Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ROCK.V ·

Eros Resources Corp. Provides Corporate and Exploration Update ON the Bell Mountain GOLD Project IN Nevada

Exploration Programs

NEWS RELEASE

October 27th, 2020

EROS RESOURCES CORP. PROVIDES CORPORATE AND EXPLORATION UPDATE ON

THE BELL MOUNTAIN GOLD PROJECT IN NEVADA

Vancouver

BC,

October

27th,

2020

–

Eros

Resources

Corp.

(TSX-V:

“ERC,”

“Eros,”

or

the

“Company”)

is

pleased

to

announce

the

appointment

of

Welsh

Hagen

Associates

to

lead

the

exploration

efforts

at

the

Bell

Mountain

Gold

Project

in

Nevada.

Welsh

Hagen

has

been

directly

involved

with

the

engineering

and

advancement

of

the

Bell

Mountain

property

since

Eros

commenced

operations

in

Nevada

and

will

be

responsible

for

maintaining

corporate

stewardship

of

all

Nevada

operations for Eros.

New

BMEC

management

from

the

Welsh

Hagen

team

includes

John

Welsh,

President

and

Director,

Douglas

Willis,

Vice

President-Exploration,

and

Caren

Idzinga,

Secretary.

Management

from

the

Eros

team

includes

Ronald

Netolitzky,

Chief

Executive

Officer

and

Director,

and

Andrew

Davidson,

Treasurer

and

Director.

BMEC

will

maintain

a

corporate

presence

at

the office of Welsh Hagen Associates at 250 S. Rock Blvd., Suite 118, Reno, NV 89502 (Tel: 775-853-7776).

Welsh

Hagen

is

assuming

the

role

formerly

held

by

Mr.

Jeffrey

L.

Wilson,

who

is

retiring

at

the

end

of

October

2020.

Eros

wishes

to

thank

Mr.

Wilson,

whose

efforts

have

been

instrumental

in

steering

the

Bell

Mountain

Gold

Project

successfully

through the permitting process.

Soil Geochemical Survey Samples Collected and Submitted for Analysis

As

previously

reported,

Eros

has

initiated

a

soil

geochemical

survey

to

identify

drill

targets

in

order

to

expand

the

existing

resource

model

at

Bell

Mountain

gold

focused

project.

We

are

pleased

to

report

that

the

soil

samples

have

been

collected

and

have now been submitted to the lab for analysis.

Eros

collected

1,000

soil

samples

on

a

200

ft

x

200

ft

sample

grid.

Where

bedrock

was

present,

rock-chip

samples

were

collected.

Certified

reference

material,

blanks,

duplicates,

and

second-lab

check

assays

are

part

of

the

quality

control

and

assurance

program.

The

samples

will

guide

determination

of

drill

targets

by

anomalous

gold

in

soil

and

favorable

geology

(silicification) where present. Reverse-circulation exploration drilling will test targets as warranted.

About Bell Mountain - A Gold Focused Project in Advanced Stages of The Permitting Process

Eros’

100%

owned

Bell

Mountain

Gold

Project

is

located

near

Fallon,

Nevada.

Highlights

of

the

Preliminary

Economic

Assessment

that

was

completed

in

2017

(See

Eros’

press

release

of

October

11,

2017)

and

which

has

not

been

updated

for

current gold and silver pricing, include:

●

Pre-tax net present value (“NPV” @ 5% and internal rate of return (“IRR”) of $17.6 million and 41.4%

respectively, along with a payback period of 1.7 years, using a USD $1,300/oz price of gold and a USD $17.50/oz

price of silver.

●

After tax NPV @ 5% and IRR of $9.3M and 24.7% respectively, with a payback period of 2.7 years.

●

4 year mine life, with total production of 60,056 ounces of gold and 408,498 ounces of silver, before expansion

based on renewed exploration.

●

Life of mine cash cost of $759 per produced ounce, net of by-product silver and including royalty payments

totalling $2.56 million.

For further details, please refer to

​

www.sedar.com

Eros

has

engaged

McClelland

Laboratories

in

Reno,

NV

to

estimate

capital

and

operating

costs

(±20%)

for

the

Bell

Mountain Gold Project. Subsequent data will be used to update the present economic model.

Furthermore,

Eros

is

planning

to

reinstate

the

exploration

activities

in

a

near

future,

with

the

purpose

of

further

expanding

the current resource base.

Eros

operates

in

the

USA

through

its

100%

owned

subsidiary

Bell

Mountain

Mining

Corp.,

a

Nevada

corporation

based

in

Carson City Nevada.

About EROS

Eros

Resources

Corp.

is

a

Canadian

public

company

listed

on

the

Toronto

Venture

Exchange.

The

Company’s

business

objective

is

the

identification,

acquisition

and

exploration

of

advanced-stage

projects

with

a

North

American

focus.

The

current development project is Bell Mountain, Nevada.

In

addition,

the

Company

plans

to

make

strategic

investments

with

a

global

focus

on

a

diverse

commodity

base.

EROS

managements’ expertise supports this strategy.

For further information, please contact:

EROS Resources Corp.

Ron Netolitzky

President and Chief Executive Officer

Phone: 604-688-8115

Forward Looking Statements

This

release

contains

forward-looking

statements.

All

statements,

other

than

statements

of

historical

fact

that

address

activities,

events

or

developments

that

we

believe,

expect

or

anticipate

will

or

may

occur

in

the

future

are

forward-looking

statements.

These

forward-looking

statements

reflect

our

current

expectations

or

beliefs

based

on

information

currently

available

to

us.

Forward-looking

statements

in

this

release

include,

without

limitation,

statements

with

respect

to:

the

closing

of

the

Private

Placement

and

the

use

of

proceeds

from

the

Private

Placement.

Forward-looking

statements

are

subject

to

a

number

of

risks

and

uncertainties

that

may

cause

our

actual

results

to

differ

materially

from

those

discussed

in

the

forward-looking

statements

and,

even

if

such

actual

results

are

realized

or

substantially

realized,

there

can

be

no

assurance

that

they

will

have

the

expected

consequences

to,

or

effects

on,

us.

Factors

that

could

cause

actual

results

or

events

to

differ

materially

from

current

expectations

include,

among

other

things,

delays

in

obtaining

or

failure

to

obtain

required

approvals

to

complete

the

Private

Placement;

and

other

risks

related

to

our

business.

Any

forward-looking

statement

speaks

only

as

of

the

date

on

which

it

is

made

and,

except

as

may

be

required

by

applicable

securities

laws,

we

disclaim

any

intent

or

obligation

to

update

any

forward-looking

statement,

whether

as

a

result

of

new

information,

future

events

or

results

or

otherwise.

Although

we

believe

that

the

assumptions

inherent

in

the

forward-looking

statements

are

reasonable,

forward-looking

statements

are

not

guarantees

of

future

performance

and,

accordingly,

undue

reliance

should

not be put on such statements due to their inherent uncertainty.

Neither

the

TSX

Venture

Exchange

nor

its

Regulation

Services

Provider

(as

that

term

is

defined

in

the

policies

of

the

TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

EROS Resources Corp.

Investor Inquiries:

Suite 420 - 789 West Pender Street

Vancouver, British Columbia,

T: 604-688-8115

w:

​

www.erosresourcescorp.com

Lubica Keighery

VP Corporate Development

[email protected]

c: 778-889-5476