Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

REVX.V ·

Gitennes Receives Drilling Permit on Second High Grade Gold Project

Permits & Approvals

Suite 1010 – 789 West Pender Street, B.C. V6C 1H2 Tel: 604-682-7970

email: [email protected] website: www.gitennes.com

Gitennes Receives Drilling Permit on Second High Grade Gold Project

Vancouver, B.C. / TheNewswire / June 12, 2019 - Gitenne s Exploration Inc. (TSXV – GIT)

announces that it has been granted a multi-year drill ing and work permit for its high grade Maroon

gold project located 35 km north of Terrace, British Co lumbia. This permit is the second multi-year

drilling permit Gitennes has received, the first being on the High Grade Snowbird Gold Project near

Ft St James, BC on which Gitennes has completed two diam ond drill programmes totaling 2,800

metres.

The Maroon Property is strategically located in an active exploration area at the southern end of the

Golden Triangle and is bordered by Goliath Gold’s Lucky Strike Property (see map attached).

Goliath announced encouraging results from work on Lucky St rike in 2018 and will be conducting

further work on Lucky Strike this summer.

Gitennes conducted reconnaissance sampling and mapping at Maroon in 2018 with sampling

focused on the area around historical workings on the Be ar Vein (see news release dated October

3, 2018) .

Highlights from the sampling

Area Gold (g/t) Silver (g/t) Copper (%) Lead (%) Zinc (%)

Lower Adit – Bear

Vein (1) 50.4 183 0.42% 9.03% 2.01%

25.4 105 0.18% 4.74% 1.48%

17.15 120 0.55% 5.41% 4.31%

Upper Adit – Bear

Vein (1) 35.3 245 0.66% 13.85 % 3.90%

2.75 64.5 0.01% 2.72% 0.10%

Subcrop above

Bear Vein Adits (1) 6.67 38.9 0.11% 1.51% 11.45 %

7.78 70.1 0.05% 3.62% 10.00%

Bear Vein Dump

Material (2) 104.5 277 0.07% 14.55 % 10.90 %

24.9 96 0.06% 3.90% 2.51%

(1) Grab samples from in-situ vein material or subcrop

(2) Samples from dump/hand sorted material from Bear Vein

The Maroon property has the potential to host a more extensive precious metal-rich base metal vein

system that could be emplaced along a thrust plane demarked by the contact between the

prominent pebble and cobble conglomerate and the fine grained siliciclastics. The conglomerate

unit forms a prominent ridge that is traceable for at least two kilometres on Gitennes property and

the contact between the conglomerate and the siliciclastics provides a good vector to target further

exploration for the Bear Vein .

Highlights of the Maroon Property:

• Structural corridor containing multiple, sediment-host ed high-grade polymetallic quartz-

sulfide veins ( Au-Ag-Cu-Zn-Pb )

• Exposed veins are greater than one metre wide and have been traced along the surface for

up to 1,800 metres; and remain open to the northeast, southwest and at depth.

• Selected historical diamond drill results*:

o 0.63 metres grading 26.1 g/t gold , 32.6 g/t silver, 2.97% zinc and 1.62% lead;

o 0.30 metres grading 18.9 g/t gold , 117 g/t silver, 3.89% zinc and 6.20% lead;

o 0.43 metres grading 5.9 g/t gold , 56.1 g/t silver, 8.6% zinc and 3.00% lead

• Upside – only eight drill holes to date totaling 789 metres from four set-ups, length from 45 –

192 metres with average length of 98 metres

o Drilling focused only on area of old adits;

o Three of four drill pads only over 150 metre strike le ngth

o Six drill holes encountered vein, two holes not drille d deep enough

• No comprehensive geochemical or geophysical surveys have been completed and property-

wide geological mapping is warranted.

• Claims in good standing until September, 2020

* Readers are cautioned that a "qualified person" ( as defined by National Instrument 43-101) has not y et completed sufficient

work to be able to verify the historical information, and therefore the information should not be relied upon.

Gitennes is planning field work at Marron this summer including detailed mapping and sampling and

geophysics including a magnetometer survey leading to the o utlining of drill targets. The work at

Maroon will be in addition to a planned minimum 3,0 00 metre diamond drill programme at the High

Grade Snowbird Gold Project.

About Gitennes Exploration Inc.

Gitennes is in the business of exploring for and advancin g gold properties. The Company

currently has two high grade gold exploration properti es, Snowbird and Maroon, both in British

Columbia and a 1% Net Smelter Returns royalty on the 18 million ounce Urumalqui Silver

Project in Peru.

For further information on the Company, readers are r eferred to the Company's website at

www.gitennes.com and its Canadian regulatory filings on SEDAR at www.sedar.com .

Gitennes Exploration Inc.

"Ken Booth"

Ken Booth

President

For further information, please contact: Ken Booth

Phone: 604-682-7970 Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Information

This news release includes certain statements that con stitute "forward-looking information" within the meani ng of

applicable Canadian securities laws concerning the business, operations and financial performance and condition of

the Company. All statements in this news release tha t are not purely historical are forward-looking stateme nts and

include any statements regarding beliefs, plans, expectat ions and orientations regarding the future. Often, but not

always, forward-looking statements can be identified by w ords such as "pro forma", "plans", "expects", "may",

"should", "budget", "schedules", estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations

of such words including negative variations thereof and phras es that refer to certain actions, events or results t hat

may, could, would, might or will occur or be taken or achi eved. Such forward-looking statements include, among

others, statements as to the anticipated business plans and timing of future activities of the Company, including the

exercise of the option to acquire the Snowbird Project a nd to conduct exploration activities thereon. Actual re sults

could differ from those projected in any forward-looking s tatements due to numerous factors including risks and

uncertainties relating to exploration and development and actual results of exploration activities; the ability of the

Company to obtain additional financing; delays in obtain ing governmental and regulatory approvals (including the

TSX Venture Exchange), permits or financing; the need to comply with environmental and governmental

regulations; potential defects in title to the Company 's properties; fluctuations in the prices of commoditie s and

precious metals; operating hazards and risks; environment al issues and liabilities; and competition and other ri sks

and uncertainties of the mining industry. Although the Com pany believes that the beliefs, plans, expectations and

intentions contained in this news release are reasona ble, there can be no assurance that those beliefs, p lans,

expectations or intentions will prove to be accurate . Readers should consider all of the information set fo rth herein

and should review the Company’s periodic reports filed f rom time-to-time with Canadian securities regulators.

These reports and the Company's filings are available at www.sedar.com.

Readers are cautioned not to place undue reliance on fo rward-looking statements. The forward-looking statements

contained in this news release are made as of the date of this news release and, except as otherwise required by law,

the Company undertakes no obligation to update the forwa rd-looking statements contained herein, or to update the

reasons why actual results could differ from those projected in these forward-looking statements.