Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PURO.V ·

Mexican GOLD Step-Out Drilling Extends El Dorado/ Juan Bran Zone Mineralization 206 Metres to the North-WEST at Las Minas

Drill Results

Thunder Bay, Ont. TSX-V: MEX

For Immediate Release MAY 9, 2018

MEXICAN GOLD STEP-OUT DRILLING EXTENDS EL DORADO/ JUAN BRAN

ZONE MINERALIZATION 206 METRES TO THE NORTH-WEST AT LAS MINAS

Mexican Gold Corp. (the “Company” or “Mexican Gold”) (TSX-V: MEX / OTCMKTS: MEXGF / FRA:

4QW1) is pleased to announce additional positive drill results for recently completed step-out drilling at

the El Dorado/Juan Bran and Santa Cruz zones. Step -out hole LM-18-JB-25 intersected high – grade

mineralization grading 3.87 g/t Au Eq (1.36 g/t Au, 7.93 g/t Ag, 1.46 % Cu over 6.0 metres. The miner-

alized zone was intersected 33.0 metres west of the boundary of the El Dorado/ Juan Bran zone

outlined by the initial 43-101 Resource Estimate of August 1, 2018. Additionally, hole LM -18 JB- 24 inter-

sected 1.13 g/t Au Eq (0.46 g/t Au, 2.65 g/t Ag, 0.39 % Cu) 206 metres north -west of the El Dorado/

Juan Bran zone.

Infill drilling at the El Dorado/ Juan Bran continued to support the continuity of mineralization. And drilling

at the Santa Cruz zone extended the zone to depth as well as cutting multiple mineralized intervals in the

upward extension of zone.

Highlights of drilling at El Dorado/ Juan Bran and Santa Cruz zones include:

Diamond drill hole LM -18-JB-25

Au

• 3.87 g/t Au Eq (1.36 g/t Au, 7.93 g/t Ag, 1.46% Cu) over 6.0 metres

within 3.05 g/t Au Eq (1.06 g/t Au, 6.35 g/t Ag, 1.16% Cu) over 8.0 metres

Diamond drill hole LM-18-ED- 53

• 4.87 g/t Au Eq (2.52 g/t Au, 10.23 g/t Ag, 1.35 % Cu) over 6.0 metres

Diamond drill hole LM-18-ED-54.

• 3.49 g/t Au Eq (2.07 g/t Au, 3.10 g/t Ag, 0.84% Cu) over 2.0 metres

Diamond drill hole LM-18-SC-6A

• 3.49 g/t Au Eq (2.07 g/t Au, 3.10 g/t Ag, 0.84 Cu) over 2.0 metres

within 1.41 g/t Au Eq (0.76 g/t Au, 1.31 g/t Ag 0.39% Cu) over 8.00 metres

Diamond drill hole LM-18-SC-17A

• 3.58 g/t Au Eq (3.49 g/t Au, 0.55 g/t Ag, 0.05% Cu) over 6.0 metres

within 2.01 g/t Au Eq (1.96 g/t Au, 0.32 g/t Ag, 0.03% Cu) over 14.0 metres

Diamond drill hole LM-18-SC-21

• 2.48 g/t Au Eq (1.42 g/t Au, 9.9 g/t Ag, 0.56% Cu over 2.0 metres

• 1.95 g/t Au Eq (0.99 g/t Au, 5.03 g/t Ag, 0.54 % Cu) over 6.0 metres

including 2.51 g/t Au Eq (1.22 g/t Au, 6.25 g/t Ag, 0.74% Cu over 4.0 metres

• 1.79 g/t Au Eq (0.78 g/t Au, 3.25 g/t Ag, 0.59 % Cu over 4.0 metres

True widths for the El Dorado/ Juan Bran zones are approximately 85% of core widths.

KEY POINTS :

• LM-18-JB-25 was drilled to test the western extension of the El Dorado/Juan Bran zone. The hole

cut eight metres of high- grade mineralization 33.0 metres west of the El Dorado zone boundary .

The mineralization remains open for further expansion to the west. Step-out hole LM-18- ED- 24

intersected 8.0 metres of mineralization located 206.0 metres north -west of the El Dorado zone

boundary.

• LM-18-ED-53 &54 were drilled as in-fill holes to support the continuity and grade of mineralization

for the El Dorado/ Juan Bran zone. Both holes intersected mineralization with grades similar to

previous drilling.

• LM- 18-SC-6A & 17A were drilled to test the continuation of the Santa Cruz mineralization to depth.

Both holes intersected an additional 8 metres of mineralization below the limits of previous drilling

• LM-18-SC-21 was drilled to test the upward extension of the Santa Cruz zone. The hole cut multiple

zones on mineralization that remain open for additional drill testing.

• True widths of the El Dorado./ Juan Bran and Santa

Selected drill results are included in Table 1 Summary Drill Results

For a map of drill collars and traces for the drilling see Figure 1. Plan View of Diamond Drill Hole Collars

and Traces.

Brian Robertson, President and CEO commented, “We are very pleased with the results of the drill pro-

gram which focused on resource expansion and confirmation of grade continuity. Step -out drilling at the

El Dorado/ Juan Ban and Santa Cruz zones continues to expand the boundaries of the maiden resource,

both along strike and to depth. The infill drilling continues to support the consistency of the grade distribu-

tion within the deposit These results are very positive for a significant increase in the maiden resource.”

Table 1 Summary Drill Results

Hole ID (Az./Dip)

(degrees)

From

(m)

To

(m)

Intercept

(m) (1)

Au

(g/t)

Ag

(g/t)

Cu

%

Au

Eq

(g/t)

EL DORADO/JUAN BRAN ZONE

LM-18-JB-25 (245, -75) 129.5 135.5 6.00 1.36 7.93 1.46 3.87

within 129.5 137.5 8.00 1.06 6.35 1.16 3.05

LM-18 -JB-24 (240, -55) 66.9 74.9 8.00 0.46 2.65 0.39 1.13

(1) All intervals are core widths measured along the axis of the core . True widths vary and are calculated

to average approximately 85% of intersection widths.

(2) Assays are uncut, length – weighted average values.

Gold equivalent (Au Eq) calculations use metal prices of US $1250/oz. for gold, US $18.00/oz. for silver and US

$3.00 /lb. for copper. No adjustments have been made for potential relative differences in metal recoveries.

Au Eq g/t = Au g/t + [(Ag g/t x 0.014) + (Cu% x 1.64)]

LM-18-ED-53 (93, -68) 101.7 107.7 6.00 2.51 10.23 1.35 4.87

LM-18-ED-54 (100, -55) 176.0 186.0 10.0 2.12 3.58 0.59 3.14

within 164.0 188.0 24.0 1.24 2.70 0.47 2.05

SANTA CRUZ ZONE

LM-18-SC-6A (60, -45) 238.0 240.0 2.00 2.07 3.10 0.84 3.49

within 238.0 246.0 8.00 0.76 1.31 0.39 1.41

LM-18-SC-17A (70, -45) 165.5 171.5 6.00 1.51 5.50 0.93 3.10

Within 165.5 186.5 8.00 1.26 4.40 0.73 2.51

LM-18-SC-21 (60, -45) 1.0 3.0 2.0 1.42 9.9 0.56 2.48

and 68.0 70.0 2.00 1.13 1.40 0.61 2.15

within 68.0 72.0 4.00 0.79 1.30 0.42 1.49

and 90.0 94.0 4.00 0.78 3.25 0.59 1.79

within 90.0 96.0 6.00 0.60 2.70 0.48 1.43

and 217.0 221.0 4.00 0.58 1.45 0.48 1.38

and 266.2 270.2 4.00 1.22 6.25 0.74 2.51

within 264.2 270.2 6.00 0.99 5.03 0.54 1.95

Figure 1. Plan View of Diamond Drill Hole Collars and Traces.

Quality Assurance/Quality Control

The technical information in this news release has been reviewed and approved by Sonny Ber-

nales, P. Geo., a registered Professional Geoscientist in the Province of British Columbia and a qualified

person as defined by NI 43-101. Mr. Bernales is responsible for logistics and supervision of all exploration

activity conducted by Mexican Gold on the property.

The Company has implemented and adheres to a strict Quality Assurance/Quality Control program which

includes inserting mineralized standards and blanks into the sample stream, about 1 for every 10 samples.

The standards and blanks were obtained from CDN Resource Laboratories Ltd. of Langley, BC, Canada.

Each sample bag is properly sealed and kept in a secured, restricted storage place prior to shipping to the

lab. Samples are shipped directly by Mexican Gold or picked -up by the lab vehicle with chain of cus-

tody/sample submittal signed and dated. The Company sends its samples to SGS Mineral Services

(ISO/IEC 17025) at Durango, Mexico, an accredited and independent laboratory.

About Las Minas

The Las Minas Project hosts near - surface gold - silver and copper skarn mineralization and high - grade

gold - silver epithermal vein deposits. The project is comprised of six mineral concessions covering ap-

proximately 1,616 hectares (3,995 acres), with several small scale, past - producing mines and a number

of untested targets.

The district is host to a large gold, silver and copper skarn system that has a production history that extends

back to the Aztec era. The Las Minas diorite intrusive measures approximately 10 kilometres in diameter

and underlies the Las Minas concessions. The mineralization controls and association with magnetite ap-

pear to be similar to the Guerrero Gold belt, which is the site of the Los Filos and Morelos gold deposits.

Information Regarding NI-43-101 Initial Mineral Resource Estimate

In 2017, the Company reported an initial mineral resource estimate of 304,000 gold equivalent ounces

(Au Eq ozs) contained within 4,970,000 tonnes grading 1.90 g/t Au Eq (0.92 g/t Au, 0.59% Cu. 4.37 g/t Ag)

in a Measured and Indicated category for the Eldorado/ Juan Bran and Santa Cruz zones , with an addi-

tional Inferred Resource of 719,000 Au Eq ozs contained within 10,304,000 tonnes grading 2.17 g/t Au

Eq.( 1.08 g/t Au, 0.66 % Cu, 3.99 g/t Ag) (reported in the Company’s news release dated August 1, 2017,

and the 43-101 report titled “NI 43 - 101 Technical Report Mineral Resource Estimate Las Minas – Gold –

Copper project," John T, Boyd Company, Mining and Geological Consultants, Denver, Colorado, USA,

Report No “3830.001“ dated September, 2017, prepared by John J. Read, P. Geo., Q .P. and Sam J.

Shoemaker Jr., Registered Member S.M.E, Q.P.) The report is available on SEDAR.

The El Dorado / Juan Bran and Santa Cruz zones remain open for expansion and comprise two of eight

known mineralized zones at the Las Minas property.

About Mexican Gold Corp.

Mexican Gold Corp. is a Canadian based mineral exploration company committed to building long -term

value through ongoing discoveries and strategic acquisitions of prospective precious metals deposits in

Mexico. Mexican Gold is exploring the Las Minas Project, which is located at the core of the Las Minas

district in the Veracruz State, Mexico. The district is host to one of the largest under-explored skarn systems

known in Mexico.

For more information, please contact:

Brian Robertson, President & CEO

Phone: 807-474-4270 or 807-251-1816

Fax: 807-474-4272

E-mail: [email protected]

Website at www.mexicangold.ca

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain information that may con-

stitute "forward-looking information" under applicable Canadian securities legislation. Forward -looking information includes, but is not lim-

ited to, statements about the magnitude or quality of mineral depos its, anticipated advancement of mineral properties or programs, future

operations, results of exploration, prospects, commodity and precious metals prices, future work programs, anticipated financial and opera-

tional results, capital expenditures and objectives and the completion and timing of mineral resource estimates. Forward-looking information

is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and u nknown

risks, uncertainties, and othe r factors, which may cause the actual results and future events to differ materially from those expressed or

implied by such forward- looking information, including the risks identified in the Company's disclosure documents available at

www.sedar.com. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information.

All forward-looking information contained in this press release is given as of the date hereof and is based on the opinions and estimates of

management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update

or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.