Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RDU.V ·

Radius drills 1.53m @ 191.8 g/t Au and 539 g/t Ag at Holly Project, Guatemala

Drill Results

news release

October 5, 2021

Radius drills 1.53m @ 191.8 g/t Au and 539 g/t Ag at Holly Project,

Guatemala

Vancouver, British Columbia – Radius Gold Inc. (TSXV: RDU) is pleased to report final results from Holly

drill holes HDD-21-017 through HDD-21-020 following receipt of the overlimit assays, and that the drill is

again turning at Holly. Drilling at Radius’s nearby Banderas project will start during the month of October.

The drill program is being conducted by joint venture partner Volcanic Gold Mines Inc, who can earn into

60% of the project by funding $7 million in exploration.

Holly Highlights:

HDD-21-017 from 134.25m to 143.08m returns 8.83m @ 8.81 g/t Au and 355 g/t Ag

HDD-21-019 from 28.97m to 30.50m returns 1.53m @ 191.8 g/t Au and 539 g/t Ag

And 171.90m to 178.42m returns 6.52m @ 11.72 g/t Au and 340 g/t Ag

HDD-21-020 from 61.70m to 67.10m returns 5.40m @ 4.38 g/t Au, 350 g/t Ag

Including 63.0m to 64.0m returns 1.00m @ 20.70 g/t Au and 1,616 g/t Ag

And 131.0m to 134.20m returns 3.20m @ 255 g/t Ag

Results from Holly continue to return high grade broad intercepts accompanied by high associated values

in path finder elements such as Mercury and Antimony. It is management’s belief that we are still high in

the epithermal system and the next round of drilling continues to step down the Jocotan Fault Breccia

testing this broader system at depth.

Within the Peña vein hanging wall, splay veins are producing spectacular results as shown by the bonanza

interval in HDD-21-019 returning 1.53m @ 191.8 g/t Au and 539 g/t Ag from 28.97m down hole. La Peña

is one of many north -south veins that cross the regional east -west Jocotan plate bounding fault system.

With growing understand ing of the controls on mineralization at Holly, the program is consistently

intersecting the north -south Peña vein system within the wide Jocotan fault breccia, where gold -silver

grades are the highest. A major focus of the upcoming drilling will be to test the extensive breccia in the

plate bounding Jocotan fault.

-2-

Results are still pending from latest step out holes to the north and south. The initial step out hole to the

north, HDD21-015, returned 15.55m @ 7.67 g/t Au and 615 g/t Ag, and HDD21-017 to the south of the

Jocotan breccia (above) returned 8.83m @ 8.81 g/t Au and 355 Ag.

Figure 1. La Peña Zone; Long Section:

Note: Reported intervals are drilled width. True width is estimated at 80% of true width.

Technical Information

Bruce Smith, M.Sc. (Geology), a member of the Australian Institute of Geoscientists, is Radius Gold ’s

Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Mr. Smith has 27 years of mineral exploration experience and has prepared and approved the technical

information contained in this news release.

Quality Assurance and Quality Control

Volcanic Gold follows industry standard procedures for diamond core drilling and analysis. Drilling is

carried out using NQ and HQ size tooling. Drill core is cut in half using a rock saw with one-half of the core

then taken as a sample for analysis. Sample intervals are generally 1m intervals, producing samples of

between 2 to 9 kg. Half-core samples are delivered to the internationally certified Bureau Veritas Mineral

laboratory facilities in Nicaragua where the samples are prepared. Assays are completed by Bureau Veritas

certified laboratories. The samples are fire assayed for Au and are analy zed for Ag and multi -elements

-3-

using method code ICP following a four -acid digestion. Overlimits are analy zed using an appropriate

method. Multi-element geochemical standards and blanks are routinely entered into the drill core sample

stream to monitor laboratory performance. Quality control samples subm itted were returned within

acceptable limits.

Terms of Guatemala Radius Gold and Volcanic Gold Mines option

Pursuant to an option agreement signed in May 2020 with Radius, Volcanic can earn a 60% interest in

Radius’s Holly and Banderas projects by spending the cumulative amount of US$7.0 million on exploration

of the properties within 48 months from the date of the agreement. An initial US$1M must be spent on

exploration within the 12 months of receiving the required drill permits, which expenditure will include a

minimum 3,000m of drilling on the properties.

Following the exercise of the Option, Volcanic will enter into a standard 60/40 Joint Venture in order to

further develop the Properties. Volcanic has also been granted an exclusive right to evaluate all other

property interests of Radius in Guatemala with a right to acquire an interest in any or all other such

properties on reasonable terms.

Radius Gold Inc.

Radius has a portfolio of projects located in Mexico, U nited States and Guatemala which it advance s

utilizing partnerships where appropriate in order to retain the Company’s strong treasury. At the same

time, management is seeking out additional investment and project acquisition opportunities across the

globe.

ON BEHALF OF THE BOARD

Bruce Smith

President and CEO

Symbol: TSXV-RDU

Contact: Bruce Smith

200 Burrard Street, Suite 650

Vancouver, BC V6C 3L6

Tel: 604-801-5432; Toll free 1-888-627-9378; Fax: 604-662-8829

Email: [email protected]

Website: www.radiusgold.com

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts

responsibility for the adequacy or accuracy of this release.

Forward-looking statements

Certain statements contained in this news release constitute forward -looking statements within the meaning of

Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-

looking statements and include, wi thout limitation, statements about the plans for exploration work at the

Company’s Guatemala projects. Often, but not always, these forward looking statements can be identified by the use

of words such as “estimate”, “estimates”, “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”,

-4-

“detailed”, “has been”, “gain”, “upgraded”, “offset”, “limited”, “contained”, “reflecting”, “containing”, “remaining”,

“to be”, “periodically”, or statements that events, “could” or “should” occur or be ach ieved and similar expressions,

including negative variations.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the

actual results, performance or achievements of the Company to be materially different from any results, performance

or achievements expressed or implied by forward-looking statements. Such uncertainties and factors include, among

others, whether the planned exploration work in Guatemala will proceed as intended; changes in general economic

conditions and financial markets; the Company or any joint venture partner not having the financial ability to meet

its exploration and development goals; risks associated with the results of exploration and development activities,

estimation of mineral resources and the geology, grade and continuity of mineral deposits; unanticipated costs and

expenses; and such other risks detailed from time to time in the Company’s quarterly and annual filings with securities

regulators and available under the Company’s profile on SEDAR at www.sedar.com. Although the Company has

attempted to identify important factors that could cause actual actions, events or results to differ materially from

those described in forward -looking statements, there may be other factors that cause actions, events or results t o

differ from those anticipated, estimated or intended.

Forward-looking statements contained herein are based on the assumptions, beliefs, expectations and opinions of

management, including but not limited to: that the Company’s stated goals and the planned exploration and

development activities at its properties will be achieved; that there will be no material adverse change affecting the

Company or its properties; and such other assumptions as set out herein. Forward -looking statements are made as

of the date hereof and the Company disclaims any obligation to update any forward-looking statements, whether as

a result of new information, future events or results or otherwise, except as required by law. There can be no

assurance that forward -looking statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on

forward-looking statements.