Ramp Metals Confirms VMS Discovery at Rush Target Drills 1.21% Cu, 9.34% Zn, 5.59g/t Ag over 3.53m in Rush-001 and 0.78% Cu, 1.91% Zn, 0.53% Pb, 12.71g/t Ag over 27m in Rush-010
Ramp Metals Confirms VMS Discovery at Rush
Target
Drills 1.21% Cu, 9.34% Zn, 5.59g/t Ag over 3.53m in Rush-001
and 0.78% Cu, 1.91% Zn, 0.53% Pb, 12.71g/t Ag over 27m in
Rush-010
Vancouver, British Columbia--(Newsfile Corp. - August 5, 2025) - Ramp Metals Inc. (TSXV: RAMP)
("
Ramp Metals
" or the "
Company
") is pleased to announce that it has received assay results from 10
of 20 holes drilled during its Rottenstone SW Spring 2025 program, confirming the discovery of a
substantial copper-zinc VMS system at the Rush target.
Rush-001: 1.21% Cu, 9.34% Zn, 5.59 g/t Ag over 3.53m
Rush-002: 0.44% Cu, 3.44% Zn, 2.84 g/t Ag over 23.70m
Rush-003: 0.76% Cu, 5.42% Zn, 4.47 g/t Ag over 1.5m
Rush-009: 1.29% Cu, 12.38% Zn, 0.28% Pb, 7.47 g/t Ag over 2.55m
Rush-010: 0.78% Cu, 1.91% Zn, 0.53% Pb, 12.71 g/t Ag over 27.00m
Key Highlights:
Ramp Metals is pleased to share key highlights from its ongoing exploration efforts at its flagship
Rottenstone SW Saskatchewan property:
Rush
: Assay results for Rush-001, Rush-002, Rush-003, Rush-004, Rush-009, and Rush-010 have
been received. All drill holes received, excluding Rush-004
indicate substantial copper, zinc,
and silver mineralization
within multiple lenses (
Table 1)
. The Rush-001 & Rush-010 drill collars
were located approximately 165m apart. These results are interpreted as evidence of a new
volcanogenic massive sulphide (VMS) similar to Foran Mining's McIlvenna Bay deposit in
Saskatchewan. Expanded Rush drill results, based on a 0.1% Cu cutoff grade, are available in
Table 2
.
Geophysics
: Initial airborne EM and Mag data for the remainder of the Rottenstone SW claim has
been received, revealing multiple new high-priority targets with geophysical signatures similar to
Rush, Ranger, and Rogue (
Figure 4 & 5)
. The Company anticipates receiving the final airborne
geophysical report in the coming weeks.
Field Program
: An exploration program is planned that will investigate new and existing targets
across the property through prospecting, BHEM, and ground geophysics. A wildfire is currently
burning within the Rottenstone SW claim block (
Figure 6
), thus fieldwork is anticipated to begin
when fire risk decreases later in the summer/fall season. Prospective areas exposed by the current
wildfire will also be examined during this program.
"The copper-zinc VMS discovery at Rush marks an exciting breakthrough for Ramp Metals," stated
Jordan Black, the Company's CEO. "These intercepts from Rush could be compared to those from the
initial phases of Foran Mining's McIlvenna Bay deposit, which is also located in Saskatchewan. Rush
hosts high-grade, near-surface mineralization alongside a large, untested anomaly, with results pointing
to the potential for a significant and high-impact VMS system. With numerous additional geophysical
targets identified and copper market fundamentals stronger than ever, we believe the timing couldn't be
better to aggressively advance this discovery. Backed by a robust treasury of over $5 million dedicated
to exploration, we are fully committed to unlocking a high-grade gold/copper system and driving the Rush
target toward a substantial resource."
Drill Highlights
Table 1: Drill Result Highlights
HOLE ID
From
To
Length (m)
Cu %
Zn %
Ag g/t
Au g/t
Pb %
Co ppm
Rush-001
31.53
33.30
1.77
0.60
6.95
4.99
0.02
0.01
110
Rush-001
61.47
65.00
3.53
1.21
9.34
5.59
0.03
0.02
161
including
63.50
64.00
0.50
2.26
9.75
7.70
0.05
0.01
181
including
64.50
65.00
0.50
2.19
4.64
13.20
0.04
0.04
95
Rush-001
71.94
73.49
1.55
0.68
10.13
3.83
0.02
0.03
80
Rush-001
112.00
117.00
5.00
0.13
0.04
10.31
0.02
0.18
15
including
112.00
113.00
1.00
0.19
0.04
27.20
0.02
0.41
11
Rush-002
55.00
56.50
1.50
0.99
0.36
31.77
0.24
0.01
20
Rush-002
69.30
93.00
23.70
0.44
3.44
2.84
0.01
0.08
39
including
69.30
71.97
2.67
1.71
10.43
7.13
0.03
0.01
147
Rush-002
77.50
78.50
1.00
0.65
3.02
4.30
0.02
0.11
41
Rush-002
89.00
93.00
4.00
0.48
4.49
4.16
0.02
0.12
28
Rush-003
64.00
65.50
1.50
0.76
5.42
4.47
0.04
0.02
84
including
64.69
65.50
0.81
1.31
9.61
7.77
0.07
0.01
143
Rush-003
87.76
93.50
5.74
0.38
1.75
3.45
0.01
0.10
30
including
93.00
93.50
0.50
0.90
1.84
8.60
0.04
0.16
23
Rush-003
100.00
106.00
6.00
0.18
1.21
14.55
0.02
0.82
16
including
100.00
101.00
1.00
0.20
6.90
9.40
0.02
0.79
53
Rush-009
65.50
71.00
5.50
0.35
0.29
2.72
0.02
0.04
15
including
67.00
67.50
0.50
1.35
2.12
6.70
0.03
0.02
37
Rush-009
88.20
90.25
2.05
0.73
10.02
3.76
0.01
0.02
115
Rush-009
97.00
102.00
5.00
0.13
0.08
22.31
0.12
0.39
8
Rush-009
115.95
118.50
2.55
1.29
12.38
7.47
0.04
0.28
155
Rush-009
135.00
136.50
1.50
0.53
12.55
8.70
0.04
0.40
139
Rush-009
172.75
176.50
3.75
0.18
5.31
3.31
0.02
0.01
40
Rush-009
178.00
179.00
1.00
0.13
7.35
2.05
0.04
0.02
43
Rush-010
18.00
45.00
27.00
0.78
1.91
12.71
0.05
0.53
40
including
21.50
25.50
4.00
0.90
9.99
18.79
0.03
2.60
85
including
34.50
45.00
10.50
1.41
0.61
21.39
0.10
0.15
51
Rush-010
94.00
96.00
2.00
0.48
0.05
0.99
0.03
0.01
18
*True widths have not been determined at this time
.
Rush
The Company has received assay results for Rush-001, Rush-002, Rush-003, Rush-004, Rush-009, and
Rush-010. To date, all drill holes returned at the Rush target, excluding Rush-004, have encountered
significant Cu-Zn-Ag mineralization within multiple lenses (
Table 1
), which the Company considers
indicative of a new VMS discovery in Saskatchewan. Rush-001, Rush-002, Rush-003, and Rush-009
were drilled at the initial discovery zone
(Figure 1
), while Rush-010 tested the NE edge of the conductive
anomaly where the rock samples during the October 2024 field program were taken (
January 20, 2025
News Release).
This mineralization encountered in Rush-010 represents a
165m step-out
from the
mineralization encountered in Rush-001, Rush-002, Rush-003 & Rush-009
.
"We are extremely pleased with our new discovery at the Rush VMS target." commented Garrett Smith,
Ramp Metals' VP of Exploration. "VMS deposits tend to form in clusters, and the recently completed
geophysics highlight a number of additional targets. We look forward to expanding on this new
discovery, and continuing to track down the high-grade gold encountered during last season."
Figure 1: Locations and assay status of Rush Drill Holes from the 2025 Spring Drill Program
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_001full.jpg
Photo 1: Rush-001 Box 13 & 14; 57.55-66.53m
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_002full.jpg
Photo 2: Rush-002 Box 15 & 16; 66.32-75.34m
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_003full.jpg
Photo 3: Rush-009 Box 25 & 26; 109.43-118.70m
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_004full.jpg
Photo 4: Rush-010 Box 5 & 6; 20.25-29.23m
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_005full.jpg
Photo 5: Rush-010 Box 9 & 10; 38.13-47.14m
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_006full.jpg
Figure 2: Rush Cross section A'-B'. Location slice can be seen in Figure 1
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_007full.jpg
The Rush target is a newly identified area of interest located approximately 7.5 km NW of Ranger. Rush
overlies a NE-SW striking zone of high conductivity approximately 1200m in length. The area is heavily
forested, and bedrock exposure is limited to sporadic ridges which parallel the NE-SW regional foliation.
A total of 10 holes were drilled in the Spring 2025 program at Rush, and 56 rock samples were taken in
Fall 2024. Disseminated Chalcopyrite and Malachite staining were noted in multiple rock samples. Rock
samples returned values of up to 1.61% copper, 0.79 g/t gold, and up to 113 g/t silver across different
samples. A total of 24 soil samples were also taken and returned values of up to 798.5 ppm copper and
21,152 ppb (21.15 g/t) silver (
January 20, 2025
News Release).
Ranger
Ranger-002, Ranger-003, Ranger-004, and Ranger-005 did not yield significant gold intercepts with
assay results reaching up to 0.104g/t Au over 1m. In addition to Ranger-001, drill holes Ranger-002,
Ranger-003, and Ranger-004 returned intercepts between 2 and 10 metres in length, with weakly
elevated concentrations of copper, zinc, and silver mineralization. While these values are low, they are
consistently observed and contextually significant in relation to the sulphide content, the geophysical
signature, and the previously identified gold from earlier drilling and field programs. The Company
believes that it may be on the edge of a more robust system and intends to investigate further once
assays from all Ranger drill holes are returned.
Assays remain pending for Ranger-006, Ranger-007, and Ranger-008. Ranger-008 tested an EM
anomaly approximately 1.5km to the NE of Ranger-001.
Figure 3: Locations and assay status of Ranger Drill Holes from the 2025 Spring Drill Program
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_008full.jpg
Rogue
Three drill holes were completed at the Rogue target. Assays are currently pending for Rogue-004,
Rogue-005, and Rogue-006. Drill hole locations at Rogue can be seen in the
June 6, 2025 News
Release
.
Geophysics
The Company has completed Airborne geophysics using the Xcite HTDEM system across the entire
Rottenstone SW property (
April 14, 2025 News Release
), which generated multiple new high-priority
targets with geophysical signatures similar to Rush, Ranger, and Rogue. Initial Mag and EM geophysical
results for the remainder of the Rottenstone SW property have become available as seen in
Figure 4
and Figure 5
.
Ground and BHEM geophysical surveys are scheduled at Rush to further delineate targets along the
Rush anomaly. Dias Geophysical, based in Saskatoon, SK, has been contracted to conduct these
surveys.
Figure 4: Updated Total Magnetic Intensity Map for Rottenstone SW
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_009full.jpg
Figure 5: Airborne EM Conductivity Map
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8725/261254_ef0361c8e4f3e918_010full.jpg
Field Program
An exploration program is planned that will assess new and existing targets across the property through
prospecting, BHEM, and ground geophysics.
Currently there is a wildfire burning within the Rottenstone
SW Claim block
. Fieldwork will begin when wildfire risks decrease later into the summer/fall season.
Prospective areas exposed by the current fire will also be examined during this program. See
Figure 6
for the current perimeter of the wildfire on the Rottenstone SW claim as of August 3, 2025.