Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

QGR.V ·

Q-Gold Announces Launch of Phase 1 Drill Program at High -Grade Foley Gold Mine Complex , Ontario The fully funded and permitted Phase 1 drill program will include over 2,700 m of drilling, targeting the well-defined high-grade gold vein system at the past-producing Foley Gold

Exploration Programs

Q-Gold Announces Launch of Phase 1

Drill Program at High -Grade Foley Gold

Mine Complex , Ontario

The fully funded and permitted Phase 1 drill program will include over 2,700 m of drilling,

targeting the well-defined high-grade gold vein system at the past-producing Foley Gold

Mine. With the drill-rig now onsite, drilling is expected to commence on April 21, 2021.

TORONTO, ONTARIO – April 20, 2021

Q-Gold Resources Ltd (TSXV:QGR, OTC:QGLDF, FRA:QX9G) (“Q-Gold” or the “Company”),

a Canada-based mineral exploration company targeting high-grade gold and silver discoveries

in multiple jurisdictions, is pleased to announce the launch of its 2021 drill program at its

wholly-owned Foley Gold Mine complex in Ontario.

Over the past two months, Q-Gold geologists have completed an extensive data compilation

and 3D Leapfrog modeling of the high-grade gold-vein system that includes over 5,900 m of

NI 43-101 compliant drilling with results of up to 53.47 g/t Au over 1.5 m and 106.7 g/t Au

over 0.23 m (refer to Q-Gold Resources press release September 30, 2020 for additional

details). This exercise has resulted in the finalization of a two-phase drill program.

Phase 1 includes a total of 2,745 m of approved holes that will infill and extend coverage to

the -200 m depth . The approved program will allow Q -Gold to infill and extend previous

drilling on the four main vein arrays at the past -producing Foley Gold Mine (see Figure 1

below). Phase 2 contains an additional 4,035 m that will add additional infill holes as well as

expand coverage laterally and down to -225 m depth.

“Our team is pleased with the results of the modeling and are excited to move ahead with

drilling on the high-grade Foley Gold Mine property,” comments Patrick Lengyel, Exploration

Manager of Q -Gold. “Further, the sizeable land position has considerable upside with its

range of drill-ready targets on multiple historic deposits as well as enormous grassroots

potential that has not been tested with modern exploration methods.

Figure 1 – Foley Mine Target - Phase 1 DDH (yellow traces)

About the Mine Centre Property

Q-Gold holds 9,965 acres of contiguous mining claims, Crown leases and leasehold patents

located within the historic Mine Centre 1890’s gold camp, which produced 16,025 ounces of

gold from the Foley Gold Mine and the Golden Star Mine.

The property has favourable logistics with direct access to Highway 11 and being located 250

km west of Thunder Bay and 65 km Northeast of the U.S. border at International Falls. It is

also proximal to two major gold discoveries 95 km on either side of Mine Centre: Rainy River

(New Gold) (4.5 M oz. Au & 11.4 M oz. Ag) & Hammond Reef (Agnico Eagle) (4.5 M oz.).

Figure 2 – Assorted Mine Centre Gold Vein Systems

Qualified Persons

The scientific and technical information contained in this press release has been reviewed,

prepared and approved by J.W. Patrick Lengyel, P. Geo., Exploration Manager, Q-Gold, who

is a "Qualified Person" as defined by NI 43-101.

About Q-Gold Resources Ltd.

Q-Gold is a publicly traded Canada-based mineral exploration company targeting high-grade

gold and silver discoveries in multiple jurisdictions. Q-Gold is currently exploring for gold at

the past-producing Foley Gold Mine in Mine Centre, Ontario and for silver at the Surupana

Property in the silver-rich altiplano region of Puno, Peru.

For further information, contact:

Evan Veryard

Chief Executive Officer

+1 416 571 9037

[email protected]

Website: www.qgoldresources.com

Cautionary Notes

Certain statements in this release are forward-looking statements. Forward-looking

statements consist of statements that are not purely historical, including any statements

regarding the Company’s work plans, the Company’s exploration plans and budgets for the

Surupana Property and the Foley Gold Mine and the Company’s beliefs, plans, expectations

or intentions regarding the future. Such statements are subject to risks and uncertainties that

may cause actual results, performance or developments to differ materially from those

contained in the statements. No assurance can be given that any of the events anticipated

by the forward-looking statements will occur or, if they do occur, what benefits the Company

will obtain from them. In particular, the company cautions that the completion of the

proposed acquisitions cannot be predicted with certainty, and that there can be no assurance

at this time that the proposed acquisitions will be completed in the manner noted above or

at all. These forward-looking statements reflect management's current views and are based

on certain expectations, estimates and assumptions which may prove to be incorrect. A

number of risks and uncertainties could cause our actual results to differ materially from

those expressed or implied by the forward-looking statements, as well as other factors

beyond the Company's control. The Company does not undertake to update any forward-

looking information, except in accordance with applicable securities laws.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS

THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.