Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PURO.V ·

Mexican GOLD to Update Las Minas 43-101 Resource Will Include 2018 High-Grade Drill Results Also Planning 3,000 Metre Drill Program

Drill Results Exploration Programs

Thunder Bay, Ont. TSX-V: MEX

For Immediate Release October 22, 2018

MEXICAN GOLD TO UPDATE LAS MINAS 43-101 RESOURCE

WILL INCLUDE 2018 HIGH-GRADE DRILL RESULTS

ALSO PLANNING 3,000 METRE DRILL PROGRAM

Mexican Gold Corp. ("Mexican Gold" or the "Company") ( TSX-V: MEX/ OTCQB:

MEXGF / FRA: 4QW1) is pleased to announce plans to update the initial Las Minas NI

43-101 resource estimate. The updated resource will include the recently discovered

high-grade mineralization found in the El Dorado Dike Contact zone as well as additional

tonnage delineated by step-out drilling at the El Dorado/Juan Bran and Santa Cruz zones.

The updated resource is scheduled for completion in Q1 2019.

The company is also planning to conduct a 3,000 metre drill program in addition to the

resource update program. The drill program will be directed at upgrading and expanding

the resource at the El Dorado/J uan Bran and Santa Cruz zones as well as testing

additional mineralized zones identified on the property by recent work. Mexican Gold will

be advancing its Las Minas Project to the pre-Feasibility stage, while continuing to explore

the multiple, other mineralized zones on the property.

Initial NI 43-101 Resource

In August 2017, the company filed an initial resource estimate on two of eight known

mineralized zones – El Dorado/Juan Bran and Santa Cruz – see press release dated

August 1, 2017. The resource, which was primarily open pit modelled, delineated 15.3

million tonnes with 304,000 gold equivalent ounces in the measured and indicated

category (5.0 million tonnes grading 1.90 grams gold – equivalent per tonne) and another

719,000 ounces gold equivalent ounces in 10.3 million inferred tonnes grading 2.17

grams gold equivalent.

Additional Drilling Expands Resource

Drilling completed since the initial NI 43 -101 resource estimate (drilling through June

2017) focussed on expansion of the resource footprint and testing nearby geophysical

targets. The 6,000-metre drill program successfully delineated the high-grade El Dorado

Dike Contact Zone. High - grade mineralization occurs on both sides of a cross cutting,

diorite dike that bisects the El Dorado/Juan Bran zone. Drilling results included 10.19

grams/tonne gold equivalent (4.51 g/t gold, 16.17 g/t silver, and 3.33 % copper over

38.0 metres. To date, the dike contact zone has been outlined along strike for over 470

metres – see press release dated March 1, 2018

Additional s tep-out drilling completed in late 2017 and in 2018 expanded the western

extension of the El Dorado/Juan Bran zone as well as the Santa Cruz zone. Step -out at

the El Dorado/Juan Bran zone intersected high-grade mineralization in hole LM -18-JB-

25, located 33 metres west of the boundary of the El Dorado/Juan Bran zone. This hole

graded 3.87 g/t Au Eq (1.36 g/t Au, 7.93 g/t Ag and 1.46% Cu) over 6.0 metres.

Additionally, hole LM-18-JB-24 cut 8.0 metres grading 1.13 g/t Au Eq (0.46 g/t Au, 2.65

g/t Ag and 0.39 % Cu) 206 metres north-west of the El Dorado zone – see press release

dated May 9. 2018.

In 2018, resource expansion drilling at the Santa Cruz zone extended the zone above the

area of previous drilling and also at depth. Drill hole LM - 18-SC-21, which tested the

upward extension of the zone, intersected multiple zones of mineralization that remain

open. Drilling to depth intersected a projected continuation of the El dorado zone located

to the east of the Santa Cruz zone.

Dr. Carl Hering, newly appointed CEO, commented, “Since joining the MEX team in Sept.

of 2018, we have been reviewing data with the objective of delineating new mineralization

both in the existing resource areas and in potential target areas for expansion. We believe

that a new and updated NI 43- 101 Resource will demonstrate significant improvement

over the initial Resource defined in August 2017, given the success of drilling since that

time.”

About Las Minas

The Las Minas Project hosts near -surface gold, silver and copper skarn mineralization

and high-grade gold-silver mesothermal vein deposits. The project is comprised of six

mineral concessions covering approximately 1,616 hectares (3,995 acres), with several

small scale, past-producing mines and historic workings.

The district is host to a large gold, silver and copper skarn system that has a production

history that extends back to the Aztec era. The Las Minas diorite intrusive measures

approximately 10 kilometres in diameter and underlies the Las Minas concessions. The

controls on mineralization and the association with magnetite appear similar to the

Guerrero Gold belt, which is the site of the Los Filos and Morelos gold deposits.

Quality Assurance/Quality Control

The technical information in this news release has been reviewed and approved by Sonny

Bernales, P. Geo., a registered Professional Geoscientist in the Province of British

Columbia and a qualified person as defined by NI 43-101. Mr. Bernales is responsible for

logistics and supervision of all exploration activity conducted by Mexican Gold on the

property.

The Company has implemented and adheres to a strict Quality Assurance/Quality Control

program which includes inserting known standards and blanks into the sample stream,

about 1 for every 10 samples. The standards and blanks were obtained from CDN

Resource Laboratories Ltd. of Langley, BC, Canada. Each sample bag is properly sealed

and kept in a secured, restricted storage place prior to shipping to the lab. Samples are

shipped directly by Mexican Gold or picked- up by the lab vehicle with chain of

custody/sample submittal signed and dated. The Company sends its samples to SGS

Mineral Services (ISO/IEC 17025) at Durango, Mexico, a n accredited and independent

laboratory.

About Mexican Gold Corp.

Mexican Gold Corp. is a Canadian based mineral exploration company committed to

building long -term value through ongoing discoveries and strategic acquisitions of

prospective precious metal s and copper deposits. Mexican Gold is exploring the Las

Minas Project, which is located in the core of the Las Minas mining district in Veracruz

State, Mexico, and is host to one of the largest under -explored skarn systems known in

Mexico. For more information, please contact.

Carl Hering, PhD Geology, CEO

Brian E. Robertson, P. Eng., President

Phone: 303-895-5241 or 807-474-4270

Fax: 807-474-4272

E-mail: [email protected]

Website at www.mexicangold.ca

CAUTIONARY STATEMENT REGARDING FORWARD -LOOKING INFORMATION: This news release includes certain information

that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information

includes, but is not limited to, statements about the magnitude or q uality of mineral deposits, anticipated advancement of

mineral properties or programs, future operations, results of exploration, prospects, commodity and precious metals prices,

future work programs, anticipated financial and operational results, capital expenditures and objectives and the completion and

timing of mineral resource estimates. Forward -looking information is necessarily based upon a number of estimates and

assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors, which

may cause the actual results and future events to differ materially from those expressed or implied by such forward -looking

information, including the risks identified in the Company's disclosure documents available at www.sedar.com. There can be no

assurance that such information will prove to be accurate, as actual results and future events could differ materially from t hose

anticipated in such information. Accordingly, readers should not place undue reliance on for ward-looking information. All

forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and

estimates of management and information available to management as at the date hereof. The Company disclaims any intention

or obligation to update or revise any forward -looking information, whether as a result of new information, future events or

otherwise, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.