Roscan Defines Numerous Strong GOLD Anomalies at Its 100%-OWNED Kandiole GOLD Project IN WEST Mali Drill Testing Planned FOR November 2018
RosCan Minerals Corporation News Release September 21, 2018
1
RosCan Minerals Corporation
365 Bay Street, Suite 400
Toronto, Ontario, M5H 2V1
NEWS RELEASE
ROSCAN DEFINES NUMEROUS STRONG GOLD ANOMALIES AT ITS 100%-OWNED
KANDIOLE GOLD PROJECT IN WEST MALI
DRILL TESTING PLANNED FOR NOVEMBER 2018
Toronto, September 21, 2018 – RosCan Minerals Corporation (“ RosCan” or the “ Company”) (TSX-V: ROS), is
pleased to announce that it has identified numerous high quality gold geochemical anomalies at its 100%-owned
Kandiole Project in west Mali. Immediate drilling is warranted and planned for November 2018.
During June and July of this year, RosCan conducted a detailed geochemical sampling program, consisting of soils
and termite samples, on the Mankouke and Moussala Nord permits. This program was completed just prior to the
commencement of 2018 rainy season and was identified from the reconnaissance prospecting program
completed during the dry season of this year. These two areas represent only 20 sq. km of the contiguous 271 sq.
km Kandiole Project land package.
A total of 4,916 samples were collected, including 2,806 soil samples and 2,110 termite mound samples. Samples
were collected on lines 100 to 200 metres apart with sample stations every 50 metres. There are many anomalous
values and these sample values are outlined o n the attached maps. Most of the anomalous samples align along
northerly trending corridors up to 350 metres wide with individual anomaly groups extending for a minimum of
600 metres along strike.
As can be seen from the attached maps a small portion of t he Kandiole Project area was covered with detailed
sampling. Map No . 1 shows the Kandiole Project land package with results of work to date and the areas of
detailed sampling. Maps No. 2 and 3 show the results of the sample analyses and gold anomalies of the Mankouke
and Moussala Nord areas respectively. These major anomalies will first be checked in the field, prioritized and
subjected to a first pass drill testing, expected to be conducted in November 2018.
COMMENTARY
Greg Isenor, President and CEO of RosCan stated “we were quite surprised and rewarded by the amount and
strength of these new Au -in-soil and termite mound anomalies that were identified in an area of existing gold
mines and along same structures, that management believes, host the nearby, recent discoveries by Oklo
Resources and Komet Resources. Our plans are to build on these exciting results, start drill testing the targets and
carry out the easy, next steps of collecting more soil and termite samples in this overlooked, highly prospecti ve
area.”
QUALIFIED PERSON AND SAMPLE PROTOCOL
The technical content in this news release has been reviewed and approved by Gregory P. Isenor, P. Geo, a
Qualified Person as defined by NI 43-101.
For quality control, duplicated samples were systematically collected in the field, and blank samples were inserted
in the sample batches sent to the laboratory. A total of 91 blank samples and 98 duplicates were included in the
sample batches sent to the lab. Before their transportation, the samples were stored in a RosCan secured location
in the field. Batches of samples were transported by truck, driven by RosCan contractors , up to the sample
preparation installations of Bureau Veritas laboratory at Bamako; prepared samples were then shipped by Bureau
RosCan Minerals Corporation News Release September 21, 2018
2
RosCan Minerals Corporation
365 Bay Street, Suite 400
Toronto, Ontario, M5H 2V1
Veritas to their treatment installations at Abidjan, Ivory Coast. During the assay process, the laboratory applied
its own quality controls with blanks, duplicates and standard samples. The assay method was atomic absorption (AA) with
pre-concentration by fire assay (FA); the detection limit of the method is of 5 ppb.
ABOUT ROSCAN
RosCan Minerals Corporation is a Canadian gold exploration company focussed on the acquisition and exploration of gold
properties in west Africa. The Company has assembled a significant land position of 100%-owned permits in an area of large
gold deposits for its Kandiole Project in west Mali.
For further information, please contact:
Greg Isenor
President and Chief Executive Officer
Tel: (902) 832-5555 or (416) 293-8437
Email: [email protected]
RosCan Minerals Corporation News Release September 21, 2018
3
RosCan Minerals Corporation
365 Bay Street, Suite 400
Toronto, Ontario, M5H 2V1
RosCan Minerals Corporation News Release September 21, 2018
4
RosCan Minerals Corporation
365 Bay Street, Suite 400
Toronto, Ontario, M5H 2V1
RosCan Minerals Corporation News Release September 21, 2018
5
RosCan Minerals Corporation
365 Bay Street, Suite 400
Toronto, Ontario, M5H 2V1
Forward Looking Statements
This news release contains forward -looking information which is not comprised of historical facts. Forward -looking information is
characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or
statements that certain events or conditions “may” or “will” occur. Forward -looking information involves risks, uncertainties and other
factors that could cause actual eve nts, results, and opportunities to differ materially from those expressed or implied by such forward -
looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not
limited to, ch anges in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or
governmental approvals, and other risks involved in the mineral exploration and development industry, including those risks s et out in the
Company’s management’s discussion and analysis as filed under the Company’s profile at www.sedar.com. Forward-looking information in
this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including that all
necessary governmental and regulatory approvals will be received as and when expected. Although the Company believes that the
assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not
be placed on such information. The Company disclaims any intention or obligation to update or revise any forward -looking information,
other than as required by applicable securities laws.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.