Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ROAR.V ·

LION ROCK Resources Receives Drill Permit at Volney Project, South Dakota

Permits & Approvals

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

LION ROCK RESOURCES RECEIVES DRILL PERMIT AT VOLNEY PROJECT,

SOUTH DAKOTA

Vancouver, British Columbia – August 25, 2025 – Lion Rock Resources Inc. (TSX-V: ROAR, FSE:

KGB, OTCQB: LRRIF) (the “Company”) is pleased to announce that it has received approval from the

South Dakota Department of Agriculture and Natural Resources (DANR) for its drill permit at the V olney

Project, located in the historic Black Hills mining district of South Dakota, USA. This permit approval

paves the way for the Company to commence its inaugural drill program at V olney. Drilling is expected to

begin in the coming month.

News Highlights

• 78 Drill Pads Approved: The DANR has au thorized 78 drill pad locations across the V olney

property. This broad coverage provides Lion Rock with maximum flexibility to test the extent of

gold and lithium mineralization across multiple high-priority areas (Figures 1 and 2).

• High-grade Gold with Expansion Potential Along Strike : Surface sampling by Lion Rock has

outlined multiple gold -bearing zones, including a shear trend where chip samples returned up to

14.0 g/t Au (see Lion Rock news release dated May 28, 2025). Drill testing this trend along strike

and at depth is now permitted.

• Lithium and Tin Provide Multi-Commodity Upside: Permitted drill pads will allow Lion Rock

to test the Giant V olney across it’s 635 m surficial strike which has returned recent grades of up to

3.7% Li2O from outcrop and 5.3% Li2O from historic stockpiles. Historical drill and mining

results are limited to a depth of 50 m and mineralization is open at depth. Tin values greater than

1.0% Sn were reported from 13 recent stockpile samples, demonstrating significant by-product

potential (see Lion Rock news release dated May 13, 2025).

Dale Ginn, President & CEO of Lion Rock, stated, “ We are very pleased to have secured our drill permit

and to move into drilling at V olney. The property has not yet seen modern subsurface exploration, and this

approval positions us to move ahead with our inaugural drill program a nd evaluate its strong multi -

commodity potential.”

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

Figure 1. Volney Project map highlighting recent high-grade sampling results and priority drill target areas

for the upcoming campaign.

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

Figure 2. General cross-section at the Rusty Gold target and V olney Lithium target area, showing recent

sampling results and priority drill targets with 3D magnetic inversion.

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

About the Volney Project

The V olney property is a multi-commodity project strategically located in South Dakota’s Black Hills, a

historically rich and active mining region ( Figure 3). The Black Hills have produced over 62 million

ounces of gold, including from the prolific Homestake Mine, one of the most significant gold producers in

North American history. The V olney Project is home to the Giant V olney pegmatite, a 635 m long LCT

(Lithium-Cesium-Tantalum) pegmatite which remains untested at dep th. The district continues to attract

modern exploration efforts, with companies such as Dakota Gold Corp. actively advancing projects within

the Black Hills. The project is accessible year-round and consists of private claims with surface and mineral

rights, which facilitates rapid permitting and project advancement.

Figure 3. Volney Project regional map in the Black Hills, South Dakota.

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

The technical content of this news release has been reviewed and approved by Carl Ginn, P .Geo., consultant

to the Company and a Qualified Person pursuant to National Instrument 43-101.

About Lion Rock Resources Inc.

Lion Rock Resources Inc. is a Canadian mineral exploration company committed to advancing high-grade

gold and lithium projects across North America. The Company’s flagship asset, the V olney Project, is

located in South Dakota’s Black Hills, a mining-friendly jurisdiction surrounded by active gold operations.

The Company is led by an award -winning team with a proven track record of mineral discoveries, project

development, and financing.

On Behalf of the Board

R. Dale Ginn, President & Chief Executive Officer

O: 604-678-5308

E: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward-Looking Information

Certain statements contained in this news release may constitute “forward-looking information” within the meaning

of Canadian securities legislation. Forward-looking information is often, but not always, identified by the use of words

such as “anticipate”, “plan”, “estimate”, “expect”, “may”, “will”, “intend”, “should”, “potential”, “indicative”

and similar expressions. Forward -looking information involves known and unknown risks, uncertainties and other

factors that may cause actual results or events to di ffer materially from those anticipated in such forward -looking

information. Such forward-looking information is based on the current expectations of management of the Company.

The Company’ s actual results could differ materially from those anticipated in this forward-looking information as a

result of risks and uncertainties, including without limitation risks and uncertainties inherent in the exploration and

development of mineral properties, fluctuations in commodity prices, counterparty risk, market conditions, regulatory

decisions, competitive factors in the industries in which the Company operates, prevailing economic conditions,

changes to the Company’ s strategic growth plans, and other factors, many of which are beyond the control of the

Company. The Company believes that the expectations reflected in the forward -looking information are reasonable,

but no assurance can be given that these expectations will prove to be correct and such forward-looking information

should not be unduly relied upon. In making the forward-looking statements in this press release, the Company has

applied several material assumptions. Any forward-looking information contained in this news release represents the

Company’ s expectations as of the date hereof and is subject to change after such date. The Company disclaims any

intention or obligation to update or revise any forward -looking information whether as a result of new information,

future events or otherwise, except as required by applicable securities legislation.