Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

REVX.V ·

Gitennes Receives Multi-year Permit to Drill Snowbird High Grade Gold Project

Exploration Programs Permits & Approvals

Suite 1010 – 789 West Pender Street, B.C. V6C 1H2 Tel: 604-682-7970

email: [email protected] website: www.gitennes.com

Gitennes Receives Multi-year Permit to Drill Snowbird High Grade Gold Project

Vancouver, B.C., - April 24, 2018: Gitennes Exploration Inc. ("Gitennes" or the "Company") -

(TSXV – GIT) announces that it has received a multi -year drilling permit for its high grade

Snowbird gold project , located near Fort St. James, British Columbia. The Company has

permitted 65 sites with several sites designated for more than one diamond drill hole. The sites

that have been selected for drilling will cover all of the gold bearing zones at Snowbird as well

as some of the prospective zones identified in the course of the 2017 programme . Gitennes

drilling programmes are testing a large strike extent , up to 2.3 km, that shows historic multi -

gram gold intersections and is open along strike.

With the permit now in hand the Company plans to commence drilling in June and has planned

a Phase II programme of up to 2,000 metres to foll ow up on the positive results from the drilling

programme in late-2017.

In November 2017 Gitennes comp leted 1,212 metres in ten holes at Snowbird with drilling in

both the North and Main Zones. Highlights from the Phase 1 drilling (Gitennes news release

December 13, 2017) are:

 Multi-gram intervals were intersected in seven out of 10 holes, and include:

 Hole SB17-04 - 16.20 g/t gold over 1.0 metre

 Hole SB17-02 - 9.73 g/t gold over 0.8 metres

 Hole SB17-08 - 8.24 g/t gold over 0.52 metres

 Eight of the ten drill holes intersected gold grades greater than one gram/tonne;

 Highest grade gold intersected at relatively shallow depth, approximately 50 metres

below the surface and remains open;

 High-grade gold intercepts occur within and adjacent to the 25 to 150 metre wide silica-

carbonate altered ultramafic unit in areas of high deformation (faulting/shearing) and are

associated with key pathfinder elements arsenic and antimony;

 Gold in quartz veins is hosted in the footwall and hanging wall of the ultramafic unit in

close proximity to a thick mudstone unit. This association is contained within the 4.8

kilometre long Sowchea Fault. Elevated gold, arsenic and antimony have historically

been determined to occur at several locations over 2.3 k ilometres of the Sowchea Fault.

This target remains to be thoroughly drill tested;

 Approximately 20% of all drill core samples returned anomalous gold (>0.1 g/t);

In the North Zone where the Phase II programme will commence , historical diamond drilling

results include:

o Hole 88-13 –16.26 g/t gold over 4.0 m, incl. 48.4 g/t gold over 1.0 m

o Hole 89-02 –11.89 g/t gold over 1.8 m , incl. 28.1 g/t gold over 0.6 m

o Hole 89-10 –9.63 g/t gold over 2.1 m, incl. 13.75 g/t gold over 1.1 m

o Hole 89-11 –7.66 g/t gold over 1.7 m, incl. 17.76 g/t gold over 0.6 m

Readers are cautioned that a "qualified person" (as defined by National Instrument 43 -101) has not yet completed sufficient work to

be able to verify the historical information, and therefore the information should not be relied upon.

About the Snowbird Gold Project

The Snowbird high grade gold project was optioned by Gitennes in February 2017. In 2017

Gitennes completed a high resolution ground magnetome ter survey, detailed mapping of the

Main Zone and completed 1,212 metres of diamond drilling. The Project covers approximately

3,100 hectares and is located 20 kilometres west of Fort St. James, British Columbia. Fort St.

James is a full service communit y providing infrastructure and skilled manpower. The Project is

orogenic in style and has been recognized as being similar to other lode gold systems that are

associated with terrane boundary structures and ophiolite complexes within the Cordillera.

Several well-known examples of significant past producers include the Motherlode District and

Quartz Hill in California and in British Columbia, Rossland, Bralorne and Barkerville. The

Snowbird project is accessible year round via paved and dirt roads and sits a t a relatively low

elevation with moderate relief (not exceeding 190 metres). The ease of access to all parts of the

property enables cost effective diamond drilling throughout the entire year.

About Gitennes Exploration Inc.

Gitennes is in the business of exploring for mineral deposits. Gitennes acquires properties

directly by staking, through option agreements with prospectors or other exploration companies,

and through reconnaissance programmes.

Qualified Person

The scientific and technical information contained in this news release has been reviewed and

approved by Dean Fraser (P.Geo.), who is a "qualified person" within the meaning of National

Instrument 43-101.

For further information on the Company, readers are referred to the Company’s website at

www.gitennes.com and its Canadian regulatory filings on SEDAR at www.sedar.com.

On behalf of the Board of Directors of

Gitennes Exploration Inc.

“Ken Booth”

Ken Booth

President

For further information, please contact: Ken Booth

Phone: 604-682-7970

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release.

Cautionary Note Regarding Forward-Looking Information

This news release includes certain statements that constitute "forward -looking information" within the meaning of

applicable Canadian securities laws concerning the business, operations and financial p erformance and condition of

the Company. All statements in this news release that are not purely historical are forward -looking statements and

include any statements regarding beliefs, plans, expectations and orientations regarding the future. Often, but not

always, forward -looking statements can be identified by words such as "pro forma", "plans", "expects", "may",

"should", "budget", "schedules", estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of

such words including negative variations thereof and phrases that refer to certain actions, events or results that may,

could, would, might or will occur or be taken or achieved. Such forward -looking statements include, among others,

statements as to the anticipated busi ness plans and timing of future activities of the Company, including the exercise

of the Option to acquire the Snowbird Project and to conduct exploration activities thereon. Actual results could differ

from those projected in any forward -looking statemen ts due to numerous factors including risks and uncertainties

relating to exploration and development and actual results of exploration activities ; the ability of the Company to

obtain additional financing; delays in obtaining governmental and regulatory ap provals (including of the TSX -V),

permits or financing; the need to comply with environmental and governmental regulations; potential defects in title to

the Company's properties; fluctuations in the prices of commodities and precious metals; operating hazards and risks;

environmental issues and liabilities; and competition and other risks and uncertainties of the mining industry .

Although the Company believes that the beliefs, plans, expectations and intentions contained in this news release are

reasonable, there can be no assurance that those beliefs, plans, expectations or intentions will prove to be accurate.

Readers should consider all of the information set forth herein and should review the Company’s periodic reports filed

from time -to-time with Canadian securities regulators. These reports and the Company's filings are available at

www.sedar.com.

Readers are cautioned not to place undue reliance on forward -looking statements. The forward-looking statements

contained in this news release are made as of the date of this news release and , except as otherwise required by

law, the Company undertakes no obligation to update the forward-looking statements contained herein, or to update

the reasons why actual results could differ from those projected in these forward-looking statements.