Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PWM.V ·

Power Metals Commences Drilling on Northeast Dyke at Case Lake

Exploration Programs

Power Metals Commences Drilling on Northeast Dyke at Case Lake

VANCOUVER, Jan. 10, 2018 /CNW/ - Power Metals Corp. (" Power Metals Corp. " or the " Company ")

(TSX VENTURE:PWM)(FRANKFURT:OAA1)(OTC:AOUFF) is ple ased to announce that the 2000 m drill

program on the Northeast Dyke at Case Lake east of Cochrane, Ontario has commenced. Drill hole

PWM-18-51, the first drill hole on the Northeast dyke and on the entire claim, is in progress and is

collared 5 m north of the spodumene pegmatite outcr op. This shallow hole will drill underneath the

location of the surface assay of 7.14 % Li 2O (Power Metals press release dated Dec. 4, 2017).

The Northeast Dyke is located 900 m northeast along strike of the recently completed 5400 m drill

program on the North and Main Dykes and is within the same tonalite dome as the North and Main

Dykes. Since the Northeast, North and the Main Dykes are along the same strike and within the same

dome, this indicates that they were emplaced along the same deep-seated structure. The Northeast Dyke

has a pair of parallel pegmatite dykes: north and south outcrops similar to the North and Main Dykes t hat

were recently drilled.

Dr. Selway, VP of Exploration stated, "We are excited to see the drill core from the first drill hole on the

Northeast Dyke after the recent discovery of abunda nt very coarse-grained spodumene on surface. I am

also eagerly awaiting more assays from the remaining 20 holes from the Main Dyke."

Jacob and Samuel Drilling Ltd., Sudbury, Ontario is the drill contractor.

Quality Control

The grab samples were delivered to Actlabs preparation lab in Timmins by Power Metals' geologists. The

core was crushed and pulverized in Timmins and then shipped to Actlabs analytical lab in Ancaster which

has ISO 17025 certification. The ore grade Li 2O% was prepared by sodium peroxide fusion with anal ysis

by ICP-OES with a detection limit of 0.01 % Li 2O.

Case Lake

Case Lake Property is located in Steele and Case to wnships, 80 km east of Cochrane, NE Ontario close

to the Ontario-Quebec border. The Case Lake pegmati te swarm consists of five dykes: North, Main,

South, East and Northeast Dykes. The Northeast Dyke contains very coarse-grained spodumene. Power

Metals has an 80% interest with its 20% working interest partner MGX Minerals Corp.

Qualified Person

Julie Selway, Ph.D., P.Geo. supervised the preparation of the scientific and technical disclosure in this

news release. Dr. Selway is the VP of Exploration for Power Metals and the Qualified Person ("QP") as

defined by National Instrument 43-101. Dr. Selway is supervising the exploration program at Case Lake.

Dr. Selway completed a Ph.D. on granitic pegmatites in 1999 and worked for 3 years as a pegmatite

geoscientist for the Ontario Geological Survey. Dr. Selway also has twenty-three scientific journal articles

on pegmatites. A National Instrument 43-101 report has been prepared on Case Lake Property and filed

on July 18, 2017.

About Power Metals Corp.

Power Metals Corp. is a diversified Canadian mining company with a mandate to explore, develop and

acquire high quality mining projects. We are commi tted to building an arsenal of projects in both lithium

and high-growth specialty metals and minerals, including zeolites. We see an unprecedented opportunity

to supply the tremendous growth of the lithium battery and clean-technology industries. Learn more at

www.powermetalscorp.com

ON BEHALF OF THE BOARD,

Johnathan More, Chairman & Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term

is defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Informati on

This press release contains projections and forward-looking information that involve various risks and

uncertainties regarding future events. Such forward-looking information can include without limitation

statements based on current expectations involving a number of risks and uncertainties and are not

guarantees of future performance of Power Metals. T here are numerous risks and uncertainties that could

cause actual results and Power Metals' plans and objectives to differ materially from those expressed in

the forward-looking information, including other factors beyond Power Metals' control. Actual results and

future events could differ materially from those anticipated in such information. These and all subsequent

written and oral forward-looking information are based on estimates and opinions of management on the

dates they are made and are expressly qualified in their entirety by this notice. Except as required b y law,

Power Metals assumes no obligation to update forward-looking information should circumstances or

management's estimates or opinions change.

SOURCE POWER METALS CORP

View original content with multimedia:

http://www.newswire.ca/en/releases/archive/January2 018/10/c4197.html

%SEDAR: 00024408E

For further information: Power Metals Corp., Johnathan More, 646-661-0409,

[email protected]

CO: POWER METALS CORP

CNW 06:52e 10-JAN-18