regulatory approvals will be received as and when expected. Although the Company believes that the

assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue

reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise

any forward-looking information, other than as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Table 1

SIGNIFICANT ASSAY RESULTS

AIR CORE DRILLING PROGAM 2019

Hole #

Line #

FROM

(m)

TO

(m)

INTERSECTION

(g/t Au)/m

ACKaN-19-06

S 1383715 N

2.0

8.0

16.0

30.0

4.0

10.0

18.0

32.0

0.68 g/t Au over 2.0 m

1.05 g/t Au over 2.0 m

0.71

g/t Au over 2.0 m

0.72

g/t Au over 2.0 m

ACMan-19-47

S 1379900 N

30.0

32.0

0.56 g/t Au over 2.0 m

ACMan-19-48

S 1379900 N

12.0

14.0

0.62 g/t Au over 2.0 m

ACMan-19-49

S 1379900 N

16.0

22.0

0.49 g/t Au over 6.0 m

ACMan-19-51

S 1379900 N

2.0

10.0

4.0

16.0

1.92 g/t Au over 2.0 m

1.46 g/t Au over 6.0 m

26.0

28.0

1.34 g/t Au over 2.0 m

ACMan-19-74

S 1382160 N

34.0

36.0

0.51 g/t Au over 2.0 m

ACMan-19-84

S 1380600 N

30.0

46.0

40.0

48.0

1.24 g/t Au over 10.0 m

0.53 g/t Au over 2.0 m

ACMan-19-85

S 1380600 N

38.0

44.0

2.44 g/t Au over 6.0 m

ACMan-19-86

S 1380600 N

12.0

26.0

14.0

30.0

3.10 g/t Au over 2.0 m

4.29 g/t Au over 4.0 m

ACMan-19-88

S 1380650 N

14.0

16.0

3.75 g/t Au over 2.0 m

ACMan-19-89

S 1380650 N

42.0

44.0

0.79 g/t Au over 2.0 m

ACMan-19-90

S 1380650 N

16.0

18.0

2.18 g/t Au over 2.0 m

ACMan-19-155

S 1382350 N

18.0

20.0

2.15 g/t Au over 2.0 m

ACMan-19-163

S 1375850 N

36.0

42.0

1.24 g/t Au over 6.0 m

ACMan-19-165

S 1375850 N

6.0

20.0

10.0

22.0

0.91 g/t Au over 4.0 m

2.37 g/t Au over 2.0 m

ACMan-19-166

S 1375850 N

6.0

30.0

44.0

24.0

34.0

50.0

1.40 g/t Au over 18.0 m

8.14 g/t Au over 4.0 m

6.13 g/t Au over 6.0 m

ACMan-19-167

S 1375850 N

4.0

6.0

24.0

28.0

34.0

20.0

8.0

50.0

30.0

44.0

4.50 g/t Au over 16.0 m

Inc. 23.00 g/t Au over 2.0 m

5.86 g/t Au over 26.0 m

Inc. 10.20 g/t Au over 2.0 m

Inc. 9.44 g/t Au over 10.0 m

ACMan-19-168

S 1375850 N

4.0

10.0

20.0

26.0

46.0

14.0

12.0

50.0

32.0

50.0

3.00 g/t Au over 10.0 m

Inc. 10.60 g/t Au over 2.0 m

3.74 g/t Au over 30.0 m

Inc. 6.73 g/t Au over 6.0 m

Inc. 9.19 g/t Au over 4.0 m

ACMan-19-169

S 1375850 N

0.0

8.0

38.0

38.0

2.0

16.0

50.0

42.0

0.54 g/t Au over 2.0 m

1.34 g/t Au over 8.0 m

3.23 g/t Au over 12.0 m

Inc. 5.92 g/t Au over 4.0 m

ACMan-19-170

S 1375850 N

10.0

10.0

22.0

36.00

12.0

26.0

2.76 g/t Au over 26.0 m

Inc. 6.76 g/t Au over 2.0 m

Inc. 8.74 g/t Au over 4.0 m

ACMan-19-171

S 1375850 N

6.0

8.0

0.64 g/t Au over 2.0 m

ACMan-19-181

S 1377200 N

4.0

6.0

1.31 g/t Au over 2.0 m

ACMan-19-189

S 1377200 N

26.0

28.0

1.01 g/t Au over 2.0 m

ACMan-19-196

S 1377200 N

4.0

6.0

1.59 g/t Au over 2.0 m

ACMan-19-200

S 1377420 N

22.0

24.0

2.10 g/t Au over 2.0 m

ACMan-19-217

S 1377420 N

6.0

16.0

12.0

18.0

1.00 g/t Au over 6.0 m

0.99 g/t Au over 2.0 m

ACMan-19-229

S 1378200 N

24.0

26.0

0.65 g/t Au over 2.0 m

ACMou-19-01

S 1398350 N

0.0

2.0

1.33 g/t Au over 2.0 m

ACMou-19-03

S 1398350 N

12.0

38.0

16.0

40.0

0.81 g/t Au over 4.0 m

0.54 g/t Au over 2.0 m

ACMou-19-08

S 1398080 N

26.0

28.0

0.79 g/t Au over 2.0 m

ACMou-19-10

S 1397290 N

6.0

38.0

42.0

8.0

44.0

44.0

0.52 g/t Au over 2.0 m

3.82 g/t Au over 6.0 m

Inc. 8.46 g/t Au over 2.0 m

ACNia-19-04

S 1380260 N

20.0

22.0

0.64 g/t Au over 2.0 m

Note 1:

This table includes all the mineralized intersections with a grade > 0.50 g/t Au; these intersections are considered as

significant intersections.

Note 2:

Intersections in bold refer to intersections with a grade > 0.50 g/t Au, and a length > 2.0.

Note 3:

True widths cannot be determined with the information available.

DIAMOND DRILLING PROGRAM 2019

Hole #

Line #

FROM

(m)

TO

(m)

INTERSECTION

(g/t Au)/m

DDHMan-19-01

1380500 N

35.0

47.0

39.0

48.0

1.04 g/t Au over 4.0 m

1.97 g/t Au over 1.0 m

DDHMan-19-02

1380500 N

75.1

77.1

0.99 g/t Au over 2.0 m

DDHMan-19-03

1380550 N

54.1

54.1

60.1

60.1

71.1

72.1

89.1

57.1

56.1

62.1

61.1

76.1

75.1

90.0

5.56 g/t Au over 3.0 m

Inc. 7.14 g/t Au over 2.0 m

6.48 g/t Au over 2.0 m

Inc. 8.98 g/t Au over 1.0 m

6.53 g/t Au over 5.0 m

Inc. 10.09 g/t Au over 3.0 m

2.60 g/t Au over 0.9 m

DDHMan-19-04

1380550 N

27.1

68.1

79.1

79.1

28.1

72.1

89.1

86.1

1.69 g/t Au over 1.0 m

0.80 g/t Au over 4.0 m

8.63 g/t Au over 10.0 m

Inc. 11.48 g/t Au over 7.0 m

DDHMan-19-05

1380450 N

48.1

51.1

49.1

52.1

1.30 g/t Au over 1.0 m

0.73 g/t Au over 1.0 m

DDHMan-19-07

1380500 N

16.1

28.1

28.1

38.1

17.1

30.1

29.1

39.1

0.71 g/t Au over 1.0 m

14.88 g/t Au over 1.6 m

Inc. 34.00 g/t Au over 0.6 m

0.58 g/t Au over 1.0 m

DDHMan-19-08

1380600 N

11.1

32.1

66.1

73.1

85.1

12.1

33.1

76.1

76.1

86.1

1.07 g/t Au over 1.0 m

12.70 g/t Au over 1.0 m

3.45 g/t Au over 10.0 m

Inc. 6.76 g/t Au over 3.0 m

6.29 g/t Au over 1.0 m

DDHMan-19-12

1380600 N

104.0

105.0

1.07 g/t Au over 1.0 m

DDHMan-19-13

1380600 N

31.0

36.0

41.0

55.0

55.0

74.0

82.0

32.0

37.0

42.0

57.0

56.0

75.0

83.0

0.75 g/t Au over 1.0 m

1.10 g/t Au over 1.0 m

0.64 g/t Au over 1.0 m

4.16 g/t Au over 2.0 m

Inc. 7.81 g/t Au over 1.0 m

0.56 g/t Au over 1.0 m

1.51 g/t Au over 1.0 m

Note 1:

This table includes all the mineralized intersections with a grade > 0.50 g/t Au; these intersections are considered as

significant intersections.

Note 2:

Intersections in bold refer to intersections with a grade > 0.50 g/t Au, and a length > 2.0.

Note 3:

True widths cannot be determined with the information available.

Figure 1

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/4821/46368_b01c8377e4b94ae8_001full.jpg

Figure 2

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/4821/46368_b01c8377e4b94ae8_002full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/46368