Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PWM.V ·

Power Metals Intersects 1.86 % Li2O over 19.0 m at Case Lake

Drill Results

Power Metals Intersects 1.86 % Li2O over 19.0

m at Case Lake

VANCOUVER, BC

,

Sept. 8, 2022

/CNW/ -

Power Metals Corp.

("

Power Metals

" or the

"

Company

") (TSXV: PWM) (FRANKFURT: OAA1) (OTCQB: PWRMF) is pleased to announce that

two drill holes have intersected high-grade Li and Ta (Lithium and Tantalum) mineralization on the

Main Dyke at the Company's 100% owned Case Lake property in

Cochrane, Ontario

.

The lithium mineralization is spodumene on the Main Dyke. Coarse-grained green spodumene and

fine-grained white spodumene occur in the inner intermediate zone of the Main Dyke with quartz and

feldspars.

Johnathan More

, Chairman & CEO of Power Metals, commented "We continue to hit impressive

numbers on our ongoing drill program. This deposit is at surface and enjoys extremely favorable

logistics relating to accessibility and already in place infrastructure. Additionally, we are awaiting on

more assays from the lab and are excited to release them when they are available."

Assay highlights on Main Dyke include (Table 1):

1.58 % Li

2

O and 143.1 ppm Ta over

15.0 m

, PWM-22-134 (Figure 1)

3.08 % Li

2

O and 74.4 ppm Ta over

1.0 m

, PWM-22-134

1.86 % Li

2

O and 130.7 ppm Ta over

19.0 m

, PWM-22-135 (Figure 2)

3.68 % Li

2

O and 84.0 ppm Ta over

1.0 m

, PWM-22-135

3.01 % Li

2

O and 546.5 ppm Ta over

2.0 m

, PWM-22-135.

Drill hole

including

From (m)

To (m)

Length (m)

Li

2

O (%)

Ta (ppm)

PWM-22-134

19.00

34.00

15.00

1.58

143.1

PWM-22-134

including

20.00

21.00

1.00

3.08

74.4

PWM-22-134

including

22.00

23.00

1.00

2.19

356.0

PWM-22-134

including

30.00

34.00

4.00

2.16

180.3

PWM-22-134

38.62

39.78

1.16

0.49

74.0

PWM-22-134

40.76

44.00

3.24

2.06

60.6

PWM-22-135

including

42.00

43.00

1.00

3.68

84.0

PWM-22-135

7.00

31.00

19.00

1.86

130.7

PWM-22-135

including

8.00

17.00

9.00

2.35

240.2

PWM-22-135

including

13.00

15.00

2.00

3.01

546.5

PWM-22-135

including

20.00

21.00

1.00

2.24

19.7

PWM-22-135

including

29.00

31.00

2.00

2.39

49.9

PWM-22-135

47.14

47.81

0.67

0.76

92.1

PWM-22-136

83.54

83.71

0.17

0.005

215.0

PWM-22-136

115.70

115.93

0.23

0.011

193.0

Table 1 Assay highlights for Main Dyke, drill holes PWM-

22-134 and 135 and exploration hole PWM-22-136.

Drill holes are oriented perpendicular to the strike length of the pegmatite, so mineralization is close

to true width.

Figure 1 Spodumene pegmatite, 26.9-53.0 m, drill hole PWM-22-134, Main Dyke, Case Lake

Property. (CNW Group/POWER METALS CORP)

Figure 2 Spodumene pegmatite, 1.31 – 23.18 m, drill hole PWM-22-135, Main Dyke, Case Lake

Property. (CNW Group/POWER METALS CORP)

Exploration drill hole PWM-22-136 is located

514 m

east of the Li-Cs-Ta West Joe Dyke along

strike. This exploration hole intersected the outermost pegmatite zones with high grade Ta

mineralization (193 and 215 ppm Ta) (Table 1). Additional drill holes will be drilled around it to try to

find the lithium mineralization which should be associated with the Ta mineralization to expand the

lithium mineralization at West Joe.

Power Metals 2022 summer drill program is for

5000 m

and over

2700 m

has been completed to

date. This press release reports assays received to date from drill hole PWM-22-134 and 135 on

the Main Dyke and exploration drill hole PWM-22-136 514 km east of West Joe Dyke. The purpose

of each drill hole on the Main Dyke was to infill on known mineralization to aid in a future resource

estimate. The purpose of the exploration hole is to expand the lithium mineralization at West Joe.

Assays pending will be released once received.

Drill hole collar coordinates are given in Table 2.

Drill Hole

Easting

(m)

Northing

(m)

Elevation

(m)

Azimuth

(°)

Dip

(°)

Length

(m)

PWM-22-134

578163.63

5431658.65

348.49

150

-45

84

PWM-22-135

578170.60

5431645.06

350.02

150

-45

63

PWM-22-136

576858.74

5431143.43

341.82

180

-45

125

Table 2 Main Dyke and exploration, Case Lake drill hole

collar coordinates. NAD 83, Zone 17. Trimble DGPS

survey with 2 cm accuracy in the horizontal.

Quality Control

The drill core was sampled so that

1 m

of the Case Batholith tonalite host rock was sampled

followed by

1 m

long samples of the pegmatite dyke and

1 m

of the Case Batholith. The sampling

followed lithology boundaries so that only one lithology unit is within a sample, except for the < 20

cm pegmatite veins in tonalite which were merged into one sample. The drill core samples were

delivered to SGS preparation lab in

Cochrane

by Power Metals' geologists. The core was prepared

at SGS Garson and analyzed at SGS

Burnaby, British Columbia

which has ISO 17025 certification.

Every 20 samples included one external quartz blank, one external lithium standard and one core

duplicate. The ore grade Li

2

O% was prepared by sodium peroxide fusion with analysis by ICP-OES

with a detection limit of 0.002 % Li

2

O. A QA/QC review of the standards and blanks for this drill

program indicate that they passed and the drill core assays are accurate and not contaminated.

Case Lake Property

Case Lake Property is located 80 km east of

Cochrane

, northeastern

Ontario

close to the

Ontario

-

Quebec

border. Case Lake Property consists of 585 cell claims in Steele, Case, Scapa,

Pliny,

Abbotsford

and Challies townships, Larder Lake Mining Division. The Property is 10 km x 9.5

km in size with 14 identified tonalite domes. The Case Lake pegmatite swarm consists of six

spodumene dykes: North, Main, South, East and Northeast Dykes on the Henry Dome and the West

Joe Dyke on a new tonalite dome. The Case Lake Property is owned 100% by Power Metals Corp.

A National Instrument 43-101 Technical Report has been prepared on Case Lake Property and filed

on

July 18, 2017

.

Qualified Person

Julie Selway

, Ph.D., P.Geo. supervised the preparation of the scientific and technical disclosure in

this news release. Dr. Selway is the VP of Exploration for Power Metals and the Qualified Person

("QP") as defined by National Instrument 43-101. Dr. Selway is supervising the exploration program

at Case Lake. Dr. Selway completed a Ph.D. on granitic pegmatites in 1999 and worked for 3 years

as a pegmatite geoscientist for the Ontario Geological Survey. Dr. Selway also has twenty-three

scientific journal articles on pegmatites.

About Power Metals Corp.

Power Metals Corp. is a diversified Canadian mining company with a mandate to explore, develop

and acquire high quality mining projects. We are committed to building an arsenal of projects in both

lithium and high-growth specialty metals and minerals. We see an unprecedented opportunity to

supply the tremendous growth of the lithium battery and clean-technology industries. Learn more at

www.powermetalscorp.com

ON BEHALF OF THE BOARD,

Johnathan More

, Chairman & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of the

content of this news release.

No securities regulatory authority has either approved or disapproved of the contents of this news

release. The securities being offered have not been, and will not be, registered under the United

States Securities Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws,

and may not be offered or sold in the

United States

, or to, or for the account or benefit of, a "U.S.

person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption

therefrom. This press release is for information purposes only and does not constitute an offer to

sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.

Cautionary Note Regarding Forward-Looking Information

This press release contains forward-looking information based on current expectations, including

the use of funds raised under the Offering. These statements should not be read as guarantees of

future performance or results. Such statements involve known and unknown risks, uncertainties

and other factors that may cause actual results, performance or achievements to be materially

different from those implied by such statements. Although such statements are based on

management's reasonable assumptions, Power Metals assumes no responsibility to update or

revise forward-looking information to reflect new events or circumstances unless required by law.

Although the Company believes that the expectations and assumptions on which the forward-

looking statements are based are reasonable, undue reliance should not be placed on the forward-

looking statements because the Company can give no assurance that they will prove to be correct.

Since forward-looking statements address future events and conditions, by their very nature they

involve inherent risks and uncertainties. These statements speak only as of the date of this press

release. Actual results could differ materially from those currently anticipated due to several

factors and risks including various risk factors discussed in the Company's disclosure documents

which can be found under the Company's profile on

www.sedar.com

.

This press release contains "forward-looking statements" within the meaning of Section 27A of the

Securities Act of 1933, as amended, and Section 21E the Securities Exchange Act of 1934, as

amended and such forward-looking statements are made pursuant to the safe harbor provisions of

the Private Securities Litigation Reform Act of 1995. The TSXV has neither reviewed nor approved

the contents of this press release.

SOURCE

POWER METALS CORP

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2022/08/c3094.html

%SEDAR: 00024408E

For further information:

Power Metals Corp., Johnathan More, 515-401-7479,

[email protected]

CO: POWER METALS CORP

CNW 08:00e 08-SEP-22