Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PURO.V ·

Source Infill Drilling Cuts High-Grade Mineralization at El Dorado - Juan Bran Zone

Drill Results

Thunder Bay, Ontario TSX-V: SOP

For Immediate Release April 13, 2017

SOURCE INFILL DRILLING CUTS HIGH-GRADE MINERALIZATION AT

EL DORADO - JUAN BRAN ZONE

SOURCE EXPLORATION CORP. (the “Company” or “Source”) (TSX-V: SOP) is pleased to

announce that drilling at its Las Minas gold project has intersected long intervals of high -grade gold,

copper and silver mineralization. Diamond drilling at the El Dorado – Juan Bran zone cut 6.82 g/t Au

Eq(1) over 12.0 metres, contained within a 24.0 metre interval grading 4.43 g/t Au Eq in diamond drill hole

LM-17-ED-25. Hole LM-17-ED-28 graded 5.98 g/t Au Eq over 6.0 metres within a wider interval grading

3.48 g/t Au Eq over 36.0 metres. Hole LM -17-JB-12 graded 4.63 g/t Au Eq over a 6.0 metre interval,

contained within 14.0 metres grading 2.97 g/t Au Eq.

The objective of the drilling program, which includes infill / extension and step -out drilling, is to advance

the Las Minas project to a mineral resource estimate, scheduled for Q2. The resource estimate will focus

on the El Dorado / Juan Bran and Santa Cruz zones, two of six known mineralized zones at the property.

Drilling is continuing at the site and additional holes will be reported as soon as results are received,

compiled and evaluated.

Highlights from the initial 9 holes include:

 6.82 g/t Au Eq over 12.0 metres in LM-17-ED-25, within

 5.88 g/t Au Eq over 16.0 metres, within

 4.43 g/t Au Eq over 24.0 metres

 3.87 g/t Au Eq over 14.0 metres in LM-17-ED-26, within

 3.32 g/t Au Eq over 28.0 metres

 5.98 g/t Au Eq over 6.0 metres in LM-17-ED-28, within

 4.18 g/t Au Eq over 26.0 metres, within

 3.48 g/t Au Eq over 36.0 metres

 6.18 g/t Au Eq over 4.0 metres in LM-17-JB-12, within

 2.97 g/t Au Eq over 14.0 metres

Selected drill results are included in Table 1 below.

Eldorado - Juan Bran Zone Drill Results

Hole ID (Az./Dip)

(degrees)

From

(m)

To

(m)

Intercept

(m)

Au

(g/t)

Ag

(g/t)

Cu

%

Au Eq

(g/t)

Comments

LM-17-ED-25 (130/-67) 112.6 124.6 12.0 2.17 18.23 2.68 6.82 Infill & Extension

110.6 126.6 16.0 2.00 14.80 2.24 5.88

within 106.6 130.6 24.0 1.59 10.5 1.64 4.43

LM-17-ED-26 (62/-60) 132.9 146.9 14.0 1.26 5.31 1.54 3.87 Infill & Extension

within 118.9 146.9 28.0 1.11 3.90 1.26 3.22

within 116.9 160.9 44.0 0.86 3.11 0.93 2.43

LM-17-ED-27 (275/-60) 106.0 110.0 4.0 1.98 6.50 0.78 3.41 Infill

within 106.0 120.0 14.0 0.97 4.43 0.63 2.07

within 94.0 120.0 26.0 0.84 3.28 0.59 1.91

LM-17-ED-28(75/-75) 110.4 116.4 6.0 2.69 4.6 1.96 5.98 Infill & Extension

within 100.4 116.4 16.0 2.93 2.53 1.11 4.78

90.4 116.4 26.0 2.51 2.42 1.00 4.18

within 86.4 122.4 36.0 2.07 2.28 0.84 3.48

LM-17-ED-29(75/-45) 158.3 166.3 8.0 0.67 3.64 0.36 1.31 Extension

LM-17-JB -10 (0/-90) Intersected weakly mineralized dike Step Out

LM-17-JB-11 (90/-60) 145.0 151.0 6.0 0.65 2.53 0.34 1.25 Extension

LM-17-JB-12 (0/-85) 65.4 69.4 4.0 3.58 17.70 1.36 6.18 Infill

within 65.4 79.4 14.0 1.22 7.29 1.01 2.97

LM-17-JB-13 (135/-85) 62.4 66.4 4.00 0.86 2.15 0.81 2.21 Infill

For a map of drill collars and traces for the current release, please click here:

http://media3.marketwire.com/docs/LasMinasProject.pdf

For a photo of drill core from hole LM-17-ED-25, please click here:

http://media3.marketwire.com/docs/Pic%20LM-17-ED-25.pdf

Brian Robertson, Chairman and CEO, commented: “These initial drill results validate and extend the

mineralized footprint of the El Dorado-Juan Bran zone, outlined by earlier exploration drilling. A zone

measuring up to 430 metres in width and extending some 650 metres down dip, varying from 4 to 58

metres in thickness has been outlined. The zone remains open both on strike and down di p. The

validation and expansion of the zone by the current drilling bodes well for defining a mineral resource

estimate.”

All reported intervals referred to in this news release are core lengths and additional information is

required to determine true widths. Assays are uncut, length – weighted average values.

Gold equivalent (Au Eq) calculations use metal prices of US $1,250/oz. for gold, US $18.00/oz. for silver and US

$3.00/lb. for copper. No adjustments have been made for potential relative differences in metal recoveries.

Au Eq g/t = Au g/t + [(Ag g/t x 0.014) + (Cu% x 1.64)]

About Las Minas

The Las Minas Project hosts near -surface gold – silver and copper skarn mineralization and high –grade

gold - silver epithermal vein deposits. The project is comprised of six mineral concessions covering

approximately 1,616 hectares (3,995 acres), with seve ral small scale, past -producing mines and a

number of untested targets.

The district is host to one of the largest under explored gold – silver copper skarn systems known in

Mexico, and has a production history that extends back to the Aztec era. The Las Minas granodiorite

intrusive measures approximately 10 kilometres in diameter and underlies the Las Minas concessions.

The mineralization controls and association with magnetite appear to be similar to the Guerrero Gold

belt, which is the site of the Los Filos and Morelos gold deposits.

Las Minas is an early–stage exploration project and does not contain any mineral resource estimates as

defined by National Instrument 43 -101 Standards of Disclosure for Mineral Projects (“NI 43-101”). The

potential quantities and grades disclosed herein are conceptual in nature and there has been insufficient

exploration to define a mineral resource for the targets discussed herein. It is uncertain if further

exploration will result in these targets being delineated as a mineral resource.

Quality Assurance/Quality Control

The technical information in this news release has been reviewed and approved by Sonny

Bernales, P. Geo., a registered Professional Geoscientist in the Province of British Columbia and a

qualified person as defined by NI 43-101. Mr. Bernales is responsible for logistics and supervision of all

exploration activity conducted by Source on the property.

The Company has implemented and adheres to a strict Quality Assurance/Quality Control program which

includes inserting mineralized standards and blanks into the sample stream, about 1 for every 10

samples. The standards and blanks were obtained from CDN Resource Laboratories Ltd. of Langley, BC,

Canada. Each sample bag is properly sealed and kept in a secured, restricted storage place prior to

shipping to the lab. Samples are shipped directly by Source or picked up by the lab vehicle with chain of

custody/sample submittal signed and dated . The Company sends its samples to SGS Mineral Services

(ISO/IEC 17025) at Durango, Mexico, an accredited and independent laboratory.

About Source Exploration

Source Exploration is a Canadian based mineral exploration company committed to building long -term

value through ongoing discoveries and strategic acquisitions of prospec tive precious metals deposits in

Mexico. Source is exploring the Las Minas Project, which is located in the core of the Las Minas district in

the Veracruz State, Mexico. The district is host to one of the largest under -explored skarn systems

known in Mexico and has a strong production history that dates back to the Aztec era.

For more information, please contact:

Brian Robertson, Chairman, President & CEO

Phone: 807-474-4271or 807-251-1816

Fax: 807-474-4272

E-mail: [email protected]

Website at www.sourceexploration.com

CAUTIONARY STATEMENT REGARDING FORWARD -LOOKING INFORMATION : This news release includes certain information that may

constitute "forward-looking information" under applicable Canadian securities legislation. Forward -looking information includes, but is not

limited to, statements about the magnitude or quality of mineral deposits, timing of the mineral resource estimate at the Las Minas Project,

anticipated advancement of mineral properties or programs, future operations, results of exploration, prospects, commodity and precious

metals prices, future work programs, anticipated financial and operational results, capital expenditures and objectives an d the completion

and timing of mineral resource estimates. Forward -looking information is necessarily based upon a number of estimates and assumptions

that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other facto rs, which may cause the actual

results and future events to differ materially from those expressed or implied by such forward -looking information, including the risks

identified in the Company's disclosure documents available at www.sedar.com. There can be no assurance that such information will prove

to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accor dingly, readers

should not place undue reliance on forward -looking information. All forward-looking information contained in this press release is given as

of the date hereof and is based on the opinions and estimates of management and information available to management as at the date

hereof. The Company disclaims any intention or obliga tion to update or revise any forward -looking information, whether as a result of new

information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange)

have reviewed or accepts responsibility for the accuracy or adequacy of this release.