Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ROAR.V ·

King’s Bay Receives Assays for Lynx Lake Copper- Cobalt Property in Labrador

Corporate Updates

Suite 1450 – 789 West Pender Street, Vancouver, BC, V6C 1H2 | Tel: 604.681.1568 | Fax: 604.681.8240

King’s Bay Receives Assays for Lynx Lake Copper- Cobalt Property

in Labrador

Vancouver, January 16 th, 2018 – King’s Bay Resources Corporation (TSX.V: KBG), (FSE: KGB1) , is pleased to announce

that it has received the assays back from Phase 1 of the drilling on King’s Bay’s 100% owned Lynx Lake Copper-Cobalt

Project in southeastern Labrador.

King’s Bay completed two diamond drill holes totaling 501.9 meters of drilling spaced 156.0 meters apart at the Lynx

Lake Property.

The assay highlights are as follows:

Hole # Interval Width

(From-To)

Ni % Co % Ni + Co (%)

LL-17-01 over 115.2m

(47.6 – 162.8)

0.058 0.013 0.071

LL-17-02 over 110.8m

(57.1-167.9)

0.057 0.014 0.071

***Drill holes represent approximate true widths, true widths cannot be determined at this time.

***Standard deviation for Ni=105.0 ppm and Co =23.5 ppm.

 The assay results obtained are above background levels for nickel and cobalt and extend to over 100 meters at

depth with a lateral extent of at least 156 meters. This indicates that there could be potential for a more

localized zone of economic mineralization in the area.

 These drill results represent only a small fraction of the King’s Bay land package, which is approximately

242 km².

 Fire assays for Au, Pt, Pd are pending and expected to be received in late January 2018.

To view a map of the drill hole locations, visit https://www.kingsbayres.com/site/assets/files/1/18-01-16-

KBG_Lynx_Lake_JEA.pdf.

2018 Exploration Plan

King’s Bay is currently reviewing results and plan to assemble a team specializing in geostatistics and structural analysis

to delineate additional drilling targets to identify potential zones of economic mineralization. More work will be

conducted in the southern claims at Lynx Lake in the 2018 field season.

The drill hole placement and orientation were determined based upon the amalgamation of the previously flown VTEM

survey anomalies and the bedrock structure in the West Pit. The previously announced VTEM results identified an

anomaly that is anticipated to be ranging in depth from 50-300 meters and estimated to be approximately 400 meters

in diameter.

Suite 1450 – 789 West Pender Street, Vancouver, BC, V6C 1H2 | Tel: 604.681.1568 | Fax: 604.681.8240

Kevin Bottomley states “The results from our 2 preliminary holes at Lynx Lake are encouraging. The fact that we are

encountering similar geochemical results in both holes that are over 150 meters apart is significant. Lynx Lake is road

accessible from right off the Trans Labrador highway. This will allow King’s Bay to continue to define the area at a

relatively low cost.”

Lynx Lake Project

The Lynx Lake Copper-Cobalt Property consists of 959 mineral claims encompassing a land area of approximately 240

square kilometers, located 100 kilometers southeast of Happy Valley Goose Bay, Newfoundland and Labrador. The

“west pit” has been historically sampled yielding assays of up to 1.03% Copper, 0.56% Cobalt, 0.23% Vanadium, 0.10%

Nickel and 5.0g/t Silver. The Lynx Lake Project has returned historical grab samples assaying up to 1.39% Cu, .94% Co,

.21% Ni and 6.5g/t Ag. The Project is located directly adjacent to a 3 phase powerline and the Trans- Labrador Highway.

The “grab samples” are selected samples and are not necessarily representative of the mineralization hosted on the

property.

Quality Assurance/Quality Control and Analytical Method

The Company has implemented a quality assurance and quality control (QA/QC) program to ensure and validate the

accuracy and precision of the assay results. QA/QC protocols include the insertion of blanks, duplicates, and certified

reference materials (standards) every 10-20 samples. Drill core was sampled utilizing two techniques. For non-

mineralized zones, 3m composite samples were collected. For mineralized zones and intervals of interest, 1-2m saw-cut

samples were collected and sent for assay. Samples have been submitted for assay to Eastern Analytical in Springdale,

Newfoundland & Labrador, for base and precious metal analysis using Inductively Coupled Plasma (ICP) and Ore Grade

Assay (Multi-Acid Digestion).

About King’s Bay

King’s Bay is a mineral exploration company that is focused on the exploration of cobalt and other high-tech metals in

North America. The Company believes in this emerging fast-growth sector and will continue to seek out and evaluate

properties that show promise for development. The Company’s head office is in Vancouver, Canada.

NI 43-101 Disclosure

Nicholas Rodway, P. Geo. supervised the preparation of the technical information in this news release and is a qualified

person as defined by National Instrument 43-101.

On Behalf of the Board

Kevin Bottomley, President & Chief Executive Officer

O: 604 681 1568

E: [email protected]

Suite 1450 – 789 West Pender Street, Vancouver, BC, V6C 1H2 | Tel: 604.681.1568 | Fax: 604.681.8240

For Investment Inquiries please contact:

Jared Rushton

O: 604 681 1568

E: [email protected]

Forward Looking Statements

This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors that could cause actual

events or results to differ from those projected in the forward-looking statements. These forward-looking statements are subject to a variety of risks and

uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking

information. Forward looking statements in this news release include that there could be potential for a more localized zone of economic mineralization

in the area; that fire assays for Au, Pt, Pd are pending and expected to be received in late January 2018; and that we can define our resources at relatively

low cost. Risks that could change or prevent these statements from coming to fruition include that the Company may not raise sufficient funds to carry

out our plans, changing costs for mining and processing; increased capital costs; the timing and content of upcoming work programs which might be

delayed, included receiving results from programs; geological interpretations based on current data that may change with more detailed information;

potential process methods and mineral recoveries assumption based on limited test work and by comparison to what are considered analogous deposits

that with further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and despite the current

expected viability of the project, that the minerals on our property cannot be economically mined, or that the required permits to build and operate the

envisaged mine cannot be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no

responsibility to update or revise such information to reflect new events or circumstances, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.