Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RDU.V ·

Radius Gold re-discovers historic silver mining camp in Chihuahua, Mexico

Mergers & Acquisitions Exploration Programs

news release

March 23, 2020

Radius Gold re-discovers historic silver mining camp in Chihuahua, Mexico

Vancouver, Canada: Radius Gold Inc. (TSX -V: RDU) is pleased to announce that the Company has

entered into an option agreement with a local concession holder to acquire a 100% interest in a 300 hectare

property covering an historic silver mining camp located in Chihuahua, Mexico.

Plata Verde

At the new project, named Plata Verde, Radius geologists have re-discovered an undocumented large scale

underground bulk mining operation where in the late 1800’s, historic miners hand excavated an extensive

series of anastomosing caverns , producing silver bars at a n associated smelter operation. The project

appears to be un -explored since the miners ceased their operations, and no references have been found

within the Mexican Geological Survey . The few local residents have no knowledge of exploration

companies working in the area and there are no indications of prior exploration within the mines or

surrounding outcrops. Initial prospecting rock chips by Radius geologists have returned silver grades

between 5 and 1070 g/t Ag.

Location

The Plata Verde project is located in Chihuahua, Mexico , north of Radius Gold’s Amalia Gold -Silver

project and east of the historic Batopilas silver mining district (1708 to 1920) which reputedly produced

over 300 million ounces of silver from high grade veins and structures. The property is accessible by road,

with a 4 hour hike required to access the historic mines.

Geology and Mineralization

At Plata Verde, silver mineralization occurs as massive to crustiform banded barite calcite with silver

chlorides, sulphosalt minerals and native silver infilling and cementing fractures and breccia within a

basaltic/andesite extrusive volcanic. The basaltic/andesite host occurs at the base of the Upper Rhyolitic

Volcanics of the Northern Sierra Madre. In general the host volcanics and associated silver mineralization

is covered by the overlying rhyolitic ignimbrites and is only exposed along the length of a small creek.

On the eastern side of the creek a number of small entrances, hardly visible, lead to an extensive network

of anastomosing mining tunnels and cavities. The mining and excavation was done by hand with hammer,

chisel and black powder explosives, leaving behind large underground cavities up to 50m x 50m x 30m

high. Throughout the mines roman numerals painted on the walls record up to 58 mining areas. The mining

excavations define a strike extension of over 500m and up to 100m wide. The host volcanic unit is at least

-2-

60m thick. The southern extension is abruptly cut by a fault which forms a large cliff face. To the north,

east and west the host volcanic flows and silver mineralization is covered by the ignimbrites, but remains

open to unknown extent in these directions . On the opposite western side of the creek exposu res of the

mineralized unit host good silver grades.

Sampling results

Radius geologists have collected 110 prospecting rock chip samples with silver grades ranging between 5

and 1070 g/t Ag. Within the largest mining area, which has been named Mina Mojonera , 35 rock chip

samples were collected from the walls and remaining pillars (2 x 2m panel samples or 2m chip channel

samples) at stations approximately 10 to 20m apart covering the irregularly shaped +5000m2 mining area.

These samples ranged from 5 to 849 g/t Ag and averaged 276 g/t Ag (figure 1 and 2). The silver

mineralization contains no gold, low Sb and As and trace amounts of Pb, Zn and Cu.

Figure 1. Mina Mojonera rock chip sampling with silver assays in g/t Ag.

-3-

Figure 2. Mina Mojonera.

-4-

Figure 3. Plata Verde typical mineralization textures, crustiform banded barite calcite with silver

chlorides, sulphosalt minerals and native silver infilling and cementing fractures and breccia. Note

green silver chloride oxides after which the project was named. Sample from Mina Mojonera SAP015

358 g/t Ag.

Exploration Targets

The priority for Radius is to define the outcropping extents of the mineralization and to map and sample in

detail all the known mineralized areas and mines. Most of the extensions are covered by rhyolitic ignimbrite

volcanics so outcrop is limited . As the host basaltic/andesites are magnetic, and cover rhyolites are not,

Radius plans to fly an airborne magnetic survey to help define the extensions of the host rocks under cover.

The barite/silver chloride mineralization appears to be a late stage low temperature mineralizing event with

the source and feeder systems as yet unknown and an attractive exploration target. Barite and silver chloride

are often part of the upper levels or supergene zone around larg e silver deposits. The solubility of barite

and silver chlorides is low, and hence the source zone is likely to be close by or directly below.

At the Plata Verde project Radius has rapidly secured the property rights, completed formal access

agreements with the local landowners and constructed a camp and communications. Detailed geological

mapping and prospecting has commenced. Radius looks forward to expanding its knowledge of this

exciting new discovery and developing drill targets.

Due to C OVID-19 and associated travel restrictions , the project will not advance as quickly as normal.

Radius has a Mexican geological team in Chihuahua and in the coming weeks our teams will decide how

best to advance, based on the situation in Chihuahua and our team’s personal and family safety.

The Agreement

Radius can earn a 100% interest in the project by making staged payments totalling US$800,000 over four

years with the final payment equal to $400,000 at the end of year four. An $8,000 signing payment has

already been paid. The owner retains a 1% NSR which Radius can buy back for US$1,000,000.

-5-

Technical Information

Bruce Smith, M.Sc. (Geology), a member of the Australian Institute of Geoscientists, is Radius’s Qualified

Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Smith

has worked in the field at Plata Verde, and prepared and approved the technical information contained in

this news release.

Quality Assurance and Quality Control

Reported assays are rock chip and channels samples taken by Radius geologists and trained sampling teams.

Sample intervals are generally 2m chip channels or 2x2m panels producing samples of between 2 to 9 kg.

Samples are delivered to the ALS Geochemistry laboratory facilities in Chihuahua, Mexico. The samples

are fire assayed for Au and are analysed for Ag and multi-elements using method code ME-ICP61 following

a four-acid digestion. Overlimits are analysed using an appropriate method. Radius routinely inserts multi-

element geochemical standards and blanks into the sample stream to mo nitor laboratory performance.

Quality control samples submitted to ALS were returned within acceptable limits.

Radius Gold Inc.

Radius has a portfolio of projects located in Mexico, United States and Guatemala which it continues to

advance, utilizing partnerships where appropriate in order to retain the Company’s strong treasury. At the

same time, management is seeking out additional investment and project acquisition opportunities across

the globe.

ON BEHALF OF THE BOARD

Simon Ridgway

President and CEO

Symbol: TSXV-RDU

Contact: Simon Ridgway

200 Burrard Street, Suite 650

Vancouver, BC V6C 3L6

Tel: 604-801-5432; Toll free 1-888-627-9378; Fax: 604-662-8829

Email: [email protected]

Website: www.radiusgold.com

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts

responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

Certain statements contained in this news release constitute forward -looking statements within the meaning of

Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-

looking statements which include, without limitation ; the exploration plans for the Plata Verde Project; the

Company’s business strategy, plans and outlook; the merit of the Company’s investments and properties; timelines;

the future financial performance of the Company; expenditures; approvals and other matters. Often, but not always,

-6-

these forward looking statements can be identified by the use of words such as “estimate”, “estimates”, “estimated”,

“potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “upgraded”,

“offset”, “limited”, “contained”, “reflecting”, “containin g”, “remaining”, “to be”, “periodically”, or statements

that events, “could” or “should” occur or be achieved and similar expressions, including negative variations.

Forward-looking statements involve known and unknown risks, uncertainties and other fact ors which may cause the

actual results, performance or achievements of the Company to be materially different from any results, performance

or achievements expressed or implied by forward-looking statements. Such uncertainties and factors include, among

others, the plans for exploring the Plata Verde Project; changes in general economic conditions and financial

markets; the Company or any joint venture partner not having the financial ability to meet its exploration and

development goals; risks associated with the results of exploration and development activities, estimation of mineral

resources and the geology, grade and continuity of mineral deposits; unanticipated costs and expenses; and such

other risks detailed from time to time in the Company’s quar terly and annual filings with securities regulators and

available under the Company’s profile on SEDAR at www.sedar.com. Although the Company has attempted to identify

important factors that could cause actual actions, events or results to differ material ly from those described in

forward-looking statements, there may be other factors that cause actions, events or results to differ from those

anticipated, estimated or intended.

Forward-looking statements contained herein are based on the assumptions, beli efs, expectations and opinions of

management, including but not limited to : that the exploration activities at the Plata Verde Project will proceed as

planned; that the Company’s activities will be in accordance with its public statements and stated goals; that all

required approvals will be obtained; that there will be no material adverse change affecting the Company or its

investments or properties; and such other assumptions as set out herein. Forward-looking statements are made as of

the date hereof and the Company disclaims any obligation to update any forward -looking statements, whether as a

result of new information, future events or results or otherwise, except as required by law. There can be no assurance

that forward-looking statements will prove to be accurate, as actual results and future events could differ materially

from those anticipated in such statements. Accordingly, investors should not place undue reliance on forward-looking

statements.