Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

RAK.V ·

Rackla Metals reports a significant intercept of 10.5 meters grading 2.56 g/t gold in hole G25-009, which included an intercept of 8.45 g/t gold over 1.5 m, the strongest result from the 2025 campaign (Table 1). The gold intercepts show good correlation with bismuth and a moderate correlation with t

Drill Results

Grad Property Returns 10.5m @ 2.56 G/T Au in hole G25-009

Vancouver, British Columbia – December 10th, 2025 – Rackla Metals Inc. (TSX-V: RAK) (the “Company”)

reports analytical results from drill holes G25-009 and G25-010 from the 2025 campaign at the Grad

property. These holes tested the Intrusive-sediment contact south of the BiTe showing and continued well

into the intrusive south of previously announced holes G25-004 to G25-008 (see news release dated

November 27, 2025, Figure 1).

Rackla Metals reports a significant intercept of 10.5 meters grading 2.56 g/t gold in hole G25-009, which

included an intercept of 8.45 g/t gold over 1.5 m, the strongest result from the 2025 campaign (Table 1).

The gold intercepts show good correlation with bismuth and a moderate correlation with tellurium and

tungsten. However, overall, the bismuth concentration in these holes is much less than was visually

estimated during core logging.

Table 1 – Summary of drill hole results from holes G25-009 and G25-010 (intercepts are core intervals and may not

represent true widths).

The BiTe Zone is located at the base of the steep cliff in Figure 1 in the center of the area drill tested. It has

been mapped as an intensely altered quartz -sericite zone in quartz -monzonite with bismuth sulphide

and/or tellurides. Surface sampling in 2024 and 2025 returned high-grade gold results in chip-channel and

grab samples. Talus-fine sampling along the base of the cliff returned 500m averaging over one gram per

tonne of gold with coincident, anomalous bismuth and tellurium. Drilling to date has fa iled to return any

continuity to the gold mineralization at depth nor has it returned any of the high- grade gold results

returned from the surface samples.

A characteristic of RIRGS deposits in the Tombstone Gold Belt is that vein density is typically an indication

of grade. However, the results observed to date from the drilling at the Grad Property indicate that vein

density is not the determining factor as hole G25-010 is intensely veined yet returned only weak, sporadic

gold intercepts.

Hole From (m) T o (m) I nterv al (m) Gold (g/t) Bismuth (ppm) T ellurium (ppm) T ungsten (ppm)

116.50 127.50 10.50 2.56 923.3 42.6 778.4

incl. 119.00 120.50 1.50 8.45 2380.0 96.1 86.8

367.50 369.00 1.50 0.33 5.4 <0.05 1.4

501.50 503.00 1.50 0.45 18.2 <0.05 6.4

172.50 175.50 3.00 0.32 283.4 8.9 5.9

201.00 202.50 1.50 2.63 669.0 30.4 3.4

250.10 250.60 0.50 0.41 561.0 9.1 14.4

G25-009

G25-010

1111 Melville Street, Suite 1000

Vancouver, BC V6E 3V6, Canada

www.racklametals.com

T 604.801.5432

F 604.662.8829

TF 1.888.627.9378

TSX.V: RAK

-2-

Figure 1 – Plan map of the BiTe Showing drill hole traces with vein density counts (G25-009 and G25-010 highlighted)

Trenching at the Manta showing yielded low -grade results despite high- grade grab samples. The Manta

showing is located in altered sedimentary rocks at the contact with the Manta intrusive body, 1.5km south

of the BiTe showing. Initial grab and 1m chip samples from quartz-bismuthinite veins in metasomatically

altered skarn zone at two locations returned a 5 multi-gram gold results (5.73, 8.36, 11.75, 48.3 and 52.1

g/t gold, Figure 2) . However, channel sampled t renches cut across each of these area s returned

disappointing results with the best being 0.63 g/t gold over 1 m in the northern trench and 1.41 g/t gold

over 1 m in the southern trench.

Given the number of high-grade gold results obtained from the sampling at Grad and adjacent prospects,

further work needs to be done in the region. The Company is working with the data collected in the 2025

campaign to refine its model for the region and is planning a methodical approach for 2026 with the goal

to unlocking the key to these gold discoveries in this very prospective region of the Tombstone Gold Belt.

-3-

Figure 2 – Surface Grab and Trench Sampling Results for Gold at the Manta Showing

Rackla has a Cooperation and Benefits Agreement with the Sahtu Dene First Nation and remains

committed to maintaining the respectful, collaborative relationship. As we advance exploration at our

properties, we will continue working closely with local stakeholders and regulatory agencies to ensure our

activities create long-term value and reflect community priorities.

Sampling Methodology

For the 2025 program drilling was NTW-sized core. Once the core was received at the core logging facility

it was systematically logged for geological attributes, photographed and marked for sampling by the

geological staff. Sample lengths were generally 1.5 meter or less depending on the need to isolate features

of interest. Core sampling was accomplished by cutting in half lengthwise along a pre -determined line,

with one half to be sent to the lab and one half stored as a record. Field duplicates were coll ected at

regular intervals as ¼ core samples by splitting the ½ core to be sent to the lab, leaving a consistent record

of half core material from duplicate and non- duplicate samples alike. Standard reference materials were

inserted by Rackla personnel at regular intervals into the sample stream. The samples were delivered by

expeditor to ALS Canada Ltd preparatory facility in Whitehorse, Yukon. Sample preparation was completed

at either the Whitehorse facility or re-directed by ALS to their Langley, BC facility, depending on workloads,

with final analyses completed at the ALS laboratory in North Vancouver.

ALS Canada Ltd is accredited to ISO/IEC 17025:2017 and ISO9001:2015 for quality management. Core and

rock samples were prepared according to the ALS Prep- 31A procedure, which involved crushing to >70%

passing below 2 mm and split using a riffle splitter. 250 g splits were pulverized to >85% passing below 75

-4-

microns. A four-acid digest with an inductively coupled plasma mass spectroscopy (ICP-MS) finish was used

for 48-element analysis on 0.25 g sample pulps (ALS code: ME-MS61). All samples were analysed for gold

content by fire assay with an atomic absorption spectroscopy (AAS) finish on 50 g samples (ALS code: Au-

GRA22). In addition, samples that returned over limits for bismuth, tellurium, arsenic, base metals and

silver we assayed by Ore Grade analytical methods.

For the purposes of this release, contiguous mineralized intervals at are defined as runs of mineralization

>0.3 g/t Au.

Qualified Person

Scott Casselman, B.Sc., P.Geo., Vice-President Exploration of the Company, is a member of the Association

of Professional Engineers and Geoscientists of British Columbia and is the Company’s Qualified Person as

defined by National Instrument 43- 101. Mr. Ca sselman has reviewed and approved the technical

information contained in this news release.

About Rackla

Rackla Metals Inc. (TSX-V: RAK) is a Vancouver, Canada based junior gold exploration company. The

Company is targeting Reduced Intrusion-Related Gold Systems (RIRGS) mineralization on the southeastern

part of the Tombstone Gold Belt in eastern Yukon and western Northwest Territories. Management

believes that this area, which is underexplored for RIRGS deposit types, has the potential to be the next

frontier for the discovery of these large gold systems.

ON BEHALF OF THE BOARD

Simon Ridgway,

CEO and Director

Tel: (604) 801-5432; Fax: (604) 662-8829

Email: [email protected]

Website: www.racklametals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this news release.

Forward-Looking Information

Certain statements contained in this news release constitute forward-looking statements within the meaning of

Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-

looking statements and include, without limitation, the Company’s exploration plans for 2026; and general business

and economic conditions. Often, but not always, these forward looking statements can be identified by the use of

words such as “estimate”, “estimates”, “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”,

“detailed”, “has been”, “gain”, “upgraded”, “offset”, “limited”, “contained”, “reflecting”, “containing”, “remaining”,

“to be”, “periodically”, or statements that events, “could” or “should” occur or be achieved and similar expressions,

including negative variations.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the

actual results, performance or achievements of the Company to be materially different from any results, performance

or achievements expressed or implied by forward-looking statements. Such uncertainties and factors include, among

others, whether exploration plans will proceed as anticipated; changes in general economic conditions and financial

-5-

markets; the Company or any joint venture partner not having the financial ability to meet its exploration and

development goals; risks associated with the results of exploration and development activities, estimation of mineral

resources and the geology, grade and continuity of mineral deposits; unanticipated costs and expenses; and such

other risks detailed from time to time in the Company’s quarterly and annual filings with securities regulators and

available under the Company’s profile on SEDAR+ at www.sedarplus.ca. Although the Company has attempted to

identify important factors that could cause actual actions, events or results to differ materially from those described

in forward-looking statements, there may be other factors that cause actions, events or results to differ from those

anticipated, estimated or intended.

Forward-looking statements contained herein are based on the assumptions, beliefs, expectations and opinions of

management, including but not limited to: that the Company’s stated goals and planned exploration activities at its

properties will be achieved; that there will be no material adverse change affecting the Company, its properties or its

securities; and such other assumptions as set out herein. Forward-looking statements are made as of the date hereof

and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new

information, future events or results or otherwise, except as required by law. There can be no assurance that forward-

looking statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. Accordingly, investors should not place undue reliance on forward-looking

statements.