Gitennes Update ON Diamond Drilling ON the Snowbird High Grade GOLD Project Favourable Host ROCK Intersected IN All Drill Holes
Suite 1010 – 789 West Pender Street, B.C. V6C 1H2 Tel: 604-682-7970
email: [email protected] website: www.gitennes.com
GITENNES UPDATE ON DIAMOND DRILLING ON THE SNOWBIRD HIGH GRADE
GOLD PROJECT
FAVOURABLE HOST ROCK INTERSECTED IN ALL DRILL HOLES
Vancouver, British Columbia – November 3, 2017 – Gitennes Exploration Inc. (“Gitennes” or the
“Company”) has completed six diamond drill holes on its Snowbird High Grade Gold Project located in
north central BC. The Snowbird project is accessible year round via paved and dirt roads and sits at a
relatively low elevation with moderate relief (not exceeding 190 metres). The ease of access to all parts of
the property enables cost effective diamond drilling throughout the entire year.
High grade historical gold results at Snowbird a re directly associated with listwanite, a carbonatized-
silicified serpentinite. Listwanite is also associated with several multi -million ounce gold deposits in BC
and the Motherlode District in Califo rnia. Gitennes has intersected listwanite in all of its holes drilled in
the current programme.
Gitennes is drilling a minimum of 1,000 metres of core in this phase focusing on the North and Main
Zones along the Snowbird structure. The Company’s field work over the past several months has
delineated the strike extent of the Snowbird gold bearing structure for over 2.5 kilometres. The favourable
host rocks intersected in the drilling are being cut with a core saw and all cut samples will be submitted to
ALS Global upon completion of this phase for analysis . In order to maintain the highest confidence and
integrity in analytical results Gitennes’ sampling protocol requires that commercially vetted standards and
blanks are systematically inserted into the sample sequence. Duplicate samples are also being taken in
order to provide a check on analyses . The results of this programme will be used to plan the Company’s
next phase of diamond drilling.
About Gitennes Exploration Inc.
Gitennes is in the business of exploring for and advancing mineral deposits. The Company currently has
two gold exploration properties, Hixon and Snowbird, both in British Columbia and a 1% Net Smelter
Returns royalty on the 18 million ounce Urumalqui Silver Project in Peru.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved
by D. Fraser (P.Geo.), technical advisor to the Company, who is a "qualified person" within the meaning
of National Instrument 43-101.
For further information on the Company, readers are referred to the Company's website at
www.gitennes.com and its Canadian regulatory filings on SEDAR at www.sedar.com.
Gitennes Exploration Inc.
"Ken Booth"
Ken Booth
President
For further information, please contact: Ken Booth
Phone: 604-682-7970 Email: [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary Note Regarding Forward-Looking Information
This news release includes certain statements that constitute "forward-looking information" within the meaning of
applicable Canadian securities laws concerning the business, operations and financial performance and condition of
the Company. All statements in this news release that are not purely historical are forward -looking statements and
include any statements regarding beliefs, plans, expectations and orientations regarding the future. Often, but not
always, forward-looking statements can be identified by words such as "pro forma", "plans", "expects", "may",
"should", "budget", "schedules", estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations
of such words including negative variations thereof and phrases that refer to certain actions, events or results that
may, could, would, might or will occur or be taken or achieved. Such forward-looking statements include, among
others, statements as to the anticipated business plans and timing of future activities of the Company, including the
exercise of the option to acquire the Snowbird Project and to conduct exploration activities thereon. Actual results
could differ from those projected in any forward-looking statements due to numerous factors including risks and
uncertainties relating to exploration and development and actual results of exploration activities; the ability of the
Company to obtain additional financing; delays in obtaining governmental and regulatory approvals (including the
TSX Venture Exchange), permits or financing; the need to comply with environmental and governmental
regulations; potential defects in title to the Company's properties; fluctuations in the prices of commodities and
precious metals; operating hazards and risks; environmental issues and liabilities; and competition and other risks
and uncertainties of the mining industry. Although the Company believes that the beliefs, plans, expectations and
intentions contained in this news release are reasonable, there can be no assurance that those beliefs, plans,
expectations or intentions will prove to be accurate. Readers should consider all of the informatio n set forth herein
and should review the Company’s periodic reports filed from time-to-time with Canadian securities regulators.
These reports and the Company's filings are available at www.sedar.com.
Readers are cautioned not to place undue reliance on forward-looking statements. The forward-looking statements
contained in this news release are made as of the date of this news release and, except as otherwise required by law,
the Company undertakes no obligation to update the forward-looking statements contained herein, or to update the
reasons why actual results could differ from those projected in these forward-looking statements.