Ridgeline Minerals Provides 2023 Exploration Update
Ridgeline Minerals Provides 2023 Exploration
Update
Vancouver, British Columbia--(Newsfile Corp. - June 1, 2023) -
Ridgeline Minerals Corp. (TSXV: RDG)
(OTCQB: RDGMF) (FSE: 0GC0) ("
Ridgeline
" or the "
Company
") is pleased to provide an update on
the Company's 2023 exploration programs and corporate strategy across its portfolio of six projects in
Nevada and Idaho totaling 192 square kilometers (
Figure 1
). The Company intends to spend C$2.0
million on direct drilling and exploration costs through the remainder of the year with the proposed capital
allocation detailed below.
Mike Harp, Ridgeline's Vice President, Exploration commented, "We anticipate multiple catalysts
across the Ridgeline portfolio this year, including a third phase of fully funded drilling at the Swift
project by our earn-in partners, Nevada Gold Mines. However, our team's focus will be the continued
delineation and expansion of the high-grade Chinchilla Zone at our 100% owned Selena project. Last
fall, our first diamond core program at Selena returned the best drill intercepts in the Company's
exploration history and significantly upgraded all metal values when compared to previously drilled
RC holes nearby. This not only represents an opportunity to upgrade the existing mineralized footprint
at Chinchilla, but also improved our understanding of the orientation of key feeder faults controlling
"chimney" style CRD mineralization. Our next phase of core drilling will commence in July, where we
will expand the known upper oxide horizon as well as test these mineralized feeder faults at depth
where they crosscut more than 400m of untested and highly prospective carbonate host rocks."
Figure 1
: Ridgeline's 192km² exploration portfolio in Nevada and Idaho
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7298/168320_e2a1063d241ae848_002full.jpg
For additional information on the Company's projects, click
HERE
Selena Project
The Company will complete a proposed five-hole, 3,000 meters ("m") drill program scheduled to begin in
early July.
Drilling will target high-grade Ag-Au-Pb-Zn mineralization at two known "chimney" targets at the
Chinchilla zone (
Figure 2
) with highlight intercepts from the 2022 core program returning
6.1m
grading 480.5 grams per tonne (g/t) silver ("Ag"), 18.4% lead and zinc ("Pb-Zn") and 0.1
g/t Au
within 32.5m grading 153 g/t Ag, 4.1% Pb-Zn and 0.1 g/t Au in SE22-045 (see January 24,
2023 PR
HERE
)
Core drilling will confirm previously drilled Reverse Circulation ("RC") drill intercepts in the upper
oxide horizon as well as test down-plunge of the projected feeder faults for additional zones of
stacked mineralization within the Guilmette Limestone host (
Figure 2
)
Drill holes will range from 300 m - 650 m depth
Figure 2
: Long Section A-A' showing proposed 2023 core holes targeting high-grade mineralization
along the projection of known "feeder" faults at the Chinchilla zone
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7298/168320_e2a1063d241ae848_003full.jpg
Swift Project
Nevada Gold Mines ("NGM") (Swift project operators) has confirmed that the next phase of framework
drilling is scheduled to begin in early Q3, 2023 pending drill rig availability.
Framework drilling will follow up on encouraging 2022 drill results, which included a highlight
intercept of
48.8m grading 0.45 g/t Au, 0.98 g/t Ag
starting at 667.5m including
3.4m grading
1.92 g/t Au
in SW22-003 (see February 16, 2023 Press Release
HERE
)
A
total of US $5,034,639
in qualifying work expenditures has been spent on the project through
Q1, 2023 and NGM has satisfied the minimum guaranteed work commitment of US $4,000,000
ahead of the scheduled deadline of December 31, 2023
Big Blue Project
The Company's technical team has completed additional field work this spring in the vicinity of the
historic Delker Mine and Skarn Hill adits. Highlights include:
The collection of 14 rock chip samples taken from historical test pits located parallel too and along
strike of the Delker Mine
Test pits were excavated to 1 - 3 m vertical depth by operators in the early 1900's
The collection of 11 continuous trench samples across the Delker Mine adit face (
Picture 1
), and;
7 continuous trench samples across the largest test pit exposure on the property
The identification of multiple copper-oxide bearing felsic dikes that parallel the Delker mine trend
and significantly increase the mineralized footprint at Big Blue (see Big Blue plan map
HERE
)
Picture 1
: Vice President, Exploration Mike Harp pointing at copper-oxide mineralization within a fold
axis at the historically mined Delker Mine adit (past production: ~94k lbs Cu @ 6.2%¹)
Historic mining activity at the Delker Mine is not indicative of future exploration success at Big Blue
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7298/168320_e2a1063d241ae848_004full.jpg
Carlin-East and Bell Creek Projects
Ridgeline views both projects as strategic land positions on the Carlin Trend located directly adjacent to
Nevada Gold Mines owned and operated gold deposits at Ren (1.6 million-oz Au @ 1.66 g/t Au³) and
North Leeville (1.0 million-oz. Au @ 11.3 g/t Au³).
The Company is currently assessing potential partnership opportunities to advance exploration at
both projects
Robber Gulch Project
The Company has identified multiple outcropping shallow-oxide targets to be tested with its in-house
backpack drill rig in Q3 2023 pending approval of a US Forest Service Notice of Intent permit
(see
Robber Gulch long section
HERE
)
.
Highest priority target is located ~500 m south of and on-strike of historic drill hole AC-4 (0.34 g/t
Au oxide over 57.9 m) where the team intends to drill a 10 - 15 m backpack drill hole beneath
outcropping jasperoid that has returned rock chip samples grading up to 6.7 g/t Au
QAQC Procedures
Samples are submitted to American Assay Laboratories (AAL) of Sparks, Nevada, which is a certified
and accredited laboratory, independent of the Company. Independent check samples are sent to
Paragon Geochemical Labs (PAL) of Sparks, Nevada.
Samples are prepared using industry-standard
prep methods and analysed using FA-PB30-ICP (Au; 30 g fire assay) and ICP-5AM48 (48 element
Suite; 0.5 g 5-acid digestion/ICP-MS) methods. AAL also undertakes its own internal coarse and pulp
duplicate analysis to ensure proper sample preparation and equipment calibration. Ridgeline's QA/QC
program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream
with a stringent review of all results completed by the Company's Qualified Person, Michael T. Harp,
Vice President, Exploration.
Technical information contained in this news release has been reviewed and approved by Michael T.
Harp, CPG. the Company's Vice President, Exploration, who is Ridgeline's Qualified Person under
National Instrument 43-101 and responsible for technical matters of this release.
About Ridgeline Minerals Corp.
Ridgeline Minerals is a discovery focused precious and base metal explorer with a proven management
team and a 192 km
2
exploration portfolio across five projects in Nevada and Idaho, USA. More
information about Ridgeline can be found at
www.RidgelineMinerals.com
.
On behalf of the Board
"Chad Peters"
President & CEO
Further Information:
Chad Peters, P.Geo.
President, CEO & Director
Ridgeline Minerals Corp.
+1 775 304 9773
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined
in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this press release.
Cautionary Note regarding Forward Looking Statements
Statements contained in this press release that are not historical facts are "forward-looking
information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the
meaning of applicable Canadian securities legislation and the United States Private Securities
Litigation Reform Act of 1995. Forward-Looking Information includes, but is not limited to, the
anticipated benefits of the Earn-In Agreement and the transaction contemplated thereby. The words
"potential", "anticipate", "meaningful", "discovery", "forecast", "believe", "estimate", "expect", "may",
"will", "project", "plan", "historical", "historic" and similar expressions are intended to be among the
statements that identify Forward-Looking Information. Forward-Looking Information involves known
and unknown risks, uncertainties and other factors which may cause the actual results to be materially
different from any future results expressed or implied by the Forward-Looking Information. In preparing
the Forward-Looking Information in this news release, Ridgeline has applied several material
assumptions, including, but not limited to, assumptions that TSX Venture Exchange approval will be
granted in a timely manner subject only to standard conditions; the current objectives concerning the
Project can be achieved and that its other corporate activities will proceed as expected; that general
business and economic conditions will not change in a materially adverse manner; and that all
requisite information will be available in a timely manner. Forward-Looking Information involves
known and unknown risks, uncertainties and other factors which may cause the actual results,
performance, or achievements of Ridgeline to be materially different from any future results,
performance or achievements expressed or implied by the Forward-Looking Information. Such risks
and other factors include, among others, risks related to dependence on key personnel; risks related
to unforeseen delays; risks related to historical data that has not been verified by the Company; as
well as those factors discussed in Ridgeline's public disclosure record. Although Ridgeline has
attempted to identify important factors that could affect Ridgeline and may cause actual actions,
events, or results to differ materially from those described in Forward-Looking Information, there may
be other factors that cause actions, events or results not to be as anticipated, estimated or intended.
There can be no assurance that Forward-Looking Information will prove to be accurate, as actual
results and future events could differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as
required by law, Ridgeline does not assume any obligation to release publicly any revisions to
Forward-Looking Information contained in this news release to reflect events or circumstances after
the date hereof or to reflect the occurrence of unanticipated events.
Sources
1
Delker Mine Historic Production (Page 57): Smith, R.M., 1976, Mineral resources of Elko County,
Nevada: U.S. Geological Survey Open-File Report 76-56, 201 p.
2
Medicine Springs Results:
https://reynasilver.com/system/uploads/RS-PressRelease-20230117.pdf
3
Barrick Gold Quarterly Reporting - Q4 2022:
https://s25.q4cdn.com/322814910/files/doc_presentations/2023/Barrick_Q4_2022_Results_Presentation.pdf
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/168320