Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

REE.V ·

E-Tech Resources Inc. Reports Diamond Drill Intercepts of REE Bearing Dykes Beyond the Current Resource at Its Eureka Project in Namibia

Drill Results

E-Tech Resources Inc. Reports Diamond Drill

Intercepts of REE Bearing Dykes Beyond the

Current Resource at Its Eureka Project in

Namibia

Halifax, Nova Scotia--(Newsfile Corp. - February 10, 2022) - E-Tech Resources Inc. (TSXV: REE) (FSE:

K2i) ("E-Tech" or the "Company") is pleased to announce additional assay results from the first diamond

drilling campaign completed

at the Eureka REE Project ("Eureka" or the "Project"),

located in central

Namibia. Significant intersections include 9.4m @ 1.3% Total Rare Earth Oxide ("TREO") (ED008),

4.8m @ 1.2% TREO (ED009), 1m @ 13.4% TREO (ED017), 3.5m @ 4% TREO (ED011), 4.2m @1.2%

TREO (ED017) and 1.9m @ 1.8% TREO (ED019). The results from these eight holes, all of which have

intersected mineralisation, have confirmed the presence of mineralisation in Zones 1 and 2 at depth and

its southward extension along strike. The deposit remains open both along strike and at depth. The

Corporation is awaiting receipt of additional results from the 5 remaining holes of this first diamond

drilling campaign completed in September 2021. Previous diamond drilling results were reported in the

press release dated 10 November 2021.

Elbert Loois, CEO of E-Tech Resources Inc., commented:

"The assay results received to date reveal further extension of the mineralization both to depth and

along strike. Further monazite bearing carbonatitic dykes have been intersected, which suggests

connectivity of Zones 1 and 2. We are excited about the perspective of further expanding the extent of

the known mineralisation during our ongoing second campaign of diamond drilling. After receipt of the

remaining drill hole assays our next step will include the development of a resource block model as a

basis for updating the current Mineral Resource Estimate."

The newly received assay results are part of the resource expansion program across Zones 1, 2 and 3,

which was completed in late September 2021 totaling 5,761 meters of diamond drilling (DD) in 20 holes.

Figure 1

indicates the drill collar positions and the assays received to date. These assay results include

the newly received batch of 541 samples out of a total of 1288 samples, representing holes ED008,

ED009, ED010, ED011, ED012, ED016, ED017 and ED019.

The positions of the DD and RC holes from the previous drilling as well as the ongoing campaign is

displayed in

Figure 1

. In this figure, the white lined box indicates the area of projected holes used for

expanded cross-section (A-B), as shown in detail in

Figures 2 and 3

.

FIGURE 1: Plan view showing drill hole collars and traces at Eureka, Namibia and assays

received status to date. Blue diamonds are assays received, including the 8 newly received

holes ED008, ED009, ED010, ED011, ED012, ED016, ED017 and ED019. Red lines represent

traces of the DD holes of these new assay results. Red dots are RC holes drilled in 2017. The

white lined box indicates the area of holes used for projection into cross-section (A-B), as is

shown in detail in Figure 2.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/6102/113314_8f132964a4d21bab_001full.jpg

FIGURE 2: The white lined box shows the zoomed-in area of holes used for projection into

cross-section (A-B), as presented in Figure 3. The purple outline represents the current 2021

Mineral Resource Estimate (MRE). Blue diamonds are DD assays received. Red lines represent

DD hole traces related to new assay results. Hollow white dots and diamonds are assays

pending. Red dots are RC holes drilled in 2017.

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/6102/113314_8f132964a4d21bab_002full.jpg

The assay results from Holes ED0008 and ED009 support continuity of REE mineralisation to depth with

vertical depths of intersection recorded until 255m (Zone 2) and 194m (Zone 1), compared to the

maximum depth of 60m for the MRE as prepared by SRK Consulting (UK) ("SRK") with an effective date

of 2 August 2021. Assay results from Holes ED011, ED016, ED017, ED019, suggest that the

carbonatite dykes appear to be stacked.

The schematic cross-section (A-B) in Zone 1 shows highlights from received assay results in

comparison to the current MRE, as is shown in

Figure 3

. The area of projected holes that was used to

depict this cross-section is shown inside the white lined box as detailed in

Figure 2

, including DD holes

ED001, ED002, ED004, ED009 and RC holes ER002, ER020, EU001, EU003, EU004

.

FIGURE 3: Schematic cross-section through Zone 1, including the projection of all relevant DD

and RC assay results. The new assay results of drill hole ED009 are marked in yellow. EU001,

EU003 and EU004 are the historical RC holes used for MRE definition, as drilled in 2017.

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/6102/113314_figure3.jpg

A summary of the assay results received from the eight (8) diamond drill holes is provided in

Table 1

.

TABLE 1: Significant intercepts from the new analytical results of the 2021 diamond drilling

(DD) campaign. Reported intercepts are drilled lengths while the true thickness of the

mineralization is estimated to range between 60 and 80 per cent of the drilled lengths. Further

drilling is necessary to establish the true thickness of the dykes.

Hole

From

To

Interval m

TREO %

Coordinates

Zone

ED008

69.2

70.3

1.1

3.5

526341

7562679

Zone 2

ED008

81

82.1

1.1

0.7

Zone 2

ED008

96.4

97.2

0.8

0.5

Zone 2

ED008

100.2

100.6

0.4

3.9

Zone 2

ED008

106.5

107.7

1.2

2.7

Zone 2

ED008

109.7

110.3

0.6

6.7

Zone 2

ED008

126.5

127

0.5

3.1

Zone 2

ED008

154

154.4

0.4

0.5

Zone 2

ED008

231.4

231.6

0.2

8.1

Zone 2

ED008

249.3

250

0.7

3.8

Zone 2

ED008

255.7

257.7

2

2.4

Zone 2

ED008

260.3

260.5

0.2

0.9

Zone 2

ED008

270.3

272.4

2.1

0.4

Zone 2

ED008

273.3

273.7

0.4

0.5

Zone 2

ED008

278.6

280.4

1.8

1.1

Zone 2

ED008

287.1

290.1

3

1.8

Zone 2

incl.

288

289

1

4.2

Zone 2

ED008

303.3

312.7

9.4

1.3

Zone 2

incl.

305.2

306.9

1.7

4.6

Zone 2

ED008

314.8

315

0.2

3.2

Zone 2

ED008

334.1

335.7

1.6

0.4

Zone 2

ED008

340.2

341.7

1.5

0.7

Zone 2

ED008

348.4

348.9

0.5

0.4

Zone 2

ED009

65.4

66.3

0.9

1

526529

7562615

Zone 1

ED009

85.5

86

0.5

0.5

Zone 1

ED009

247.3

247.6

0.3

9.1

Zone 1

ED009

253.2

258

4.8

1.2

Zone 1

incl.

257.2

258

0.8

5.4

Zone 1

ED009

263.7

264.2

0.5

0.5

Zone 1

ED010

140

141.3

1.3

1.5

526371

7562312

Zone 3

ED010

157.5

159.5

2

1.2

Zone 3

incl.

158.6

159.5

0.9

2.5

Zone 3

ED010

176.4

177.2

0.8

0.3

Zone 3

ED010

191.8

192.4

0.6

0.5

Zone 3

ED011

180.8

181.4

0.6

1

526124

7562677

Zone 2

ED011

199

200

1

0.3

Zone 2

ED011

210

210.8

0.8

1.3

Zone 2

ED011

223.3

225.3

2

0.7

Zone 2

ED011

229.3

232.6

3.3

0.4

Zone 2

ED011

240.3

241.3

1

0.3

Zone 2

ED011

259

260

1

0.5

Zone 2

ED011

274.6

278.1

3.5

4

Zone 2

ED011

296.5

297.5

1

1.6

Zone 2

ED011

310.9

312.2

1.3

0.4

Zone 2

ED011

336.6

336.9

0.3

1.5

Zone 2

ED012

81

81.7

0.7

1.7

526272

7562072

Zone 3

ED016

12.5

17.1

4.6

0.4

526227

7562361

Zone 3

Incl.

16.1

17.1

1

0.9

Zone 3

ED016

42.4

46.5

4.1

1.7

Zone 3

Incl.

42.4

45

2.6

2.4

Zone 3

ED016

84.4

90.2

5.8

0.7

Zone 3

Incl.

84.4

86.2

1.8

0.9

Zone 3

ED016

137.1

139.2

2.1

0.4

Zone 3

ED016

152

153

1

2.9

Zone 3

ED016

154.5

156.5

2

2.8

Zone 3

ED016

172.6

173.2

0.6

1.1

Zone 3

ED016

202.8

204

1.2

0.5

Zone 3

ED016

214.8

216

1.2

0.7

Zone 3

ED016

229.7

231.2

1.5

1.1

Zone 3

ED016

236.4

237.4

1

1.2

Zone 3

ED016

239.6

240.7

1.1

0.6

Zone 3

ED017

19.8

20.8

1

13.4

526306

7562562

Zone1/3

ED017

22.5

23.2

0.7

1.7

Zone1/3

ED017

92.6

93.8

1.2

0.7

Zone1/3

ED017

98

99.7

1.7

1.5

Zone1/3

ED017

100.6

102.8

2.2

1.4

Zone1/3

ED017

104.7

107.3

2.6

0.4

Zone1/3

ED017

207.8

210.7

2.9

0.8

Zone1/3

ED017

223.1

233.9

10.8

0.2

Zone1/3

ED017

235.7

237.2

1.5

0.4

Zone1/3

ED017

248.2

248.8

0.6

0.7

Zone1/3

ED017

256.3

261.6

5.3

0.2

Zone1/3

ED017

276.5

278.1

1.6

1.5

Zone1/3

Incl.

276.5

277

0.5

4.5

Zone1/3

ED019

58.9

61.5

2.6

0.3

526249

7562544

Zone1/3

ED019

127.1

127.5

0.4

0.3

Zone1/3

ED019

129.1

129.7

0.6

0.3

Zone1/3

ED019

139.5

140.4

0.9

0.5

Zone1/3

ED019

174.7

175.8

1.1

0.7

Zone1/3

Incl.

175.2

175.8

0.6

1.2

Zone1/3

ED019

180.9

182.8

1.9

1.8

Zone1/3

Incl.

181.7

182.8

1.1

2.8

Zone1/3

ED019

186.5

187.6

1.1

0.6

Zone1/3

Incl.

186.5

187

0.5

1.2

Zone1/3

ED019

199.1

204.6

5.5

0.6

Zone1/3

Incl.

200.6

202.4

1.8

1.0

Zone1/3

ED019

205.8

209.8

4

0.4

Zone1/3

ED019

214.4

214.9

0.5

1.6

Zone1/3

ED019

222.8

225.5

2.7

0.2

Zone1/3

ED019

230.3

231.8

1.5

0.5

Zone1/3

ED019

249.9

250.3

0.4

0.7

Zone1/3

ED019

261.6

262.1

0.5

0.5

Zone1/3

ED019

265.3

265.7

0.3

0.3

Zone1/3

Eureka Technical Disclosure

The Corporation produced its current Mineral Resource Estimate ("MRE") for the Eureka Project with an

effective date of 2 August 2021. The MRE was prepared by SRK Consulting (UK) ("SRK"). An

Independent Technical Report titled: "Independent Technical Report: Eureka, Rare Earth Project,

Namibia" was originally released on the 15 September 2021, supporting the disclosure of the MRE, and

is available on SEDAR and the Corporation's website.

Quality Assurance / Quality Control

All E-Tech sample assay results have been independently monitored through a quality assurance /

quality control ("QA/QC") program including the insertion of certified reference standards, blanks and

duplicate samples. QA/QC samples make up 10% of all samples submitted. Drill core is sawn in half on

site and half drill-core samples are securely transported to Activation Laboratories Ltd. sample

preparation facility in Windhoek, Namibia. The core is dried, crushed to 90% passing 2 mm, riffle

splitting a 250 g sub-sample and pulverizing to 95% passing 105 µm. Sample pulps are sent to

Activation Laboratories Ltd. in Ontario, Canada for analysis. REE analysis is by method 8-REE. The

sample is milled to 95% -200 mesh. To ensure complete fusion of resistate minerals, lithium

metaborate/tetraborate fusion is used with analysis by ICP-OES and ICP-MS.

Qualified Person

Pete Siegfried, BSc. (Hons), M.Sc., is a Consulting Geologist and a director of GeoAfrica Prospecting

Services cc and has reviewed and approved the scientific and technical information in this news release.

Mr. Siegfried is a member of The Australasian Institute of Mining and Metallurgy (AusIMM) membership

number: 221116 (CP Geology), and a Qualified Person for the purposes of National Instrument 43-101.

Mr. Siegfried consents to the inclusion of this information for the announcement.

About E-Tech Resources Inc.

E-Tech Resources Inc. (TSXV: REE) (FSE: K2i) is a rare earth exploration and development company

focused on developing its Eureka Rare Earths Project in Namibia. The Eureka Project is located

approximately 250 km north-west of Namibia's capital city Windhoek and 140km east of Namibia's main

industrial port Walvis Bay. The project is situated next to the national B1 highway in the Erongo Region of

Namibia. The Eureka deposit lies in the Southern Central Zone of the Neoproterozoic Damara Belt

within Exclusive Prospecting License ("EPL") number EPL 6762, which covers farms Eureka 99 and

Sukses 90. Namibia is recognized as one of Africa's most politically stable jurisdictions, with an

extremely well-established national infrastructure and a clear and transparent mining law. The

Corporation continues to assess new project opportunities and expand its Southern African portfolio.

Further details are available on the Corporation's website at

www.etech-resources.com

or contact

Elbert Loois, CEO of E-Tech Resources Inc., at +1 (902) 334 1949.

Cautionary Statements

This press release may contain forward-looking information, such as statements regarding the

completion of the work in Namibia by E-Tech Resources and future plans and objectives of E-Tech

Resources. This information is based on current expectations and assumptions (including assumptions

in connection with the continuance of the applicable company as a going concern and general economic

and market conditions) that are subject to significant risks and uncertainties that are difficult to predict,

including risks relating to the ability to satisfy the conditions to completion of exploration programs and

work in Namibia. Actual results may differ materially from results suggested in any forward-looking

information. E-Tech Resources assumes no obligation to update forward-looking information in this

release, or to update the reasons why actual results could differ from those reflected in the forward-

looking information unless and until required by applicable securities laws. Additional information

identifying risks and uncertainties is contained in filings made by E-Tech Resources with Canadian

securities regulators, copies of which are available at

www.sedar.com

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/113314