Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PX.V ·

Pelangio Advances Multiple Exploration Programs Across Ghana

Exploration Programs

1

NEWS RELEASE

Pelangio Advances Multiple Exploration Programs Across Ghana

TORONTO, Ontario (September 18th, 2026)

Pelangio Exploration Inc. (PX:TSX -V; OTC PINK:PGXPF) (“Pelangio” or the “Company”) is pleased to

announce that exploration is advancing across its Ghana portfolio, with multiple programs now underway

or set to begin this month.

● Controlled Source Electromagnetic Survey (“CSEM”) targeting mineralization the depth of the

recently completed drill program at Manfo is now complete which included SPDD26-008 which

intercepted 26 meters at 2.99 g/t Au from 270m including 6 meters at 11.74 g/t Au

● Obuasi CSEM survey, in collaboration with neighbour, AngloGold Ashanti to commence by end of

September, evaluating exploration targets along the Obuasi Mine trend

● Diamond drilling program at Dankran about to commence, following up on encouraging results

from previous drilling by Pelangio including up to 3 meters of 14.17 g/t Au plus 2 meters of 6.0 2

g/t Au.

● Partner TuNya has begun 2,000-meter RC drilling progam to test targets on their earn-in portion

of Pelangio’s Obuasi Property.

“What is particularly encouraging is that each of these programs is aimed at answering an important

geological question,” said Ingrid Hibbard, President and CEO of Pelangio. “At Manfo, we are testing the

potential for mineralization beyond the depth reached by recent drilling. At Obuasi, we will be surveying

along a trend associated with one of the world' s premier gold districts, and at Dankran we are following

up on previous high-grade drill intercepts. Collectively, these programs represent meaningful catalysts for

advancing our understanding of the potential across our Ghana assets.”

CSEM surveys will test deeper targets at Manfo and Obuasi

SEMS Exploration Services of Ghana has been contracted to conduct CSEM surveys on Pelangio’s Obuasi

and Manfo projects to explore for mineral targets at depths up to 1 kilometre or more. Controlled source

electromagnetics is an active EM method where an electromagnetic signal is ‘injected’ into the ground

with the response measured at multiple stations in a grid array. The SEMS survey will employ an IRIS

Instruments TIP 12000 transmitter powered by a 20kVA generator to create the EM signal with the

subsurface response read by two Metronics Magneto-Telluric (MT) grade receiver units working on a 170-

meter grid node spacing. The CSEM method is effective at mapping resistive bodies and detecting

conductive features at s hallow to intermediate depths (up to several km) and should be effective at

resolving Obuasi-style mineralization (conductive sulphide ore and resistive gold -bearing quartz lodes)

plus Manfo style mineralization (resistive silicified gold zones) comfortably to a depth of 1 kilometre or

more.

Manfo CSEM Survey Completed

The recently completed Manfo survey covered the area of the Pokukrom deposits plus down -plunge

extensions to the northeast. An area of 2.8km 2 was surveyed with 100 EM stations. The intentio n of the

survey was to explore for mineralization at greater depths than the recently completed drill program. the

crew is moving to Obuasi. Refer to Figure 1.

Obuasi survey will advance exploration along the interpreted Obuasi Mine trend

The Obuasi survey will run in collaboration with neighbours AngloGold Ashanti. Pelangio’s Obuasi survey

will cover the ‘Obuasi Targets Area’ on the western edge of the property, interpreted to be on strike with

the Obuasi Mine’s Main Au Trend. See Figure 2 . The surve y will cover an area of 9.2km ² with 295 170-

meter spaced stations. AngloGold Ashanti will conduct a parallel CSEM survey extending Pelangio’s survey

6-kilometers into their mine property with 333 stations over an area of 10.4 km ². While SEMS will be

conducting both surveys, the surveys are independent of one another, although a data-sharing agreement

is being discussed. The survey contractors and 3D -inversion data processors will have the full survey

dataset, which is necessary to interpret the results and tie them to the known gold deposits at the Obuasi

Mine.

The Obuasi survey is planned to commence on Pelangio’s Obuasi property by the end of September and

proceed south into AngloGold Ashanti’s Obuasi Mine property. The entire Obuasi survey is expected to

take six to eight weeks of field time with a month or so for the data inversion and reporting.

Dankran drilling will follow up on previous high-grade gold results

Preparations are underway for a diamond drilling program on the Dankran p roperty expected to

commence by the end of September. A program of five holes totalling 650 meters has been planned to

follow up on Pelangio’s successful maiden reverse circulation (“RC’) drilling program conducted in 2021,

which returned up to 3 meters of 14.17 g/t Au plus 2 meters of 6.02 g/t Au. Previous work by Pelangio has

delineated a 2.5 -kilometer-long target along the principal Ashanti Belt volcanic -sedimentary contact 2

kilometers southwest of the Obuom Mine, a WWII -era small underground mine that produced

approximately 30Koz of gold at 15+ g/t Au from quartz lodes in a shear along the contact. Considerable

artisanal and small scale (“ASM”)mining has taken place in the district, both alluvial and underground hard

rock mining, and the Dankran property is considered prospective for a higher -grade discovery. Refer to

Figure 3.

In addition to the five planned holes, one or two additional holes totalling 150 meters will be drilled to

test one or two compelling hard rock ASM sites on the property. The Dankran drill program is expected to

take approximately six weeks or so to complete with all assays in hand anticipated by December.

3

Pelangio Exploration Inc. News Release – September 18, 2026

372 Bay Street, Suite 1800, Toronto, ON M5H 2W9 T: 905-336-3828

TuNya has begun a 2,000-metre drilling program at Obuasi

TuNya Mineral Resources, which is earning-in to the southern Tarkwaian portion of Pelangio’s Obuasi

property have just commenced an RC drilling program to test several robust Au -in-soil anomalies they

have delineated on the earn -in property. As part of TuNya’s commitment to earn 80% of thi s portion of

Pelangio’s Obuasi property TuNya are required to conduct 2,000 meters of drilling.

TuNya have been conducting detailed mapping and soil sampling on the earn-in ground for much of 2026

and have identified several promising targets scheduled for testing by RC drilling, which is now underway.

While TuNya’s focus has been on Tarkwaian geology, the new prospects appear to be more Birimian shear-

hosted in nature. The program is expected to take approximately one month and assays are a nticipated

in October. TuNya currently have several diamond drill rigs operating on their Tarkwaian Kyereboso

prospect.

Figure 1. Planned Manfo CSEM Survey Over the Pokukrom Deposits

Figure 2. District Geology and Location of Planned Obuasi CSEM Survey

The Obuasi Au trends depicted above are from AngloGold Ashanti’s Obuasi Underground Analyst Site

Visit presentation, p.10, posted on their website on March 17, 2025. The location of the Far North

(Adansi) ore shoot is estimated from p.31 of the same presentation.

Figure 3. Planned Diamond Drilling, Dankran Property

5

Pelangio Exploration Inc. News Release – September 18, 2026

372 Bay Street, Suite 1800, Toronto, ON M5H 2W9 T: 905-336-3828

Figure 4. Location of TuNya’s Soil Au Targets Planned for RC Drill Testing

Qualified Person

Mr. Kevin Thomson, P.Geo. (Ontario, #0191), Senior Vice-President, Exploration and Director, is a qualified

person within the meaning of National Instrument 43 -101 Standards of Disclosure for Mineral Projects.

Mr. Thomson approved the scientific and technical disclosure in this release.

About Pelangio Exploration Inc.:

For additio nal information, please visit our website at www.pelangio.com, or contact: Ingrid Hibbard,

President and CEO Tel: 905-336-3828 / / Email: [email protected]

Forward-Looking Statements: Certain statements herein may contain forward -looking statements and

forward-looking information within the meaning of applicable securities laws. Forward -looking

statements or information appear in a number of places and can be identified by the use of words such

as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,

“intends”, “anticipates” or “does not anticipate” or “believes” or variations of such words and phrases or

statements that certain actions, events or results “may”, “ could”, “would”, “might” or “will” be taken,

occur or be achieved. Forward -looking statements and information include statements regarding the

Company’s ability to complete proposed targeted infill drilling, step-out drilling and exploration to further

define and expand the resource base, as well as further drilling at Pokukrom East and the other deposits,

potential expansion of the Resource, potential conversion of Inferred to Indicated ounces, planned work

programs, advancing technical studies, future de velopment decisions, the potential addition of satellite

deposits, the Company’s strategy of acquiring large land packages in areas of sizeable gold mineralization,

the Company’s plans to follow-up on previous work, and the Company’s exploration plans. Wit h respect

to forward-looking statements and information contained herein, we have made numerous assumptions,

including assumptions about the state of the equity markets. Such forward -looking statements and

information are subject to risks, uncertainties an d other factors which may cause the Company’s actual

results, performance or achievements, or industry results, to be materially different from any future

results, performance or achievements expressed or implied by such forward -looking statement or

information. Such risks include the changes in equity markets, share price volatility, volatility of global and

local economic climate, inability to obtain necessary approvals or permits in Ghana, gold price volatility,

political developments in Ghana and Canada, increases in costs, exchange rate fluctuations, speculative

nature of gold exploration, including the risk that favourable exploration results may not be obtained, and

other risks involved in the gold exploration industry. See the Company’s annual and qu arterly financial

statements and management’s discussion and analysis for additional information on risks and

uncertainties relating to the forward-looking statement and information. There can be no assurance that

a forward-looking statement or information referenced herein will prove to be accurate, as actual results

and future events could differ materially from those anticipated in such statements or information. Also,

many of the factors are beyond the control of the Company. Accordingly, readers should not place undue

reliance on forward- looking statements or information. We undertake no obligation to reissue or update

any forward-looking statements or information except as required by law. All forward-looking statements

and information herein are qualified by this cautionary statement. Neither the TSX Venture Exchange nor

its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.