Rokmaster intersects 565.76 g/t AgEq over 28.50 m, including 1,233.45 g/t AgEq over 5.30 m at Revel Ridge

Drill Results

Rokmaster intersects 565.76 g/t AgEq over

28.50 m, including 1,233.45 g/t AgEq over 5.30

m at Revel Ridge

VANCOUVER, BC

,

July 17, 2023

/CNW/ - Rokmaster Resources Corp. (TSXV: RKR) (OTCQB:

RKMSF) (FSE: 1RR1) ("Rokmaster" or "the Company") is pleased to announce the first set of assay

results and the completion of a diamond drilling program on the Revel Ridge Project ("Revel Ridge").

Figure 1 - Drill Plan Map (CNW Group/Rokmaster Resources Corp.)

Crews completed another phase of diamond drilling on the Revel Ridge Project in June. A total of

1,969 metres of diamond drilling were completed in nine drillholes (

Figure 1

), all of which

successfully reached the targeted mineralized zones. Assay results from the first three drillholes

(RR23-110 to RR23-112) as well as rushed assay results from drillholes RR23-114 and RR23-115

are presented below. The Company will release the remaining assays from this phase of drilling

when results are available.

Table 1: Revel Ridge 2023 Drillcore Assay Results

1-5

DDH

From (m)

To (m)

Length (m)

AuEq g/t

Au g/t

Ag g/t

Pb %

Zn %

Zone

RR23-110

111.80

112.30

0.50

1.95

1.94

0.50

0.00

0.00

RRMZ

DDH

From (m)

To (m)

Length (m)

AuEq g/t

Au g/t

Ag g/t

Pb %

Zn %

Zone

RR23-111

147.58

148.60

1.02

3.88

3.85

1.13

0.05

0.02

RRMZ

DDH

From (m)

To (m)

Length (m)

AuEq g/t

Au g/t

Ag g/t

Pb %

Zn %

Zone

RR23-112

227.40

227.83

0.43

3.52

3.03

8.00

0.42

0.96

RRMZ

RR23-112

231.00

231.50

0.50

7.41

7.35

2.00

0.07

0.08

RRMZ

RR23-112

233.80

234.40

0.60

4.76

4.75

0.50

0.01

0.01

RRMZ

DDH

From (m)

To (m)

Length (m)

AuEq g/t

Au g/t

Ag g/t

Pb %

Zn %

Zone

RR23-114

352.00

352.90

0.90

4.66

3.88

28.00

0.52

1.15

RRMZ

DDH

From (m)

To (m)

Length (m)

AgEq g/t

AuEq g/t

Au g/t

Ag g/t

Pb %

Zn %

Zone

RR23-115

73.20

101.70

28.50

565.76

4.35

0.11

60.54

2.64

6.67

RRYZ

including

75.10

80.40

5.30

1,233.45

9.48

0.14

125.70

5.54

14.78

RRYZ

including

95.95

101.70

5.75

654.38

5.03

0.29

82.49

3.80

6.99

RRYZ

DDH

From (m)

To (m)

Length (m)

AuEq g/t

Au g/t

Ag g/t

Pb %

Zn %

Zone

RR23-115

134.80

136.60

1.80

5.63

3.11

56.22

3.31

3.45

RRMZ

including

135.20

135.60

0.40

13.76

7.99

101.00

5.66

10.39

RRMZ

Footnote

1. Reported widths of mineralization are drill hole intervals or core lengths recovered. Insufficient data exists to permit the calculation of true width of the reported

mineralized intervals.

Footnote 2. Mineralized Zone abbreviations: RRMZ: Revel Ridge Main Zone, RRYZ: Revel Ridge Yellowjacket Zone.

Footnote 3. AuEq and AgEq calculations use: Metal prices of Au US$1,750/oz, Ag US$22/oz, Pb US$0.95/lb, Zn US$1.26/lb;

Footnote 4. Main Zone process recoveries of Au 96%, Ag 85%, Pb 71%, Zn 70%; Yellowjacket Zone process recoveries of Au 86%, Ag 94%, Pb 88%, Zn 93%;

Footnote 5. RRMZ AuEq = Au g/t + (Ag g/t x 0.010) + (Pb% x 0.265) + (Zn% x 0.314); RRMZ AgEq = Ag g/t + (Au g/t x 101.478) + (Pb% x 26.933) + (Zn% x 31.847); RRYZ AuEq =

(Ag g/t x 0.008) + (Pb% x 0.310) + (Zn% x 0.457); RRYZ AgEq = Ag g/t + (Pb% x 40.588) + (Zn% x 59.737)

Drillhole RR23-115 was completed to obtain a more optimal intersection of the Yellowjacket Zone

("RRYZ") proximal to the 830 Portal. A series of drillholes completed from underground in 1990-

1991 by Equinox Resources are oriented to the northeast and essentially down-dip of the RRYZ.

This earlier drilling also did not intersect the Main Zone ("RRMZ") as a consequence of drilling

toward the northeast, leaving a large gap (~180 m) lacking drillhole intersections through the RRMZ

down-dip of the 830 Portal. As shown in Table 1 and

Figure 2

, RR23-115 encountered a wide

intersection of RRYZ as well as a strong RRMZ intersection which considerably improves the

understanding of the mineralization and geology in this area.

Drillhole RR23-114 was collared

930 m

northwest of the 830 Portal and cored a relatively strong

RRMZ approximately

150 m

down-dip of RR21-58. This intersection is important in the fact it is

~370 m to the northwest of the 2022 drilling which successfully extended the RRMZ at depth. It is

noted that all of the shallower 2021 drillholes to the northwest all encountered the Main Deformation

Zone ("MDZ"), the ductile deformation zone which hosts RRMZ sulphide mineralization. Drillhole

RR23-114 indicates that mineralization persists beyond the 2023 MRE in this area and that further

follow-up drill testing around it and at deeper levels along the entire drill-defined strike length (5.7

km) of the MDZ is warranted (

Figure 3

).

The first three drillholes (RR23-110, -111, and -112) of this phase of drilling were completed to the

southeast targeting the down-dip extension of the 2022 channel sampling on surface (see news

release dated

August 29, 2022

). All three drillholes successfully intersected the RRMZ and Au-Ag-

Pb-Zn grades in this area increased at depth (

Figure 3

). A notable feature of the deepest drillhole

from this set, RR23-112, is the occurrence of sphalerite mineralization within the RRMZ sulphides

where drillhole intersections and channel samples at higher elevations are endowed only with

arsenopyrite-gold mineralization. A similar situation is recorded to the northwest where sphalerite

mineralization is present in the deeper drillhole RR23-114 but is lacking in drillhole RR21-58 which

cored arsenopyrite-gold mineralization.

John Mirko, President and CEO, comments:

"The top-notch crews at Revel Ridge efficiently completed nearly

2,000 m

of drilling in 21 days of

drilling. The hard work paid off with this first batch of assays results recording very strong

mineralization in the Yellowjacket Zone in drillhole RR23-115, which will aid in future modelling of

the deposit. In addition, drillhole RR23-114 represents a significant extension of the RRMZ

370 m

to the northwest and the three drillholes completed to the southeast further exhibit the continuity of

the RRMZ and that grades in this area tend to increase at depth."

About Rokmaster

Rokmaster's flagship Revel Ridge Project is host to a high-grade gold and polymetallic orogenic

sulphide deposit which has been the subject of a PEA Technical Report dated

December 8, 2020

,

and an Updated Mineral Resource Estimate

1

on the Revel Ridge Property with an effective date of

June 6, 2023

. The 2023 drill program was designed to efficiently expand the volume of the Revel

Ridge Main Zone as defined by the 2023 Mineral Resource Estimate, which currently remains open

in all directions:

Measured & Indicated (M&I):

1.53 million

gold equivalent ("AuEq") Measured & Indicated (M&I)

ounces contained within 7.16 million tonnes with an average grade of 6.63 g/t AuEq.

Inferred (Inf):

1.49 million

AuEq ounces contained within 7.56 million tonnes at an average

grade of 6.11 g/t AuEq.

Footnote 1. Rokmaster Resources News Release dated June 13, 2023

Quality Assurance/Quality Control.

All drill core assay samples have been collected from ½ NQ

core, sawn with a diamond saw with the sample intervals marked by technical personnel. A full

QAQC program using blanks, standards and duplicates was utilized to monitor analytical accuracy

and precision. QAQC samples are submitted approximately at every 20th sample, or a minimum of

5% of the total sample stream. Appropriate standards are used to provide quality control information

on high grade and medium to low grade samples. A limestone blank is inserted after select samples

that have macroscale characteristics of higher-grade mineralization. Duplicate samples are repeat

analysis of designated primary sample pulps. The samples were sealed on site and shipped to

MSALABS in

Langley, British Columbia

. MSALABS is an ISO 17025 (Testing and Calibration

Laboratory) and an ISO 9001 (Quality Management System) Certified Laboratory. Drill core

samples were crushed to 2 mm and a 500-gram sub sample was pulverized with 85% of the sample

passing 75 microns. The sub-sample was analysed using a combination of MSALABS FAS211 for

Au and ICP–240 (4 acid digestion) for silver, base metals and other trace elements. FAS211 for

gold is an ore grade fire assay of a 50 g pulp with an AAS finish with a detection range between

0.01 and 100 ppm). ICP-240 utilizes four acid digestion and provides ore grade analytical data on

silver, base metals and 26 other elements.

The technical information in this news release has been prepared in accordance with Canadian

regulatory requirements as set out in National Instrument 43-101 and reviewed and approved by

Eric

Titley

, P.Geo., who is independent of Rokmaster and who acts as Rokmaster's Qualified Person.

On Behalf of the Board of Directors of

Rokmaster Resources Corp.

John Mirko

,

President & Chief Executive Officer.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term in defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

press release.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS: This news release may

contain forward-looking information within the meaning of applicable securities laws ("forward-

looking statements"). Forward-looking statements are statements that are not historical facts and

are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes,"

"intends," "estimates," 'projects," "potential" and similar expressions, or that events or conditions

"will," "would," "may," "could" or "should" occur. These forward-looking statements are subject to a

variety of risks and uncertainties which could cause actual events or results to differ materially from

those reflected in the forward-looking statements, including, without limitation: risks related to

fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned

work in a timely manner and on acceptable terms; changes in planned work resulting from weather,

logistical, technical or other factors; the possibility that results of work will not fulfill expectations and

realize the perceived potential of the Company's properties; risk of accidents, equipment

breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of

cost overruns or unanticipated expenses in the work program; the risk of environmental

contamination or damage resulting from Rokmaster's operations and other risks and uncertainties.

Any forward-looking statement speaks only as of the date it is made and, except as may be

required by applicable securities laws, the Company disclaims any intent or obligation to update any

forward-looking statement, whether as a result of new information, future vents or results or

otherwise.

Figure 2 - Cross Section of RR23-115 (CNW Group/Rokmaster Resources Corp.)

Figure 3 - Longitudinal Section (CNW Group/Rokmaster Resources Corp.)

SOURCE

Rokmaster Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/July2023/17/c2931.html

%SEDAR: 00031923E

For further information:

Mr. John Mirko, President & CEO of Rokmaster Resources Corp.,

[email protected], Ph. +1(604)290-4647 or by website: www.rokmaster.com; For shareholder

information please contact: Mike Kordysz, [email protected], Ph. +1(604)319-3171

CO: Rokmaster Resources Corp.

CNW 04:00e 17-JUL-23