Rock Tech to receive up to 100 million EUR in direct grants for its German Lithium refinery. Funding to be provided by the State of Brandenburg and the German Railway Authority. Further applications for federal guarantees
Rock Tech to receive up to 100 million EUR in direct grants for its German
Lithium refinery. Funding to be provided by the State of Brandenburg and
the German Railway Authority. Further applications for federal guarantees
ongoing.
Brandenburg's Ministry for Economic Affairs, Labour and Energy has issued an LOI committing up to
90 million EUR
in grants for Rock Tech's
Lithium Converter in Guben.
Additionally, the Federal German Railway Authority (Eisenbahnbundesamt
) has offered the prospect of up to
10 million EUR
of public funding to
support the construction of train loading and unloading infrastructure.
The subsides will be paid out over the construction period as non-dilutive equity grants. Payout is contingent on finalization of full equity and
debt financing.
In addition, the application process for up to 400 million EUR of federal guarantees to support Rock Tech's debt financing
is ongoing.
TORONTO
,
June 27, 2024
/CNW/ - Rock Tech Lithium Inc. (TSXV: RCK) (OTCQX: RCKTF) (FWB: RJIB) (WKN: A1XF0V) ("Rock Tech" or the "Company") is
pleased to announce that it has received a binding letter of intent (LOI) signed by the Minister for Economic Affairs in
Brandenburg
,
Joerg Steinbach
, for the grant
of up to
90 million Euros
in subsidies for the Guben Project. In addition, the Company is pleased to announce that its application for federal funding from the
German Railway Authority is progressing well and is expected to lead to a contribution of another
10 million Euros
in grants. This funding is expected to be
provided under the "Anschlussbahnförderung" and will support the company's ambition to shift transports from road to rail, a crucial component of the project's
logistics concept.
Rock Tech Lithium receives LOI over 90 Million Euros in state subsidies. (CNW Group/Rock Tech Lithium Inc.)
Rock Tech's CEO
Dirk Harbecke
comments: "These subsidies are a major milestone for us and a big step towards the realization of the Guben Converter.
Together with the possible federal guarantees, we are targeting governmental financial support of up to
500 million Euros
. In addition to these substantial
subsidies, we have signed a binding feedstock agreement with a leading lithium trading house, C&D Logistics Group, for the procurement of raw material for our
converters and received the full construction and operations permit approvals for Guben. I am very confident that we will finalize the remaining financing steps for
Guben in the coming months."
The LOI confirms that after diligent vetting of the project by the Investitionsbank des
Landes Brandenburg
(Investment Bank of the
State of Brandenburg
, ILB) the
state will grant funding to Rock Tech, provided that the Company achieves full financing for the Guben project. The subsidies will be provided as part of the GRW
funding scheme using the federal regulation "Transformation Technologies". This underlines the significance of Rock Tech's project not only for
Germany
, but also
for the battery cluster in
Brandenburg
. Signing and closing of the grant notice is expected in Q4. The payout of subsidies will occur over the construction period. In
addition, Rock Tech is progressing the application process for a federal guarantee to cover 80% of debt financing—a decision is expected in the course of 2024.
Kerstin Wedemann
, Chief Legal & Operations Officer, adds: "Triggered by the positive subsidy decision we will make significant progress over the next few
months. Next to the finalization of our debt and equity discussions, we will announce our construction partner, start ramping-up the team and initiate the
construction progress."
Rock Tech intends to build and operate
Europe's
first Lithium Converter with a capacity of 24,000 tonnes of Lithium-Hydroxide-Monohydrate per year. The refinery
will be built in Guben,
Germany
and requires financing of approximately
800 million Euros
.
ABOUT ROCK TECH
Rock Tech's vision is to supply the electric vehicle and battery industry with sustainable, locally produced lithium, targeting a 100% recycling rate. To ensure
resilient supply chains, the company plans to build lithium converters at the doorstep of its customers, beginning with the Company's proposed Lithium Hydroxide
Converter in Guben, Brandenburg,
Germany
. The second Converter is planned to be built in
Red Rock, Ontario, Canada
. Rock Tech Lithium plans to source raw
material from its own
Georgia Lake
spodumene project in the Thunder Bay Mining District of
Ontario, Canada
, and procure from other ESG-compliant mines.
Ultimately, Rock Tech's goal is to create a closed-loop lithium production system. Rock Tech has gathered one of the strongest teams in the industry to close the
most pressing gap in the clean mobility story. The Company has adopted strict environmental, social and governance standards and is developing a proprietary
refining process to increase efficiency and sustainability further.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX
VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
CAUTIONARY NOTE CONCERNING FORWARD-LOOKING INFORMATION
Certain statements contained in this news release constitute "forward-looking
information" under applicable securities laws and are referred to herein as "forward-looking statements". All statements, other than statements of historical fact,
which address events, results, outcomes or developments that the Company expects to occur are forward-looking statements. When used in this news release,
words such as "expects", "anticipates", "plans", "predicts", "believes", "estimates", "intends", "targets", "projects", "forecasts", "may", "will", "should", "would",
"could" or negative versions thereof and other similar expressions are intended to identify forward-looking statements. In particular, this press release contains
forward-looking information pertaining to expectations concerning the Guben Converter, including the design and features of the Guben Converter, as well as the
expected costs, capital expenditures, timing and outcomes thereof; statements regarding the Company's future plans, estimates, and schedules relating to the
Guben Converter, including the anticipated timing of future activities taken in support of the development thereof; the conditions of the grant of subisidies and
timing of the pay-out of subsidies by the ILB; Rock Tech's potential financing arrangements; the expected economic performance of the Guben Converter and
anticipated production of battery-grade lithium hydroxide and related processing methods employed; the estimated capital and operating costs of the Guben
Converter; the anticipated timing and outcomes of a final investment decision, construction activities and commissioning of the Guben Converter; statements
regarding the Company's sustainability and ESG related goals and strategy, including the benefits and achievement thereof and future actions taken by the
Company in relation thereto; expected regulatory processes and final outcomes; expectations regarding the electric vehicle industry, including the demand for and
pricing of battery-grade lithium hydroxide and the benefits therefrom, and the development of political and regulatory frameworks especially in
Germany
and the
European Union; Rock Tech's opinions, beliefs and expectations regarding the Company's business strategy, development and exploration opportunities and
projects; and plans and objectives of management for the Company's operations and properties. Forward-looking statements by their nature are based on
assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results to differ materially from the forward-looking
statements, including the risks, uncertainties and other factors discussed in the Company's most recent management's discussion and analysis and annual
information form filed with the applicable securities regulators. No assurances can be given that any of the events anticipated by the forward-looking statements
will transpire or occur, and the Company cautions the reader not to place undue reliance upon any such forward-looking statements. The Company does not
intend, nor does it assume any obligation to update or revise any of the forward-looking statements, whether as a result of new information, changes in
assumptions, future events or otherwise, except to the extent required by applicable law.
View original content to download multimedia:
https://www.prnewswire.com/news-releases/rock-tech-to-receive-up-to-100-million-eur-in-direct-grants-for-its-german-lithium-refinery-funding-to-be-provided-by-the-state-of-brandenburg-and-the-german-railway-authority-further-applications-for-federal-guarantees-ongoing-302183976.html
SOURCE
Rock Tech Lithium Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/June2024/27/c5696.html
%SEDAR: 00005870E
For further information:
For further information: Rock Tech Lithium Inc, 2400-333 Bay Street, Toronto ON M5H 2T6, CAN. Konstantin Burger, VP Investor
Relations: [email protected] +49 89 244109149
CO: Rock Tech Lithium Inc.
CNW 06:00e 27-JUN-24