Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RKR.V ·

Rokmaster Intersects 26.20 metres of 4.53 g/t AuEq, including 3.30 metres of 10.09 g/t AuEq at Revel Ridge

Drill Results

Rokmaster Intersects 26.20 metres of 4.53 g/t

AuEq, including 3.30 metres of 10.09 g/t AuEq

at Revel Ridge

VANCOUVER, BC

,

March 29, 2021

/CNW/ - Rokmaster Resources Corp. (TSXV: RKR) (OTCQB:

RKMSF) (FSE: 1RR1) ("Rokmaster" or the "Company") is pleased to present assay results of

diamond drill holes RR20-12 to RR21-33 from its ongoing drill program at the Revel Ridge Project.

Results demonstrate the remarkable continuity of structurally controlled gold-polymetallic

mineralization in the Revel Ridge Main Zone ("RRMZ") over a 1.2 kilometre vertical and more than

1.2 kilometre horizontal distance, with significant silver-zinc grades in an expanding Revel Ridge

Yellowjacket Zone ("RRYZ").

Highlights & Update:

Successful RRMZ intercepts over broad step outs beyond current resource

4.53 g/t AuEq over

26.20 m

in hole RR21-28

incl.

10.09 g/t AuEq over

3.3 m

3.18 g/t AuEq over

10.88 m

in hole RR20-16

incl.

7.14 g/t AuEq over

1.48 m

2.05 g/t AuEq over

12.70 m

in hole RR21-25

incl.

3.83 g/t AuEq over

2.62 m

3.41 g/t AuEq over

8.18 m

in hole RR20-14

incl.

8.95 g/t AuEq over

2.93 m

3.16 g/t AuEq over

7.63 m

in hole RR21-22

incl.

7.79 g/t AuEq over

2.62 m

Significant expansion of known RRYZ silver-zinc mineralization

2.60 g/t AuEq or 197.3 g/t AgEq over

9.92 m

in hole RR21-28,

750 m

from previously

known RRYZ mineralization.

5.93 g/t AuEq or 450.4 g/t AgEq over

2.90 m

in hole RR20-18,

200 m

from previously

known RRYZ mineralization.

Drilling continues – additional assay results pending

Mineralization remains open at depth and on strike for all zones

John Mirko

, President and CEO of Rokmaster Resources commented, "With 85% of drill holes

intercepting above-threshold NSR gold equivalent grades, with both impressive widths and over

broad step outs, we're pleased to see that the data supports the potential expansion of our known

gold equivalent resource. What's further impressive is we've now confirmed this portion (tested from

existing underground workings only) of RRMZ mineralization over 1.2 kilometre vertical and

horizontal distances. With on-strike surface occurrences suggesting the zones could continue for

eight to nine kilometres, our confidence in continuing to successfully intercept high-grade

mineralization grows as we learn more about these deposits."

Since late last September, Rokmaster has completed 35 diamond drill holes (the majority of which

are located outside of the current resource) in the 2020 and 2021 programs to date, totalling

13,448

m

of NQ™ sized drill core. The plan map illustrating the locations of all of the drillholes collared to

date in the 2020 and 2021 programs is presented on the digital link

Figure 1. Plan View Collar Locations

,

the block model diagram showing the location of all drillholes

completed in 2020 and 2021 is presented on the digital link

Figure 2. RRMZ Block Model

, and the

Inclined Long Section showing 2020-2021 drill hole locations is presented on the digital link

Figure 3.

RRMZ inclined Longitudinal Section

.

Figures 1, 2 and 3 are also available on

www.rokmaster.com/projects/revel-ridge/

The results obtained from 21 drillholes, RR21-12 to RR21-33, are documented in this press

release.

1, 2.

These drillholes tested a large volume of the RRMZ over a strike length exceeding

1,200 m

. The results of these drillholes are compiled on Table 1. The significance of these results is

summarized here:

1

.

Rokmaster drilling undertook broad step outs, with 85% of holes intercepting above-

threshold grades:

Out of 21 drillholes, 18 (85%) cut gold-equivalent grades and widths in drill

core which would meet the threshold of contributing to the gold equivalent net resource, using

the NSR cut-off grades as documented in the 2020 PEA Technical Report filed on SEDAR

(Rokmaster NR dated

December 8, 2020

). This observation is even more significant as the

drillholes targeting the RRMZ utilized broad step outs averaging

82 m

to a maximum of

130 m

between pierce points throughout the RRMZ.

2

.

Significant zinc-silver mineralization was encountered

750 m

southeast of the

historically defined RRYZ:

Strong, thick, RRYZ silver-zinc rich mineralization has re-

emerged. This is particularly true with respect to DDH RR21-28 which cut a drill indicated

width of

9.92 m

of 2.6 g/t AuEq or 197.17 g/t AgEq in the newly discovered extension of the

RRYZ and is followed by a superb RRMZ intersection of

26.2 m

of 4.54 g/t AuEq or 344.17 g/t

AgEq. Strong RRYZ style mineralization is developing

750 m

to the southeast of the original

silver rich RRYZ zone discovered in 1991. A zinc-silver intersection obtained from DDH RR21-

25 has some similarities in the alteration and sulphide mineralogy to the thicker silver-zinc

rich intersection obtained in RR21-28. The two intersections are separated by a distance of

100 m

and with the zone remaining open along the north directed plunge line. It is

unequivocal, that new mineralized zones are being, and remain to be discovered, at Revel

Ridge.

3

.

Mineralization continues to exhibit remarkable continuity:

Within the RRMZ the current

technical data again suggests that the intensity of the deformation zone and the mineralogy

and grade of mineralization is remaining remarkably consistent over long vertical distances,

with DDH RR21-14 coring

2.93 m

of 8.95 g/t AuEq. The intersection obtained in DDH RR21-30

is approximately

1.2 kms in elevation

below the mineralized surface trace of the RRMZ

Mineralization. Preliminary technical data may suggest that gold grades when viewed as

grade thickness profiles are increasing to the northwest.

4

.

Rokmaster has successfully expanded the area of known mineralization:

The location of

the 2020 to 2021 drillholes in the Rokmaster drill program are outlined on the attached

Figure 2. RRMZ 3-D Block Model

, also available at

www.rokmaster.com

. The data

convincingly demonstrates that the Rokmaster drill program has successfully tested larger

volumes of mineralized rock, in a shorter period of time, than at any period in the 115-year

exploration history of the Revel Ridge deposit.

Table 1. Summary of the Selected Assay Results of Revel Ridge Main Zone Mineralization

DDH

From

(m)

To

(m)

Length

(m)

Au

g/t

Ag

g/t

Pb

%

Zn

%

Zone

AuEq

g/t

AgEq

g/t

RR20-12

337.30

341.90

4.60

2.67

17.96

0.92

1.51

RRMZ

3.98

including

339.88

340.93

1.05

11.29

77.00

3.96

6.03

RRMZ

16.71

and

358.50

362.30

3.80

3.72

7.99

0.14

0.24

RRFW

3.99

including

358.50

359.45

0.95

12.94

9.00

0.13

0.51

RRFW

13.35

RR20-13

Hole Abandoned due to extreme azimuth deviation

RR20-14

250.00

251.75

1.75

8.85

11.50

0.38

0.81

RRHW

9.53

including

250.00

250.70

0.70

21.77

28.00

0.95

2.00

RRHW

23.46

and

305.82

314.00

8.18

2.15

15.54

0.51

1.83

RRMZ

3.41

including

305.82

308.75

2.93

5.73

36.77

1.36

4.69

RRMZ

8.95

and including

305.82

306.35

0.53

10.84

141.00

5.58

7.59

RRMZ

18.48

RR20-15

407.43

410.10

2.67

7.34

63.20

3.943

2.87

RRMZ

11.10

RR20-16

259.50

270.38

10.88

0.93

23.10

1.10

3.22

RRMZ

3.18

including

259.50

263.45

3.95

0.08

40.84

2.01

5.82

RRMZ

4.15

and including

267.90

269.38

1.48

5.80

20.13

0.80

1.61

RRMZ

7.14

and

285.38

289.20

3.82

3.78

15.31

0.28

0.97

RRFW

4.55

including

288.55

289.20

0.65

10.80

43.00

1.44

5.56

RRFW

14.55

RR20-18

264.20

267.10

2.90

0.08

44.57

2.64

8.98

RRYZ

5.93

450.4

and

343.55

347.50

3.95

2.88

26.58

0.96

2.05

RRMZ

4.58

including

347.05

347.50

0.45

19.67

0.50

0.05

0.01

RRMZ

19.70

RR20-19

330.35

337.30

6.95

2.78

3.50

0.17

0.47

RRFW

3.11

including

330.35

330.80

0.45

39.25

29.00

1.81

6.08

RRFW

43.21

RR20-20

358.70

361.11

2.41

2.81

19.57

0.96

4.34

RRMZ

5.49

including

359.73

361.11

1.38

4.33

31.94

1.49

7.45

RRMZ

8.84

RR21-21

441.40

443.50

2.10

2.08

23.10

1.28

3.19

RRMZ

4.39

RR21-22

472.22

479.85

7.63

2.40

7.91

0.30

1.15

RRMZ

3.16

including

472.22

474.84

2.62

5.74

19.58

0.81

3.14

RRMZ

7.79

RR21-23

526.05

527.05

1.00

7.22

4.00

0.32

0.41

RRMZ

7.59

RR21-25

385.60

398.30

12.70

0.71

9.51

0.36

2.29

RRMZ

2.05

including

385.60

395.12

9.52

0.70

10.92

0.41

2.79

RRMZ

2.32

and including

392.50

395.12

2.62

0.05

10.62

0.49

7.36

RRMZ

3.83

RR21-26

386.70

388.80

2.10

4.29

33.43

0.69

0.44

RRMZ

5.21

RR21-28

382.20

392.12

9.92

0.06

19.04

1.34

3.73

RRYZ

2.60

197.3

including

387.50

392.12

4.62

0.12

37.67

2.66

6.83

RRYZ

4.88

370.4

and including

387.50

388.50

1.00

0.34

116.00

8.94

17.48

RRYZ

13.63

1035.5

and

425.10

451.30

26.20

1.73

14.38

0.75

4.95

RRMZ

4.53

344.3

including

425.60

428.90

3.30

5.11

15.50

0.68

9.61

RRMZ

10.09

766.4

and including

449.50

451.30

1.80

12.93

19.67

0.56

0.50

RRMZ

13.65

1036.6

RR21-29

299.53

302.73

3.20

4.88

13.89

0.54

0.40

RRMZ

5.46

including

299.53

300.23

0.70

19.67

19.00

0.92

0.42

RRMZ

20.48

RR21-30

541.85

545.85

4.00

0.88

26.95

2.00

2.42

RRMZ

3.17

including

542.85

543.65

0.80

4.24

105.00

8.11

9.03

RRMZ

13.09

RR21-31

334.05

336.45

2.40

1.71

43.49

2.98

3.29

RRMZ

5.02

RR21-32

348.85

351.00

2.15

0.10

23.77

1.08

5.82

RRMZ

3.57

and

428.00

431.90

3.90

1.31

12.00

0.61

2.96

RRYZ

3.10

RR21-33

349.35

355.22

5.87

2.65

21.19

0.21

0.01

RRMZ

3.02

including

353.30

355.22

1.92

4.76

50.48

0.46

0.03

RRMZ

5.62

Reported widths of mineralization are drill hole intervals or core length recovered. Insufficient data

exists to permit the calculation of true widths of the reported mineralized intervals.

*The metal values used in the gold equivalent calculations of

US$1,561

/oz Au,

US$20.55

/oz silver,

US$0.91

/lb lead and

US$1.07

/lb zinc, are based on the consensus average long-term price

forecasts published by a major commercial bank at the end of October, 2020, as per the Technical

Report, with an effective date of

December 8, 2020

by Micon International Limited, entitled: An

Updated Preliminary Economic Assessment Of The Revel Ridge Project,

Revelstoke, BC

,

Canada

,

for Rokmaster Resources Corp. The formula used to calculate gold equivalence for the RRMZ and

RRFZ is: AuEq = Au g/t + (Ag g/t x 0.013) + (Pb% x 0.4) + (Zn% x 0.47). The formula used to

calculate silver equivalence for the RRYJ is: AgEq = Ag g/t + (Au g/t x 75.96) + (Pb% x 30.3) +

(Zn% x 35.6).

Quality Assurance/Quality Control.

Dr.

Jim Oliver

, P. Geo., supervised all aspects of the drilling

and sampling undertaken in the 2020 underground diamond drill program. All samples have been

collected from ½ NQ™ core, sawn with a diamond saw with the sample intervals marked by

technical personnel. A full QAQC program using blanks, standards and duplicates was utilized to

monitor analytical accuracy and precision. The samples were sealed on site and shipped to MSA

Labs in

Langley, British Columbia

. MSA is an ISO 17025 (Testing and Calibration Laboratory) and

an ISO 9001 (Quality Management System) Certified Laboratory. Core samples were crushed to 2

mm and a 250 gram sub sample was pulverized with 85% of the sample passing 75 microns. The

sub sample was analysed using a combination of MSA Labs FAS211 for Au and ICP–240 (4 acid

digestion) for silver, base metals and other trace elements. FAS211 for gold is an ore grade fire

assay of a 30 g pulp with an AAS finish with a detection range between 0.01 and 100 ppm). ICP-

240 utilizes four acid digestion and provides ore grade analytical data on silver, base metals and 26

other elements.

Footnotes:

1

.

DDH RR21-13 is excluded from this press release. The drill hole was abandoned well short of

its proposed target depth due to excessive borehole deviation and is excluded from Table 1.

2

.

An NSR value of approximately

$125

over a width of

2.5 m

was the criteria used in

determining whether a drillhole had a reasonable potential of contributing to the net gold

equivalent resource. DDH's RR21-17, RR21-24 and RR21-27 do not meet that criteria and are

excluded from Table 1.

The technical information in this news release has been prepared in accordance with Canadian

regulatory requirements as set out in National Instrument 43-101 and reviewed and approved by

Mark Rebagliati

, P. Eng., FEC, who is independent of Rokmaster.

On Behalf of the Board of Directors of

Rokmaster Resources Corp.

John Mirko

,

President & Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term in defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

press release.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS: This news release may

contain forward-looking information within the meaning of applicable securities laws ("forward-

looking statements"). Forward-looking statements are statements that are not historical facts and

are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes,"

"intends," "estimates," 'projects," "potential" and similar expressions, or that events or conditions

"will," "would," "may," "could" or "should" occur. These forward-looking statements are subject to a

variety of risks and uncertainties which could cause actual events or results to differ materially from

those reflected in the forward-looking statements, including, without limitation: risks related to

fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned

work in a timely manner and on acceptable terms; changes in planned work resulting from weather,

logistical, technical or other factors; the possibility that results of work will not fulfill expectations and

realize the perceived potential of the Company's properties; risk of accidents, equipment

breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of

cost overruns or unanticipated expenses in the work program; the risk of environmental

contamination or damage resulting from Rokmaster's operations and other risks and uncertainties.

Any forward-looking statement speaks only as of the date it is made and, except as may be

required by applicable securities laws, the Company disclaims any intent or obligation to update any

forward-looking statement, whether as a result of new information, future events or results or

otherwise.

SOURCE

Rokmaster Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2021/29/c6711.html

%SEDAR: 00031923E

For further information:

please contact Mr. John Mirko, CEO of Rokmaster Resources,

[email protected], Ph. 1-604-290-4647 or the Company's website: www.rokmaster.com

CO: Rokmaster Resources Corp.

CNW 06:00e 29-MAR-21