Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

QGR.V ·

Q-Gold Commenc es 2022 Drill Program

Exploration Programs

Q-Gold Commenc es 2022 Drill Program

TORONTO, ONTARIO – December 6, 2022

Q-Gold Resources Ltd (TSXV: QGR, OTC: QGLDF, FRA: QX9G) (“Q-Gold” or the “Company”)

is pleased to announce that it has commenced drilling an 8-hole program on its wholly owned

Mine Centre Property in Ontario, Canada (“Property”) as part of its 2022 exploration

program (the “Program”) (Fig. 1).

Rodren Drilling Ltd (“Rodren”) collared the first hole of the Program on December 1, 2022

which is designed to extend the known mineralization of the Bonanza and Jumbo veins

previously mined at the Foley mine in the early 1900’s to the north and northwest (Fig. 2).

The Program will also target coincident anomalies that were revealed by the LiDAR and MMITM

soil surveys completed this past summer (See press release of the Company dated August 9,

2022).

“We are excited to have started our 2022 drilling campaign to enlarge our knowledge of the

strike extent of the high -grade gold-bearing quartz-veins around Foley Mine ,” commented

Dr. Andreas Rompel, Chief Executive Officer, “and we are happy to have contracted Rodren

again as our drilling company, who did such a marvelous job last year with great advance

and brilliant recovery.”

Figure 1: Map with delineated intended 8 hole drilling program aiming for the extensions of

the know gold-bearing quartz veins around Foley Mine.

Figure 2: Rodren drilling has lined up the first hole aiming for the extensions of the gold -

bearing quartz-vein at Foley Mine.

About the Existing Mine Centre Property

Q-Gold holds 10,000+ acres of contiguous mining claims, Crown leases and leasehold patents

located within the historic Mine Centre 1890’s gold camp, which produced 16,025 ounces of

gold from the Foley Gold Mine and the Golden Star Mine.

The Foley Gold Mine was first developed in the 1890’s, with the sinking of the Foley Shaft to

the 400’ level. At this time 10,500 tons of ore at 14 g/t was mined from stopes at the 100’

level with 5,267 oz of gold recovered 1898 – 1900. Subsequent work between 1923 -27

included an estimated $12 M of total development work, including an offset Shaft 400’ – 850’,

winze 400’ to 150’ and 2.5+ km of drifts on 7 levels. Operations terminated in 1927 due to

the onset of the Great Depression.

The property has favourable logistics with immediate access to Highway 11 and sitting 250

km Northwest of Thunder Bay and 65 km Northeast of the U.S. border. It is also proximal to

two major gold discoveries 95 km on either side of Mine Centre: Rainy River (New Gold) (4.5

M oz. Au & 11.4 M oz. Ag) & Hammond Reef (Agnico Eagle) (4.5 M oz.).

Other interest areas on the Property include the McKenzie Gray Vein System ; a gold-silver

vein system with 6,594 m of drilling confirming existence of high-grade quartz vein down to

100 m. As well as the the Golden Star, Manhattan, and Fergus Vein Systems; all high-potential

gold vein prospects offering tremendous optionality at Mine Centre.

Qualified Persons

The scientific and technical information contained in this press release has been reviewed,

prepared and approved by Richard Kilpatrick, P. Geo., Exploration Manager, Q-Gold, who is

a “Qualified Person” as defined by NI 43-101.

About Q-Gold Resources Ltd.

Q-Gold Resources (TSXV: QGR, OTC: QGLDF, FRA: QX9G) is a publicly traded Canada-based

mineral exploration company targeting high -grade gold and silver discoveries in multiple

jurisdictions. Q-Gold is currently exploring for gold at the past-producing Foley Gold Mine in

Mine Centre, Ontario and for silver at the Surupana Property in the silver-rich altiplano region

of Peru.

For further information, contact:

Dr. Andreas Rompel

Chief Executive Officer

[email protected]

Website: www.qgoldresources.com

Cautionary Note

Certain statements in this release are forward -looking statements. Forward -looking

statements consist of statements that are not purely historical, including any statements

regarding the Program, the Company’s work plan and beliefs, plans, expectations or

intentions regarding the future. Such statements are subject to risks and uncertainties that

may cause actual results, performance or developments to differ materially from those

contained in the statements. No assurance can be given that any of the events anticipated

by the forward-looking statements will occur or, if they do occur, what benefits the Company

will obtain from them. In particular, the Company cautions that the completion of the

proposed acquisitions cannot be predicted with certainty, and that there can be no assurance

at this time that the proposed acquisitions will be completed in the manner noted above or

at all. These forward-looking statements reflect management's current views and are based

on certain expectations, estimates and assumpt ions which may prove to be incorrect. A

number of risks and uncertainties could cause our actual results to differ materially from

those expressed or implied by the forward-looking statements, as well as other factors

beyond the Company's control. The Comp any does not undertake to update any forward-

looking information, except in accordance with applicable securities laws.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS

THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHAN GE) ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.