Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

QGR.V ·

Q-Gold Resources Files NI 43-101 Technical Report on Mineral Resource Estimate for the Quartz Mountain Gold Project

Resource Estimates Technical Reports (NI 43-101)

Q-Gold Resources Files NI 43-101 Technical Report on Mineral Resource

Estimate for the Quartz Mountain Gold Project

TORONTO, Oct. 23, 2025 -- Q-Gold Resources Ltd. (TSXV: QGR) (“QGold” or the “Company”) announces details of the

updated mineral resource estimate (“MRE” or “Mineral Resource Estimate ”) set out in the technical report (the “ Technical

Report”) filed by the Company on October 20, 2025, respecting its Quartz Mountain property (“ Quartz Mountain ”), which

forms a part of the Company's recently acquired wider Quartz Mountain Gold project (“ Quartz Mountain Gold Project ”),

located in the historic Quartz Mountain District in southern Oregon, U.S.A. For more information about the Company’s recent

indirect acquisition of the Quartz Mountain Gold Project, please see the Company’s press release dated October 22, 2025,

which is available under the Company’s SEDAR+ profile at www.sedarplus.ca.

The Technical Report, titled “ National Instrument 43-101 Technical Report and Mineral Resource Estimate of the Quartz

Mountain Project, Lake County Oregon, USA”, with an effective date of September 26, 2025, was prepared for the Company by

FHB Consulting Services LLC in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects

(“NI 43-101”). Reference should be made to the full text of the Technical Report, which is also available on the Company’s

SEDAR+ profile.

The Quartz Mountain Gold Project is in south-central Oregon, approximately 50 km west-northwest of Lakeview, Oregon (see

Figure 1). The Quartz Mountain Gold Project consists of two properties, together comprising 96 unpatented lode mining claims

described as the “Quartz Mountain Project Claims” and 158 unpatented lode mining claims described as the “Angel’s Camp

Project Claims”. Two identified deposits are located on the Quartz Mountain Gold Project: the Crone Hill deposit, and the

Quartz Butte deposit, which are approximately one kilometer apart from each other (see Figure 2).

A total of 772 drill holes were used for the Mineral Resource Estimate, representing approximately 81,000 meters of

exploration drilling on the Quartz Mountain Gold Project. An additional total of approximately 10,000 meters has been drilled

on Angel’s Camp, the other property comprising the Quartz Mountain Gold Project.

Au block grades were estimated by “inverse distance cubed” (“ ID3”) and “ordinary kriging” (“OK”) linear interpolation using a

minimum of three and maximum of 12 composites. Ag block grades were estimated by “inverse distance cubed”. A “nearest

neighbor” model was also generated for Au using the same parameters. Search and estimation were constrained by the

mineralization domains, which define a hard boundary. Review of the estimation results indicates excessive smoothing of the

OK result, therefore the ID3 estimate was selected for the Mineral Resource Estimate.

Blocks were classified based on the local drill hole spacing within each domain. Based on the variography and observed

continuity of grade, all blocks within 120 feet (36.6 m) of three or more drill holes were classified as “indicated mineral

resource”, and all additional estimated blocks were classified as “inferred mineral resource” (as such terms are defined in NI 43

-101).

Highlights of the updated Mineral Resource Estimate are as follows (Table 1):

◾ The Mineral Resource Estimate is amenable to conventional open-pit mining methods;

◾ The indicated mineral resource includes a total of 1.543 Moz Au at a grade of 0.96 g/t Au;

◾ The inferred mineral resource includes a total of 0.148 Moz Au at a grade of 0.77 g/t Au.

Table 1: Quartz Mountain Gold Project 2025 Mineral Resource Estimate

TOTAL CLASS CUTOFF TONNES AG AG AU AU

Au g/t kt g/t Ounces g/t Ounces

Oxide Indicated 0.20 27,502 0.99 877,000 0.74 654,000

Oxide Inferred 0.20 3,679 0.64 76,000 0.64 76,000

Sulphide Indicated 0.60 22,500 1.62 1,172,000 1.23 888,000

Sulphide Inferred 0.60 2,313 0.80 60,000 0.98 73,000

Total Indicated -X- 50,002 1.27 2,049,000 0.96 1,543,000

Total Inferred -X- 5,992 0.70 135,000 0.77 148,000

CRONE

HILL CLASS CUTOFF TONNES AG AG AU AU

Au g/t kt g/t Ounces g/t Ounces

Oxide Indicated 0.20 18,132 1.09 638,000 0.72 421,000

Oxide Inferred 0.20 3,001 0.64 61,000 0.63 61,000

Sulphide Indicated 0.60 18,420 1.69 1,003,000 1.23 728,000

Sulphide Inferred 0.60 1,930 0.72 45,000 0.95 59,000

QUARTZ

BUTTE CLASS CUTOFF TONNES AG AG AU AU

Au g/t kt g/t Ounces g/t Ounces

Oxide Indicated 0.20 9,370 0.79 239,000 0.77 233,000

Oxide Inferred 0.20 678 0.67 15,000 0.67 15,000

Sulphide Indicated 0.60 4,080 1.28 168,000 1.22 161,000

Sulphide Inferred 0.60 383 1.20 15,000 1.10 14,000

1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral

resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues.

2) Mineral resources were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards

on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve

Definitions and adopted by CIM Council.

(3) The quantity and grade of the inferred mineral resources in this estimation are uncertain in nature and there has been

insufficient exploration to define these inferred mineral resources as an indicated or measured mineral resource and it is

uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category.

(4) Composite grade capping was implemented prior to grade estimation.

(5) Bulk density was assigned by target area.

(6) A gold price of US$2,334/oz was used.

(7) Mineral resources are reported within an optimized pit shell.

(8) Totals may differ due to rounding.

(9) Effective Date: September 26, 2025

(10) The qualified person responsible for the Mineral Resource Estimate is Fred Brown, P.Geo.

Table 2: Quartz Mountain Mineral Resource Estimate Cut-Off Grade Sensitivity (Base Case in Bold)

TOTAL CLASS CUTOFF TONNES AU AU

Au g/t kt g/t Ounces

Oxide Indicated

1.00 5,260 1.60 271,000

0.80 8,277 1.34 358,000

0.60 13,146 1.10 466,000

0.40 20,604 0.88 584,000

0.20 27,502 0.74 654,000

0.10 27,877 0.73 656,000

Oxide Inferred

1.00 422 1.64 22,000

0.80 781 1.30 33,000

0.60 1,427 1.03 47,000

0.40 2,466 0.80 63,000

0.20 3,679 0.64 76,000

0.10 3,742 0.63 76,000

Sulphide Indicated

1.00 10,738 1.72 594,000

0.80 15,717 1.46 737,000

0.60 22,500 1.23 888,000

0.40 29,722 1.05 1,005,000

0.20 34,075 0.96 1,050,000

0.10 34,261 0.95 1,051,000

Sulphide Inferred

1.00 592 1.61 31,000

0.80 1,197 1.24 48,000

0.60 2,313 0.98 73,000

0.40 3,720 0.80 95,000

0.20 4,410 0.72 103,000

0.10 4,440 0.72 103,000

1) All notes as per Table 1.

Table 3: Quartz Mountain MRE Cut-off Grade Calculation Breakdown

Oxide Leach   Sulfide Mill

Au Price $/oz US$2,334   Au Price US$2,334

Au Oxide Recovery 65%   Au Mill Recovery 80%

Leach Process Cost $/t US$6.00   Mill Process Cost/t US$32.00

G&A Cost/t US$4.00   G&A Cost/t US$4.00

Processing $/t US$10.00   Processing US$36.00

Leach Au Cut-off g/t 0.20   Mill Au Cut-off g/t 0.60

Mining Cost $/t US$3.00   Mining Cost $/t US$3.00

Pit Slope 50 deg   Pit Slope 50 deg

Qualified Persons

The scientific and technical information contained in this news release has been reviewed and approved by Fred Brown,

P.Geo., and Dr. Andreas Rompel, Vice President, Exploration of QGold, Pr.Sci.Nat., both a “qualified person” within the

meaning of NI 43-101.

Peter Tagliamonte, P.Eng., President and CEO of QGold, stated:

“We are extremely pleased with the findings of the Technical Report. Its completion marks a significant milestone for QGold in

validating the mining potential of the Quartz Mountain Gold Project and lays a strong foundation for future exploration and

expansion. With the Technical Report now complete, the Company will initiate technical studies to assess the economic

viability of Quartz Mountain, while concurrently beginning the permitting process. We are excited to move the Quartz Mountain

Gold Project forward into its next phase of development.”

Dr. Andreas Rompel, Vice President of Exploration of QGold, added:

“The completion of the Technical Report confirms a substantial mineral resource estimate increase to more than 1.54 million

ounces (50,002 kt at 1.27g/t) of gold in the “indicated mineral” category and 148 thousand ounces (5,992 kt at 0.70g/t Au) in

the “inferred mineral resource” category. More significantly, the “indicated mineral resource” category has grown by over 500%,

highlighting both the quality and consistency of mineralization at Quartz Mountain. These results are highly encouraging, and

we are confident that with continued exploration, the resource base will expand even further.”

ABOUT Q-GOLD RESOURCES LTD.

QGold is a North American gold resources exploration company focused on past-producing mining camps located in mining-

friendly jurisdictions with district-scale potential. The Company's ultimate objective is to become an intermediate gold producer

by advancing its 100%-owned Mine Centre Project, located in Ontario, Canada, and the Quartz Mountain Gold Project in the

historic Quartz Mountain mining district in Oregon, U.S.A.

For further information, visit our website at QGold or contact:

Peter Tagliamonte, P.Eng.

President and CEO

Email:[email protected]

Dr. Andreas Rompel

VP Exploration, COO

Email:[email protected]

Cell: +1 778 987 9114

Figure 1. Project Location at the central southern part of Oregon, USA.

Figure 2. Project Drill Hole Collar Locations at Quartz Mountain and Angel’s Camp.

Cautionary Notes

This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation.

Forward-looking information includes, but is not limited to, statements with respect to the Company’s beliefs, plans,

expectations or intentions for the Quartz Mountain Gold Project, and other matters related thereto. Generally, forward-looking

information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is

expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or

variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be

taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other

factors that may cause the actual results, level of activity, performance or achievements of the Company, as the case may be,

to be materially different from those expressed or implied by such forward-looking information, including but not limited to:

receipt of necessary approvals; general business, economic, competitive, political and social uncertainties; future mineral

prices and market demand; accidents, labour disputes and shortages and other risks of the mining industry. Although the

Company has attempted to identify important factors that could cause actual results to differ materially from those contained

in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended.

There can be no assurance that such information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking

information. The Company does not undertake to update any forward-looking information, except in accordance with applicable

securities laws.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED

IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR

ACCURACY OF THIS RELEASE.

Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/92504093-0bf4-4716-bc61-77fd2c59453d

https://www.globenewswire.com/NewsRoom/AttachmentNg/1a254cce-d33f-47e2-a77e-d07b00ee6174