Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

QTWO.V ·

Q2 Metals Drills 347.1 m at 1.35% Li2O including 30 m at 1.76% Li2O at the Cisco Lithium Property, James Bay, Quebec, Canada

Drill Results

Q2 Metals Drills 347.1 m at 1.35% Li2O including 30 m at 1.76% Li2O

at the Cisco Lithium Property, James Bay, Quebec, Canada

Highlights:

• Three (3) drill holes with strong analytical results from the summer drill campaign are

reported herein and highlights include:

o CS-24-021: Widest interval at 347.1 metres (“m”) at 1.35% Li2O, including seven (7)

higher-grade sub-intervals, including 30 m at 1.76% Li2O.

o CS-24-017: Widest interval at 71.8 m at 1.01% Li2O, including 13.3 m at 1.77% Li2O.

o CS-24-019: Widest interval at 56.8 m at 1.06% Li2O, including 9.1 m at 1.80% Li2O.

• Core assay results for three (3) drill holes remain to be reported.

Vancouver, British Columbia, October 28, 2024 – Q2 Metals Corp. (TSX.V: QTWO | OTCQB:

QUEXF | FSE: 458) (“Q2” or the “Company”) is pleased to report the core assay results on drill

holes CS-24-017, 019 and 021 from the 2024 drill campaign at the Cisco Lithium Property (the

“Property” or the “Cisco Property”) located within the greater Nemaska traditional territory of

the Eeyou Istchee James Bay region of Quebec, Canada. All drill holes intersected pegmatite with

visual indications of spodumene mineralization identified.

“The results for drill hole 21 have been widely anticipated and it has delivered," said Alicia Milne,

President and Chief Executive Officer of Q2 Metals. "We still have three more drill holes to report

and are in the process of planning an accelerated exploration program in 2025 to understand the

true potential at the Cisco Lithium Property.”

“The results of the continuous, greater than 300 metres interval, has been yet another piece of

validation to the story of Cisco,” said Neil McCallum, Vice President Exploration of the Company.

“We’ve drilled some world-class intervals already, but the development of Cisco is still in its

infancy and we look forward to continuing our understanding of the project through further

drilling in 2025.”

The analytical results reported herein represent 1,431.1 m of drilling over three (3) holes during

the summer drill campaign; with analytical results remaining to be reported on three (3)

additional drill holes that were completed (drill holes CS-24-020, 022 and 023).

TSX-V: QTWO

OTCQB: QUEXF

FSE: 458

Complete highlighted intervals from holes CS-24-017, 019 and 021 are summarized in Table 1 and

represented in Figure 1, with two cross sections in Figures 2 and 3.

Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property

Drill holes CS-24-017 and 019 targeted the western portions of the wide mineralized zone. The

results reveal several separate mineralized intervals including the widest interval of 71.8 m at

1.01% Li2O, including 13.3 m at 1.77% Li2O in CS-24-017 and 56.8 m at 1.06% Li2O, including 9.1

m at 1.80% Li2O in CS-24-019.

Drill hole CS-24-021 (Hole 21) targeted the central portions of the wide mineralized zone with

results of 347.1 m at 1.35% Li2O, including seven (7) higher-grade sub-intervals, including 30 m

at 1.76% Li2O. Hole 21 is located approximately 200 m north of hole CS-24-018 which assays

reported a 215.6 m interval at 1.69% Li2O, including 64.6 m at 2.29% Li2O. Hole 21 is also located

south of hole CS-24-010 which assays reported a 120.3 m interval of 1.72% Li2O.

Figure 2. Cross Section A (looking northeast)

Figure 3. Cross Section B (looking northeast)

Table 1. Summary of Analytical Results of Drill Holes at Cisco Property

All intervals of greater than 2 m of core-length are included in the table. Internal dilution of non-

pegmatite material was limited to intervals of less than 5 m. No specific grade cap or lower cut-

offs were used during grade and width calculations. All intervals are reported as core widths and

mineralized intervals in all the holes drilled thus far are not representative of the true width as

the modelled pegmatite zones are being refined with every additional hole. Drill hole collar

information has been previously reported for each drill hole reported herein and is also available

at: https://www.q2metals.com/property/cisco-lithium-property/.

Due to the Quality Assurance/Quality Control (QA/QC) protocols in place by both the Company

and the analytical laboratory (SGS Canada), drill hole CS-24-020, and the uppermost pegmatite

interval of drill hole CS-24-021 were re-submitted for testing. Results will be reported when

received and reviewed by the Company.

About the Cisco Property

The Cisco Property is comprised of 222 mineral claims and is 11,374 hectares in size. It is located

less than 10 kilometres (“km”) east of the Billy Diamond Highway, and is approximately 150 km

north of Matagami, a small town that contains the closest rail link to much of James Bay. The

Property lies within the greater Nemaska Community lands of the Eeyou Istchee Territory, James

Bay, Quebec.

The Property is situated along the Frotet Evans Greenstone Belt, comprised of a volcanic package

dominated by mafic to felsic metavolcanic rocks, of the southern James Bay Lithium District, the

same belt that hosts the Sirmac and Moblan lithium deposits, located 130 km and 180 km away,

respectively.

Sampling, Analytical Methods and QA/QC Protocols

All drill core samples were shipped to SGS Canada’s preparation facility in Val D’Or, Quebec, for

standard sample preparation (code PRP92) which includes drying at 105°C, crushing to 90%

passing 2 mm, riffle split 500 g, and pulverize 85% passing 75 microns. The pulps are then shipped

by air to SGS Canada’s laboratory in Burnaby, BC, where the samples are homogenized and

subsequently analyzed for multi-element (including Li and Ta) using sodium peroxide fusion with

ICP-AES/MS finish (code GE_ICM91A50). The reported Li grade was reported by SGS Canada as

lithium oxide (Li2O). Drill core was saw-cut with half-core sent for geochemical analysis and half-

core remaining in the box for reference. The same side of the core was sampled to maintain

representativeness.

A Quality Assurance / Quality Control (QA/QC) protocol following industry best practices was

incorporated into the sampling program. Measures include the systematic insertion of quartz

blanks and certified reference materials (CRMs) into sample batches at a rate of approximately

5% each. Additionally, analysis of pulp-split and reject-split duplicates was completed to assess

analytical precision. The QP has verified the QA/QC results of the analytical work.

Qualified Person

Neil McCallum, B.Sc., P.Geol, is a registered permit holder with the Ordre des Géologues du

Québec and Qualified Person as defined by NI 43-101 and has reviewed and approved the

technical information in this news release. Mr. McCallum is a director and VP Exploration for Q2.

Marketing Engagement

The Company announces that it has engaged Resource Stock Digest (“RSD”), for an advertising

and marketing program, consisting of report creation and dissemination, commencing on

November 1, 2024, for a total cost of USD$20,000 payable prior to commencement of the

campaign. The engagement is expected to be in place for the later of (a) one month and, (b) the

exhaustion of the USD$20,000 fee. RSD and the Company deal with each other at arm’s length.

RSD is owned and operated by Gerardo Del Real and Nick Hodge.

About Q2 Metals Corp

Q2 Metals is a Canadian mineral exploration company focused on unlocking its portfolio of

lithium projects in the Eeyou Istchee James Bay region of Quebec, Canada, that includes both its

100-per-cent-owned Mia Lithium Property and the Cisco Lithium Property.

The Cisco Lithium Property is located approximately 150 km north of Matagami, Que., and

comprises 222 mineral claims and is 11,374 ha in size. The property has district-scale potential

with an already identified mineralized zone and a discovery drill result that included 120.3 metres

at 1.72% Li2O (hole CS-23-010).

FOR FURTHER INFORMATION, PLEASE CONTACT:

Alicia Milne Jason McBride

President & CEO Corporate Communications

[email protected] [email protected]

Telephone: 1 (800) 482-7560

E-mail: [email protected]

WWW.Q2Metals.com

Follow the Company: Twitter, LinkedIn, Facebook, and Instagram

Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (collectively, “forward-

looking statements”) within the meaning of applicable Canadian legislation. Forward-looking statements are

typically identified by words such as: “believes”, “expects”, “anticipates”, “intends”, “estimates”, “plans”, “may”,

“should”, “would”, “will”, “potential”, “scheduled” or variations of such words and phrases and similar expressions,

which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or

achieved. Accordingly, all statements in this news release that are not purely historical are forward-looking

statements and include statements regarding beliefs, plans, expectations and orientations regarding the future

including, without limitation, any statements or plans regard the geological prospects of the Company’s properties

and the future exploration endeavors of the Company. Although the Company believes the expectations expressed in

such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of

future performance and actual results or developments may differ materially from those in the forward-looking

statements. Forward-looking statements are based on a number of material factors and assumptions.

Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual

results to differ materially from those anticipated in such forward-looking statements. The forward-looking

statements in this news release speak only as of the date of this news release or as of the date specified in such

statement. Forward looking statements in this news release include, but are not limited to, drilling results on the

Cisco Property and inferences made therefrom, the potential scale of the Cisco Property, the focus of the Company’s

current and future exploration and drill programs, the scale, scope and location of future exploration and drilling

activities, the Company's expectations in connection with the projects and exploration programs being met, the

Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation

of mineral resources, exploration and mine development plans, timing of the commencement of operations and

estimates of market conditions. Factors that could cause actual results to differ materially from those in forward-

looking statements include failure to obtain necessary approvals, variations in ore grade or recovery rates, changes

in project parameters as plans continue to be refined, unsuccessful exploration results, changes in project parameters

as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and

financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory

changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment

breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on

operations and costs to remedy same. Readers are cautioned that mineral exploration and development of mines is

an inherently risky business and accordingly, the actual events may differ materially from those projected in the

forward-looking statements. Additional risk factors are discussed in the section entitled “Risk Factors” in the

Company’s Management Discussion and Analysis for its recently completed fiscal period, which is available under

Company’s SEDAR profile at www.sedarplus.ca.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking

statements prove incorrect, actual results may vary materially from those described herein as intended, planned,

anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks,

uncertainties and factors which could cause actual results to differ materially, there may be others that cause results

not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation,

to update this forward-looking information except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.