Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RMI.V ·

Ridgestone Secures Mill Ahead of Bulk Sample at Rebeico

Metallurgy & Processing

Ridgestone Secures Mill Ahead of Bulk

Sample at Rebeico

Vancouver, British Columbia--(Newsfile Corp. - July 27, 2020) - Ridgestone Mining Inc.

(TSXV: RMI) (OTCQB: RIGMF) (FSE: 4U5) ("Ridgestone") is pleased to announce it

has entered into a toll milling agreement with a nearby mill to process bulk samples

from historic dumps of the Alaska vein. Additionally, the Company has also received

bids from mining contractors to rehabilitate historical underground workings along the

Alaska vein to facilitate underground and bulk sampling.

Highlights

• Fixed-price toll milling agreement with nearby (~40km) Real Viejo flotation

mill for up to 300 tonnes per day;

• Bulk samples planned to process historical surface dump material grading

up to 16.85 g/t gold and 2.70% copper;

• Rehabilitation of historical underground workings on the Alaska Vein to map

and sample zones in the vicinity of drill-hole intervals that assayed 36.1g

Au/t and 1.22% Cu over 1.5 meters, and 8.31g Au/t and 2.41% Cu over 3.25

meters in 2018.

Mr. Jonathan George, CEO, commented "Entering into this toll milling agreement for the

Real Viejo mill, which is only 40 kilometres from our high-grade Alaska vein, provides

an opportunity to capitalize on today's strong gold and copper prices. Using a phased

approach, we will look to reprocess the historical dumps and to begin rehabilitation of

the historical workings which will provide safe access for extensive underground

mapping and sampling."

A toll milling agreement has been established with Exploracíon Y Desarrollo Desierto

S.A. de C.V. ("EDDSA") for the nearby Real Viejo mill for up to 300 tonnes per day. The

Real Viejo mill is a recently-refurbished flotation mill with crushing and grinding circuits

capable of producing a gold-copper-silver concentrate. The agreement outlines a fixed

price ("tolling price") for up to 300 tonnes per day at the Company's discretion.

In conjunction with the toll milling agreement, the Company is planning to process one

or more bulk samples from historical surface waste-rock dumps of material previously

extracted from the Alaska vein. The Company intends to process the higher-grade

material first, such as that from the Veta Grande dump, samples of which assayed up to

16.85g Au/t and 2.70% Cu as summarized in Ridgestone's June 13, 2019 press

release. Processing of the bulk samples will provide metallurgical response information

which will assist in the evaluation of the recovery characteristics of oxide and

transitional material in the upper zones of the Alaska vein, and will be used for internal

assessments of potential contract mining scenarios. Ridgestone has all the requisite

permits required for the processing of the bulk sample which is expected to commence

in the coming months.

The Company has received a number of bids from Mexican-based contract mining

groups for the rehabilitation of old workings along the Alaska vein, initially focusing on

the "Veta Grande" portion, where drilling in 2018 by the Company intersected 8.31g Au/t

and 2.41% Cu over 3.25 meters from 84.9 to 88.2 meters in hole 18REB6,

approximately 10 meters vertically below the projection of old workings and 80 meters

below the surface. Hole 18REB2, collared approximately 80 meters south of 18REB6

returned assays of 8.69g Au/t and 2.78% Cu over 2 meters from 127 to 129 meters,

about 40 meters below the projection of old workings at a vertical depth of 130 meters

below surface. Hole 18REB10, collared 200 meters south of hole 18REB6, returned

36.10g Au/t and 1.22% Cu over 1.5 meters from 103.64 to 105.14 meters at a vertical

depth of 130 meters below surface and approximately 75 meters south of the workings

(c.f. January 17, 2019 press release).

The Alaska vein was mined intermittently during the 1930's to 1950's over several

hundreds of meters along strike and reaching depths of 50 to 70 meters below the

surface. Incomplete smelter records show that Compania Minera Alaska shipped small

tonnages of material to the El Paso Smelting Works with weighted average grades of

20.2g Au/t, 60.3g Ag/t and 9.18% Cu as summarized in the Company's NI 43-101

Technical Report on the project, which was completed on April 25th, 2018. The

moderately to steeply dipping vein has been traced over 1.2 kilometers along strike and

remains sparsely drilled below 70 meters from surface.

The technical information in this news release has been reviewed and approved by Mr.

Steven I. Weiss, PhD, CPG, a qualified person as defined by National Instrument 43-

101. Mr. Weiss is independent of Ridgestone Mining and YQ Gold, and all their

respective subsidiaries.

About Ridgestone Mining Inc.

Ridgestone is a Canadian mineral exploration company focused on its wholly-owned,

high-grade Rebeico gold-copper project located in Sonora, Mexico.

For further information, please contact:

MarketSmart Communications Inc.

Telephone: 877-261-4466

[email protected]

This news release contains forward-looking statements or information (collectively

referred to herein as "forward-looking statements"). Such statements are subject to risks

and uncertainties that may cause actual results, performance or developments to differ

materially from those contained in the statements and are not guarantees of future

performance of the Company. In this news release such statements include but are not

limited to any ongoing drilling programs, timing of such programs, or exploration results.

No assurance can be given that any of the events anticipated by the forward-looking

statements will occur or, if they do occur, what benefits the Company will obtain from

them. These forward-looking statements reflect management's current views and are

based on certain expectations, estimates and assumptions which may prove to be

incorrect. A number of risks and uncertainties could cause our actual results to differ

materially from those expressed or implied by the forward-looking statements, including

those described in the Company's regulatory filings available on www.sedar.com.

Should one or more of these risks or uncertainties materialize, or should any of the

Company's assumptions prove incorrect, actual results may vary in material respects

from those projected in the forward-looking statements. Readers are cautioned that the

foregoing list of risks, uncertainties and other factors is not exhaustive. Unpredictable or

unknown factors not discussed could also have material adverse effects on forward-

looking statements. The impact of any one factor on a particular forward-looking

statement is not determinable with certainty as such factors are dependent on other

factors, and the Company's course of action would depend on its assessment of the

future considering all information then available. All forward-looking statements in this

news release are expressly qualified in their entirety by these cautionary statements.

Except as required by law, the Company assumes no obligation to update forward-

looking statements should circumstances or management's estimates or opinions

change.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term

is defined in the policies of the TSX Venture Exchange) accepts responsibility for

the adequacy or accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/60585