Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PURO.V ·

Thunder Bay, Ontario

Corporate Updates

Thunder Bay, Ontario TSX-V: SOP

For Immediate Release April 3, 2017

SOURCE PROVIDES UPDATE ON LAS MINAS DRILLING AND

EXPLORATION

SOURCE EXPLORATION CORP. (the “Company” or “Source”) (TSX-V: SOP) (OTCMKTS:SRXLF /

FRA:4QW1) provides an update on the diamond drilling and exploration program currently underway at

its Las Minas property, Veracruz State, Mexico.

Diamond Drilling Program Update

The Company mobilized a diamond drill at the Las Minas site in mid-February to commence a 2,800

metre drilling program at its gold, copper and silver pr oject. The program consists of infill/extension as

well as step-out drilling to expand the mineralized f ootprint of the El Dorado/Juan Bran zone. The drilling

builds on previous drilling campaigns at this high prio rity target (See press releases dated February 4,

2014, March 13, 2014 and August 29, 2014. A total of 2,290 metres in 17 holes have been completed.

Samples for 9 holes have been sent to SGS Mineral Services laboratory in Durango, Mexico for

assaying, with results expected by the middle of April.

An initial mineral resource estimate for the mine ralized zone is planned for Q2. John T. Boyd, Mining and

Geological Consultants, has been engaged to commence work on the resource estimate, with a site visit

scheduled for early April.

Brian Robertson, Chairman and CEO of Source Explor ation, commented, “We have achieved significant

progress with the drilling program due to the high proficiency of the KDL drilling crew and our geological

team and support contractors at site. This drilling program will allow us to complete an initial mineral

resource estimate as well as identify prospective targets for additional work.”

Earlier drill campaigns at the Eldorado/Juan Bran skarn zone outlined a mineralized zone measuring

over 420 metres in width and extending over 650 metres down dip, with mineralized intercepts varying

from 8 to 60 metres in thickness. The zone remains open for expansion.

Pueblo Nuevo Exploration Program Update

In addition to the drilling program, detailed geological mapping, sampling and target definition are

underway at the Pueblo Nuevo concession. The concession hosts a number of historical mines with high-

grade mineralized vein systems. The La Miqueta mine, which is located within the concession, has at

least 21 known levels. The mine is believed to have been operated sometime in the early 1900s as a

small scale high-grade mine. Underground sampling results of the vein system at the Miqueta mine in

2007 -2008 by a prior owner ranged up to 14.06 g/t gold, 24.7 g/t silver and 020% copper over 3.0

metres.

Quality Assurance/Quality Control

The exploration program has been conducted under the supervision of Mr. Sonny Bernales, P. Geo. The

Company has implemented and adheres to a strict Q uality Assurance/Quality Control program which

includes mineralized standards and blanks for each batch of samples. Samples were shipped to SGS

Mineral Services (ISO/IEC 17025) at Durango, Mexico, an accredited laboratory.

The technical information in this news release has been reviewed and approved by Sonny Bernales, P.

Geo., Source’s Exploration Director, a certified professional geologist and a qualified person for the

purposes of NI 43-101.

About Las Minas

The Las Minas Project hosts near-surface gold–silver and copper skarn mineralization and high–grade

gold-silver epithermal vein deposits. The project is comprised of six mineral concessions covering

approximately 1,616 hectares (3,995 acres), with several small high-grade, past-producing mines and

numerous untested targets.

The district is host to one of the largest under-explored gold–silver and copper skarn systems known in

Mexico, and has a production history that extends back to the Aztec era. The Las Minas granodiorite

intrusive measures approximately 10 kilometres in diameter and underlies the Las Minas concessions.

The mineralization controls and association with magnetite appear to be similar to parts of the Guerrero

Gold belt, which is the site of the Los Filos and Morelos gold deposits.

Las Minas is an early–stage exploration project and does not contain any mineral resource estimates as

defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). The

potential quantities and grades disclosed herein are conceptual in nature and there has been insufficient

exploration to define a mineral resource for the targets discussed herein. It is uncertain if further

exploration will result in these targets being delineated as a mineral resource.

About Source Exploration

Source Exploration is a Canadian based mineral exploration company committed to building long-term

value through ongoing discoveries and strategic acquisit ions of prospective precious metals deposits in

Mexico. Source is exploring the Las Minas Project, which is located in the core of the Las Minas district in

the Veracruz State, Mexico. The district is host to one of the largest under-explored skarn systems

known in Mexico and has a strong production history that dates back to the Aztec era.

For more information, please contact:

Brian Robertson, Chairman, President & CEO

Phone: 807-474-4270 or 807-251-1816

Fax: 807-474-4272

E-mail: [email protected]

Website at www.sourceexploration.com

CAUTIONARY  STATEMENT  REGARDING  FORWARD‐LOOKING  INFORMATION:  This  news  release  includes  certain  information  that  may 

constitute "forward‐looking information" under applicable Canadian securities legislation. Forward‐looking information includes, but is not 

limited to, statements about the magnitude or quality of mineral deposits, timing for the completion of the drilling program at Las Minas, 

timing for the completion of a mineral resource estimate at Las Minas, anticipated advancement of mineral properties or programs, future 

operations,  results  of  exploration,  prospects,  commodity  and  precious  metals  prices,  future  work  programs,  anticipated  financial  and 

operational  results,  capital  expenditures  and  objectives  and  the  completion  and  timing  of  mineral  resource  estimates.  Forward‐looking 

information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and 

unknown  risks,  uncertainties,  and  other  factors,  which  may  cause  the  actual  results  and  future  events  to  differ  materially  from  those 

expressed or implied by such forward‐looking information, including the risks identified in the Company's disclosure documents available at 

www.sedar.com. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ 

materially  from  those  anticipated  in  such  information.  Accordingly,  readers  should  not  place  undue  reliance  on  forward‐looking 

information. All forward‐looking information contained in this press release is given as of the date hereof and is based on the opinions and 

estimates  of  management  and  information  available  to  management  as  at  the  date  hereof.  The  Company  disclaims  any  intention  or 

obligation to update or revise any forward‐looking information, whether as a result of new information, future events or otherwise, except 

as required by law. 

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange)  

have reviewed or accepts responsibility for the accuracy or adequacy of this release.