Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RDS.V ·

Radisson Continues to Expand Scope of Gold Mineralization at O'Brien with Latest Drill Results

Drill Results

Radisson Continues to Expand Scope of Gold

Mineralization at O'Brien with Latest Drill

Results

Rouyn-Noranda, Quebec--(Newsfile Corp. - September 8, 2025) -

Radisson Mining Resources Inc.

(TSXV: RDS) (OTCQB: RMRDF)

("

Radisson

" or the "

Company

") is pleased to announce assay

results from fifteen new drill holes completed at its 100%-owned O'Brien Gold Project ("

O'Brien

" or the

"

Project

") located in the Abitibi region of Québec. The fifteen holes represent step-outs below the

existing geological model, east of the historic O'Brien Gold Mine (Figure 1) and are outside the scope of

the recently completed Preliminary Economic Assessment ("

PEA

", see

Radisson news release dated

July 9, 2025

). All holes intersected gold mineralization in characteristic quartz-sulphide-gold veins, and

thirteen of the holes returned intercepts with grades and thicknesses consistent with the Project's

existing mineral resources. These results continue to expand the scope of the Project's known gold

mineralization. Highlights include:

OB-24-363

intersected 8.41 grams per tonne ("g/t") gold ("Au") over 2.2 metres, including 14.40

g/t Au over 1.2 metres

and

9.07 g/t Au over 1.8 metres, including 12.10 g/t Au over 0.9 metres;

OB-24-354

intersected 7.95 g/t Au over 2.30 metres, including 14.85 g/t Au over 1.0 metre;

OB-24-364

intersected 12.75 g/t Au over 1.4 metres and 11.15 g/t Au over 1.50 metres;

OB-24-361

intersected 3.50 g/t Au over 5.0 metres, including 8.96 g/t Au over 1.28 metres,

and

15.10 g/t Au over 1.0 metre; and

OB-25-371W1

intersected 5.66 g/t Au over 3.0 metres, including 9.97 g/t Au over 1.5 metres.

Matt Manson, President & CEO, commented:

"Our ongoing drilling at the O'Brien Project is focussed

on "proof-of-concept" step-outs designed to test the full scope of the Project beyond previous drilling.

We recently released the latest results from drilling beneath the historic O'Brien gold mine where we

have been delineating multiple high-grade gold-bearing veins over a large area up to 500 metres

below the base of the historic workings. Today's news release shows results from drill holes located to

the east of the historic mine, and below the existing mineral resources. Of note, several of the holes

represent deep step-outs below our "Trend #2", pushing the scope of known mineralization downwards

by up to 300 metres in this important area. Our Exploration Target at O'Brien is between 3 and 4

million ounces of gold in 15 to 20 million tonnes at between 4.5 and 8.0 g/t Au. This is based on the

proposition that O'Brien's mesothermal gold mineralization continues to an exploration horizon of 2

kilometres depth. Today's results continue to support this thesis. With the recent completion of our

high-value, but "snap-shot", PEA, our focus is on aggressive exploration and resource growth. Four

rigs are currently active at the Project and drilling continues."

The reader is cautioned that the potential quantity and grade of an Exploration Target is conceptual in

nature, there has been insufficient exploration to define a mineral resource and that it is uncertain if

further exploration will result in the target being delineated as a mineral resource.

Figure 1

: Long Section and Plan View of Gold Vein Mineralization and Mineral Resources at the

O'Brien Gold Project, with Today's Drill Holes Illustrated

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10977/265432_bb2e887f64ce98f8_001full.jpg

Table 1

: Assay Results from Drill Holes OB-24-352 to OB-25-375

DDH

Zone

From (m)

To (m)

Core Length (m)

Au g/t - Uncut

Host Lithology

OB-24-352

Trend #2

521.0

522.0

1.00

13.10

PON-S3

703.0

704.5

1.50

3.73

S1P

OB-24-353

Trend #1

70.0

71.5

1.50

3.51

PON-S3

160.9

162.0

1.14

3.24

S1P

191.0

194.3

3.30

3.70

TX

Including

192.0

193.0

1.00

6.28

TX

OB-24-354

Trend #0

232.0

234.3

2.3

7.9

S1P

Including

232.0

233.0

1.0

14.9

S1P

302.7

304.0

1.3

6.4

V3-N

OB-24-355

Trend #3

432.4

433.7

1.30

3.91

S1P

466.8

468.9

2.10

3.49

V3-N

OB-24-359W1

Trend #3

429.3

430.8

1.50

3.88

V3-S

495.0

496.0

1.00

11.20

S3P

OB-24-361

Trend #3

195.5

196.5

1.00

4.46

PON-S3

572.4

573.4

1.00

15.10

V3-S

633.0

638.0

5.00

3.50

V3-S

Including

633.0

634.3

1.28

8.96

S1P/POR-N

OB-24-363

Trend #2

194.5

195.9

1.40

6.04

PON-S3

910.0

911.0

1.00

7.65

PON-S3

1,199.7

1,201.9

2.20

8.41

V3-S

Including

1,200.7

1,201.9

1.20

14.40

V3-S

1,231.3

1,233.1

1.80

9.07

POR-S

Including

1,232.2

1,233.1

0.90

12.10

POR-S

OB-25-363W1

Trend #2

1,037.0

1,038.4

1.40

4.16

V3-S

1,056.5

1,058.0

1.50

4.04

V3-S

OB-24-364

Trend #1

388.0

389.4

1.40

12.75

V3-CEN

402.5

404.0

1.50

6.26

S1P

413.2

414.7

1.50

11.15

POR-N

OB-25-366

Trend #2

619.0

620.0

1.00

3.71

PON-S3

OB-25-371

Trend #2

1,402.0

1,404.5

2.50

3.99

POR-S

Including

1,402.0

1,403.0

1.00

5.54

POR-N/V3-N

OB-25-371W1

Trend #2

1,058.5

1,061.5

3.00

5.66

PON-S3

Including

1,058.5

1,060.0

1.50

9.97

PON-S3

1,210.9

1,214.0

3.10

3.21

V3-S

OB-25-375

Trend #3

538.0

539.5

1.50

7.38

S3p

Notes on Calculation of Drill Intercepts:

The O'Brien Gold Project Mineral Resource Estimate effective May 6, 2025 ("MRE") utilizes a 2.20 g/t Au bottom cutoff, a US$2,000 gold price, a

minimum mining width of 1.2 metres, and a 40 g/t Au upper cap on composites. Intercepts presented in Table 1 are calculated with a 3.00 g/t Au bottom

cut-off. True widths, based on depth of intercept and drill hole inclination, are estimated to be 30-80% of core length. Table 2 presents additional drill

intercepts calculated with a 1.00 g/t bottom cut-off over a minimum 1.0 metre core length so as to illustrate the frequency and continuity of mineralized

intervals within which high-grade gold veins at O'Brien are developed. Lithology Codes: PON-S3: Pontiac Sediments; V3-S, V3-N, V3-CEN: Basalt-

South, North, Central; S1P, S3P: Conglomerate; POR-S, POR-N: Porphyry South, North; TX: Crystal Tuff; ZFLLC: Larder Lake-Cadillac Fault Zone.

O'Brien Mineral Resource Estimates

The Mineral Resource Estimate ("

MRE

") utilized in the recent O'Brien PEA comprises Indicated Mineral

Resources of 0.58 million ounces (2.20 million tonnes at 8.2 g/t Au) and Inferred Mineral Resources of

0.93 million ounces (6.67 million tonnes at 4.4 g/t Au)

1

. Mineral Resources that are not Mineral Reserves

do not have demonstrated economic viability. This MRE, effective as of May 6, 2025, is based on the

Project's March 2023 estimate re-blocked with an updated cut-off yielding more ounces and more

tonnes at a lower average grade. As such, it is based on drilling completed only to the end of 2022. By

the end of the current fully funded 50-60,000 drill program, an additional 90-100,000 metres of drilling will

be available for an updated estimate, including a significant meterage of drilling outside the scope of the

current MRE and the recent PEA mine design.

Gold Mineralization at O'Brien

Gold mineralizing quartz-sulphide veins at O'Brien occur within a thin band of interlayered mafic volcanic

rocks, conglomerates, and porphyritic andesitic sills of the Piché Group occurring in contact with the

east-west oriented Larder Lake-Cadillac Break ("LLCB"). Gold, along with pyrite and arsenopyrite, is

typically associated with shearing and a pervasive biotite alteration, and developed within multiple Piché

Group lithologies and, occasionally, the hanging-wall Pontiac and footwall Cadillac meta-sedimentary

rocks.

As mapped at the historic O'Brien mine, and now replicated in the modern drilling, individual veins are

generally narrow, ranging from several centimetres up to several metres in thickness. Multiple veins

occur sub-parallel to each other, as well as sub-parallel to the Piché lithologies and the LLCB. Individual

veins have well-established lateral continuity, with near-vertical, high-grade shoots developed over

significant lengths. Based on the historic data available, it is clear that the former mine was "high-

graded", with mining focussed on a main central stope and parallel veins identified but left undeveloped.

The historic O'Brien mine produced over half a million ounces of gold from such veins and shoots at an

average grade exceeding 15 g/t Au and over a vertical extent of at least 1,000 metres. Modern

exploration has focussed on delineating well developed vein mineralization to the east of the historic

mine, with additional high-grade shoots becoming evident in the exploration data over what has been

described as a series of repeating trends ("Trend #s 0 to 5").

Step-Out Drilling at O'Brien

Since the end of 2024, Radisson has been pursuing a program of broad step-outs beneath the historic

O'Brien Gold mine and the existing mineral resources designed to test the scope of mineralization at the

Project. This drilling is accomplished with pilot holes followed by wedges and directional drilling to

maximize drill efficiency. A particular focus has been the delineation of multiple high-grade veins beneath

the historic mine workings of the O'Brien mine with a series of wedge-extensions drilled from the pilot

hole OB-24-337, which intersected 242.0 g/t Au over 1.0 metre within a mineralized interval that

averaged 31.24 g/t Au over 8.0 metres at approximately 1,500 metres vertical depth. Assay results from

a total of 7 wedges from OB-24-337 have now been reported and up to six gold-bearing veins have

been delineated over an area of approximately 250 metres (east-west) by 250 metres (vertical). These

veins appear to correspond to veins mapped at the base of the historic mine at 1,000 metres deep,

approximately 300 to 500 metres above the new intercepts (see

Radisson news release dated July 16,

2025

). Current drilling in this area is focussed on infilling with pilot holes and wedge extensions both

above and below the OB-24-337 pattern of branches to test the full continuity of mineralisation from the

historic mine down to 2 kilometres depth.

Step-out drilling with wedge extensions has also confirmed high-grade mineralization 170 metres below

the base of the existing mineral resources at Trend #1, including pilot hole OB-24-324 which intersected

27.61 g/t Au over 6.0 metres (see

Radisson news release dated October 30, 2024

).

Today's results include pilot holes and wedges with high-grade mineralization located up to 300 metres

below previous drill intercepts at Trend #2 and showing good continuity with the mineral resource model

above (Figure 2). These drill holes include OB-24-363 which intersected 8.41 g/t Au over 2.20 metres

including 14.40 g/t Au over 1.20 metres and 9.07 g/t Au over 1.80 metres including 12.10 g/t Au over

0.90 metres. Three separate drill-holes were located at or close to the base of the existing mineral

resources at Trend #3, including OB-24-361 which intersected 15.10 g/t Au over 1 metre and 3.50 g/t Au

over 5.0 metres including 8.96 g/t Au over 1.28 metres. These new drill intercepts extend the scope of

known gold mineralization at O'Brien, which remains open to depth along the full 5 kilometre length of the

property.

QA/QC

All drill cores in this campaign are NQ in size. Assays were completed on sawn half-cores, with the

second half kept for future reference. The samples were analyzed using standard fire assay procedures

with Atomic Absorption (AA) finish at ALS Laboratory Ltd, in Val-d'Or, Quebec. Samples yielding a

grade higher than 10 g/t Au were analyzed a second time by fire assay with gravimetric finish at the

same laboratory. Mineralized zones containing visible gold were analyzed with metallic sieve procedure.

Standard reference materials, blank samples and duplicates were inserted prior to shipment for quality

assurance and quality control (QA/QC) program.

Qualified Persons 

Disclosure of a scientific or technical nature in this news release was prepared under the supervision of

Mr. Richard Nieminen, P.Geo, (QC), a geological consultant for Radisson and a Qualified Person for

purposes of NI 43-101. Mr. Luke Evans, M.Sc., P.Eng., ing, of SLR Consulting (Canada) Ltd., is the

Qualified Person responsible for the preparation of the MRE at O'Brien. Each of Mr. Nieminen and Mr.

Evans is independent of Radisson and the O'Brien Gold Project.

About Radisson Mining

Radisson is a gold exploration company focused on its 100% owned O'Brien Gold Project, located in the

Bousquet-Cadillac mining camp along the world-renowned Larder-Lake-Cadillac Break in Abitibi,

Québec. A July 2025 Preliminary Economic Assessment described a low cost and high value project

with an 11-year mine life and significant upside potential based on the use of existing regional

infrastructure. Indicated Mineral Resources are estimated at 0.58 million ounces (2.20 million tonnes at

8.2 g/t Au), with additional Inferred Mineral Resources estimated at 0.93 million ounces (6.67 million

tonnes at 4.4 g/t Au). Please see the NI 43-101 "O'Brien Gold Project Technical Report and Preliminary

Economic Assessment, Québec, Canada" effective June 27, 2025, and other filings made with

Canadian securities regulatory authorities available at www.sedarplus.ca for further details and

assumptions relating to the O'Brien Gold Project.

Figure 2

: Cross Section through "Trend #2" with Drill Holes OB-24-352,363, OB-25-363W1,371 and

371W1

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10977/265432_bb2e887f64ce98f8_002full.jpg

Table 2

: Detailed Assay Results (see "Notes on Calculation of Drill Intercepts")

DDH

Zone

From (m)

To (m)

CorG LGngth (m)

Au g/t - Uncut

Host Lithology

248.0

249.0

1.00

1.17

PON-S3

OB-24-352

Trend #2

521.0

522.0

1.00

13.10

PON-S3

648.0

649.5

1.50

1.46

V3-S

694.7

697.5

2.80

1.79

V3-CEN

703.0

704.5

1.50

3.73

S1P

724.1

725.5

1.40

1.32

POR-S

OB-24-353

Trend #1

26.5

28.0

1.50

2.24

PON-S3

58.7

61.0

2.30

2.05

PON-S3

70.0

71.5

1.50

3.51

PON-S3

134.5

135.9

1.40

1.90

V3-S

153.1

156.0

2.90

1.09

POR-S

160.9

162.0

1.14

3.24

S1P

165.5

166.5

1.00

1.13

S1P

180.9

181.9

1.04

1.98

S1P

184.4

185.7

1.29

1.15

POR-N

191.0

194.3

3.30

3.70

TX

Including

192.0

193.0

1.00

6.28

TX

197.0

198.0

1.00

2.11

V3-N

203.7

204.5

0.82

2.30

V3-N

OB-24-354

Trend #0

203.0

203.9

0.90

1.51

POR-S

232.0

234.3

2.30

7.95

S1P

Including

232.0

233.0

1.00

14.85

S1P

244.0

245.3

1.30

1.61

S1P

250.0

251.0

1.00

1.14

S1P

264.5

265.6

1.13

1.21

S1P

279.7

282.0

2.30

1.68

TX

302.7

304.0

1.30

6.39

V3-N

OB-24-355

Trend #3

308.6

309.7

1.10

1.04

PON-S3

401.5

403.0

1.50

1.09

V3-S

432.4

437.7

1.59

1.59

S1P

Including

432.4

433.7

1.30

3.91

S1P

440.9

442.0

1.10

1.87

V3-N

466.8

468.9

2.10

3.49

V3-N

473.2

474.2

1.00

1.18

V3-N

OB-24-359W1

Trend #3

429.3

430.8

1.50

3.88

V3-S

465.3

466.3

1.00

1.69

S1P

495.0

496.0

1.00

11.20

S3P

OB-24-361

Trend #3

195.5

196.5

1.00

4.46

PON-S3

215.5

216.5

1.00

2.01

PON-S4

413.0

414.1

1.10

1.34

PON-S5

481.5

483.0

1.50

1.05

PON-S6

514.0

515.5

1.50

1.09

V3-S

572.4

573.4

1.00

15.10

V3-S

633.0

638.0

5.00

3.50

V3-S

Including

633.0

634.3

1.28

8.96

S1P/POR-N

639.0

642.3

3.30

1.43

S1P

OB-24-362

Trend #1

432.2

433.5

1.25

2.16

POR-N

444.5

446.0

1.50

1.70

TX

OB-24-363

Trend #2

194.5

195.9

1.40

6.04

PON-S3

907.7

909.0

1.30

1.03

PON-S3

910.0

911.0

1.00

7.65

PON-S3

1,199.7

1,201.9

2.20

8.41

V3-S

Including

1,200.7

1,201.9

1.20

14.40

V3-S

1,215.2

1,216.4

1.20

1.42

V3-S

1,231.3

1,233.1

1.80

9.07

POR-S

Including

1,232.2

1,233.1

0.90

12.10

POR-S

1,286.5

1,287.5

1.00

2.91

V3-N

OB-25-363W1

Trend #2

877.0

878.3

1.30

1.43

TX

910.6

912.1

1.50

1.59

PON-S3

1,034.0

1,035.0

1.00

1.02

PON-S3

1,037.0

1,038.4

1.40

4.16

V3-S

1,042.6

1,044.0

1.40

1.93

V3-S

1,045.7

1,046.7

1.00

2.17

V3-S

1,052.6

1,059.3

6.70

1.78

V3-S

Including

1,056.5

1,058.0

1.50

4.04

V3-S

1,186.0

1,187.5

1.50

2.10

V3-S

OB-24-364

Trend #1

164.0

165.5

1.50

1.41

PON-S3

371.0

376.5

5.50

1.01

POR-S

388.0

389.4

1.40

12.75

V3-CEN

402.5

404.0

1.50

6.26

S1P

408.5

409.9

1.40

1.40

S1P

413.2

414.7

1.50

11.15

POR-N

440.7

442.0

1.30

2.32

V3-N

OB-25-365

Trend #1

379.0

380.5

1.50

1.40

V3-S

428.5

429.7

1.20

2.85

POR-S

OB-25-365

Trend #1

469.0

473.5

4.50

1.28

POR-N

502.5

504.0

1.50

1.35

S3p

OB-25-366

Trend #3

601.0

602.5

1.50

1.34

PON-S3

619.0

620.0

1.00

3.71

PON-S3

811.9

818.1

6.25

1.21

V3-CEN/S1p/POR-

N

OB-25-371

Trend #2

1,306.0

1,307.5

1.50

1.86

V3-N

1,310.5

1,312.0

1.50

1.36

S3p

1,326.0

1,327.0

1.00

1.48

V3-S

1,335.0

1,338.0

3.00

1.67

V3-S

1,370.5

1,375.2

4.70

1.07

POR-S

1,402.0

1,404.5

2.50

3.99

POR-S

Including

1,402.0

1,403.0

1.00

5.54

POR-N/V3-N

1,405.5

1,406.5

1.00

1.14

S3p

OB-25-371W1

Trend #2

1,058.5

1,061.5

3.00

5.66

PON-S3

Including

1,058.5

1,060.0

1.50

9.97

PON-S3

1,210.9

1,214.0

3.10

3.21

V3-S

1,216.0

1,218.5

2.50

1.86

V3-S

1,265.5

1,267.0

1.50

2.52

V3-S

1,272.7

1,274.2

1.50

1.08

V3-S

1,287.5

1,298.0

10.50

1.29

POR-S

1,323.0

1,324.5

1.50

1.45

S1p

1,327.6

1,328.7

1.10

2.41

POR-N

1,366.5

1,368.0

1.50

1.14

ZFLLC

OB-25-375

Trend #3

538.0

539.5

1.50

7.38

S3p

675.0

676.0

1.00

1.56

S3p

754.0

755.5

1.50

1.25

PON-S3

876.5

878.0

1.50

2.41

PON-S3

882.5

886.0

3.50

1.36

V3-S

Table 3

: Drill Hole Collar Information for Holes contained in this News Release

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10977/265432_a2bf4d99d4dc3aa5_007full.jpg

Notes:

Hole lengths for wedges represent meterage from point of wedge.

For more information on Radisson, visit our website at

www.radissonmining.com

or contact:

Matt Manson

President and CEO

416.618.5885

[email protected]

Kristina Pillon

Manager, Investor Relations

604.908.1695

[email protected]

Forward-Looking Statements

This news release contains "forward-looking information" within the meaning of the applicable

Canadian securities legislation that is based on expectations, estimates, projections, and

interpretations as at the date of this news release. Forward-looking statements including, but are not

limited to, statements with respect to the ability to execute the Company's plans relating to the O'Brien

Gold Project as set out in the Preliminary Economic Assessment; the Company's ability to complete

its planned exploration and development programs; the absence of adverse conditions at the O'Brien

Gold Project; the absence of unforeseen operational delays; the absence of material delays in

obtaining necessary permits; the price of gold remaining at levels that render the O'Brien Gold Project

profitable; the Company's ability to continue raising necessary capital to finance its operations; the

ability to realize on the mineral resource and mineral reserve estimates; assumptions regarding

present and future business strategies, local and global geopolitical and economic conditions and the

environment in which the Company operates and will operate in the future;, planned and ongoing

drilling, the significance of drill results, the ability to continue drilling, the impact of drilling on the

definition of any resource, and the ability to incorporate new drilling in an updated technical report and

resource modelling; the Company's ability to grow the O'Brien Gold Project; the ability to negotiate

and execute an arrangement with IAMGOLD related to the Doyon Mill on satisfactory terms or at all;

and the ability to convert inferred mineral resources to indicated mineral resources.

Any statement that involves discussions with respect to predictions, expectations, interpretations,

beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always

using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's

view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates",

"believes" or "intends" or variations of such words and phrases or stating that certain actions, events

or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not

statements of historical fact and may be forward-looking information and are intended to identify

forward-looking information. Except for statements of historical fact relating to the Company, certain

information contained herein constitutes forward-looking statements Forward-looking information is

based on estimates of management of the Company, at the time it was made, involves known and

unknown risks, uncertainties and other factors which may cause the actual results, performance or

achievements of the companies to be materially different from any future results, performance or

achievements expressed or implied by such forward-looking information. Such factors include, among

others; the risk that the O'Brien Gold Project will never reach the production stage (including due to a

lack of financing); the Company's capital requirements and access to funding; changes in legislation,

regulations and accounting standards to which the Company is subject, including environmental,

health and safety standards, and the impact of such legislation, regulations and standards on the

Company's activities; price volatility and availability of commodities; instability in the global financial

system; the effects of high inflation, such as higher commodity prices; the risk of any future litigation

against the Company; changes in project parameters and/or economic assessments as plans

continue to be refined; the risk that actual costs may exceed estimated costs; geological, mining and

exploration technical problems; failure of plant, equipment or processes to operate as anticipated;

accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental

approvals or financing; risks relating to the drill results at O'Brien; the significance of drill results; and

the ability of drill results to accurately predict mineralization. Although the forward-looking information

contained in this news release is based upon what management believes, or believed at the time, to

be reasonable assumptions, the parties cannot assure shareholders and prospective purchasers of

securities that actual results will be consistent with such forward-looking information, as there may be