Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

REVX.V ·

Gitennes’ Update on Maroon High Grade Gold Project Exploration

Corporate Updates

Suite 1010 – 789 West Pender Street, B.C. V6C 1H2 Tel: 604-682-7970

email: [email protected] website: www.gitennes.com

Gitennes’ Update on Maroon High Grade Gold Project Exploration

Vancouver, B.C., - September 26, 2018 - Gitennes Exploration Inc. (TSXV – GIT) provides

an update on reconnaissance exploration at its high grade Maroon gold property located 35

km north of Terrace , British Columbia. Initial work consist ed of reconnaissance mapping

and sampling and surveying of historic trenches and adits as well as trail access.

The Maroon Property is strategically located in an active exploration area at the southern

end of the Golden Triangle and is bordered by Goliath Gold’s Lucky Strike Property (Map 1).

Several occurrences of polymetallic quartz -sulfide

veins were observed during the reconnaissance

exploration. The veins occurred at or near the

contact between units of mudstone and

conglomerate with the conglomerate unit forming

a prominent ridge that is traceable for at least two

kilometres. Deformation in the form of intense

shearing was observed within both the mudstone

and conglomerate units.

The Bear Vein, from which production was

historically reported, was observed in several

trenches and two adits. Samples were taken from

the entrance to the lower and upper adits on the

Bear Vein as well as exposures along the

exposed vein to the southeast.

Upper Adit – Bear Vein

Quartz-sulphide veins in the central property area generally occupy bedding plane shears

within the siltstone-sandstone sequence. Near massive to disseminated sulphide minerals

include pyrrhotite, pyrite, galena, sphalerite, chalcopyrite, some tetrahedrite and locally

scheelite (see photo below).

Semi-massive sulphide vein from the Upper Adit on the Bear Vein

The Maroon property has the potential to host a more extensive precious metal-rich base

metal vein system that could be emplaced along a thrust plane demarked by the contact

between the prominent pebble and cobble conglomerate and the fine grained siliciclastics.

Highlights of the Maroon Property:

 Structural corridor containing multiple, sediment -hosted high -grade polymetallic

quartz-sulfide veins (Au-Ag-Cu-Zn-Pb)

 Exposed veins are greater than one metre wide and have been traced along the

surface for up to 1,800 metres; and remain open to the northeast, southwest and

at depth.

 Selected historical diamond drill results*:

o 0.63 metres grading 26.1 g/t gold, 32.6 g/t silver, 2.97% zinc and 1.62% lead;

o 0.30 metres grading 18.9 g/t gold, 117 g/t silver, 3.89% zinc and 6.20% lead;

o 0.43 metres grading 5.9 g/t gold, 56.1 g/t silver, 8.6% zinc and 3.00% lead

 Upside – only eight drill holes to date totaling 789 metres from four set -ups, length

from 45 – 192 metres with average length of 98 metres

o Drilling focused only on area of old adits;

o Three of four drill pads only over 150 metre strike length

o Six drill holes encountered vein, two holes not drilled deep enough

 No comprehensive geochemical or geophysical surveys have been completed and

property-wide geological mapping is warranted.

 Claims in good standing until September, 2020

* Readers are cautioned that a "qualified person" (as defined by National Instrument 43 -101) has not yet completed sufficient

work to be able to verify the historical information, and therefore the information should not be relied upon.

Qualified Person

The scientific and technical information contained in this news release has been reviewed and

approved by J. Rensby (P.Geo.), technical advisor to the Company, who is a "qualified person"

within the meaning of National Instrument 43-101.

About Gitennes Exploration Inc.

Gitennes is in the business of exploring for and advancing gold properties . The Company

currently has two high grade gold exploration properties, Snowbird and Maroon, both in British

Columbia and a 1% Net Smelter Returns royalty on the 18 million ounce Urumalqui Silver

Project in Peru.

For further information on the Company, readers are referred to the Company's website at

www.gitennes.com and its Canadian regulatory filings on SEDAR at www.sedar.com.

Gitennes Exploration Inc.

"Ken Booth"

Ken Booth

President

For further information, please contact: Ken Booth

Phone: 604-682-7970 Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Map 1

Cautionary Note Regarding Forward-Looking Information

This news release includes certain statements that constitute "forward -looking information" within the meaning of

applicable Canadian securities laws concerning the business, operations and financial performance and condition of

the Company. All statements in this news release that are not purely historical are forward -looking statements and

include any statements regarding beliefs, plans, expectations and orientations regardin g the future. Often, but not

always, forward -looking statements can be identified by words such as "pro forma", "plans", "expects", "may",

"should", "budget", "schedules", estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variat ions

of such words including negative variations thereof and phrases that refer to certain actions, events or results that

may, could, would, might or will occur or be taken or achieved. Such forward -looking statements include, among

others, statements as to the anticipated business plans and timing of future activities of the Company, including the

exercise of the option to acquire the Snowbird Project and to conduct exploration activities thereon. Actual results

could differ from those projected in any fo rward-looking statements due to numerous factors including risks and

uncertainties relating to exploration and development and actual results of exploration activities; the ability of the

Company to obtain additional financing; delays in obtaining governme ntal and regulatory approvals (including the

TSX Venture Exchange), permits or financing; the need to comply with environmental and governmental

regulations; potential defects in title to the Company's properties; fluctuations in the prices of commodities and

precious metals; operating hazards and risks; environmental issues and liabilities; and competition and other risks

and uncertainties of the mining industry. Although the Company believes that the beliefs, plans, expectations and

intentions contained i n this news release are reasonable, there can be no assurance that those beliefs, plans,

expectations or intentions will prove to be accurate. Readers should consider all of the information set forth herein

and should review the Company’s periodic reports filed from time -to-time with Canadian securities regulators.

These reports and the Company's filings are available at www.sedar.com.

Readers are cautioned not to place undue reliance on forward -looking statements. The forward -looking statements

contained in this news release are made as of the date of this news release and, except as otherwise required by law,

the Company undertakes no obligation to update the forward -looking statements contained herein, or to update the

reasons why actual results could differ from those projected in these forward-looking statements.