Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PUR.V ·

Premier American Uranium Reports Positive Drill Results from the Cyclone ISR Project, Wyoming

Drill Results

Premier American Uranium Reports Positive Drill Results from the Cyclone ISR

Project, Wyoming

TORONTO, July 29, 2025 -- Premier American Uranium Inc. (“PUR”, the “Company” or “Premier American

Uranium”) (TSXV: PUR) (OTCQB: PAUIF) is pleased to announce positive drill results from the ongoing exploration drilling

program on the Cyclone Rim target at the Company’s wholly-owned Cyclone ISR Uranium Project (“Cyclone” or the

“Project”), located in the Great Divide Basin of south-central Wyoming. The exploration program commenced on July 16,

2025, with the objective of further defining sandstone-hosted uranium mineralization that was partially outlined during the

Company’s 2024 exploration program. The Project is situated in the vicinity of Ur-Energy Inc.’s Lost Creek ISR uranium mine

and other former uranium production facilities (Figure 1).

Highlights

• Positive drill results include mineralized zones encountered in areas where uranium mineralization was not previously

known to occur, and extensions of known mineralization along a previously identified geologic trend. Fourteen of 25

planned conventional (“mud”) rotary holes have been completed thus far, for a total of 10,600 ft of drilling in 2025 (Figure

1).

• Eight of the 14 drill holes completed to date intersected uranium mineralization at grades of 0.01% eU ₃O₈ or higher (see

Table 1 for complete results). Notably, hole CR25-001 returned 15.5 ft grading 0.09% eU ₃O₈. Within the overall

mineralized zone is a three-foot thick zone that averages 0.229% eU3O8.

• Drilling at the Cyclone Rim target in 2024 identified flat lying uranium mineralization along a ½-mile, east-west trend.

The 2025 drilling program has extended that mineralized trend and has identified a potential second trend of uranium

mineralization running north-south over a 1.5-mile distance. Both mineralized zones remain open in multiple directions

and are expected to be a continued focus of the 2025 drill campaign.

Colin Healey, CEO of PUR commented, “We are encouraged by the strong results emerging from drilling at Cyclone Rim. With

each phase, our understanding of the mineralized system improves, and we remain focused on expanding known zones of

mineralization while also uncovering new areas of potential mineralization. As results continue to come in throughout the

summer, we are actively evaluating the opportunity to expand the scope of the 2025 program to include additional drilling. I

congratulate our technical team on the strong execution in the field thus far.”

   Table 1: 2025 Cyclone Rim Drill Results

Hole Intercept From To Length eU308%

CR25-001 intersected 202 217.5 15.5 0.09

  including     14 0.097

  including     13.5 0.1

CR25-002 intersected 346 355 9 0.019

  including     4 0.027

  including     1.5 0.034

CR25-004 intersected 557 557.5 0.5 0.011

CR25-005a intersected 195.5 196.5 1 0.011

  and 203 208 5 0.018

  including     1.5 0.029

  and 216.5 225 8.5 0.027

  including     2.5 0.058

  including     1.5 0.075

  and 237 238.5 1.5 0.011

CR25-009 intersected 396.5 398 1.5 0.011

CR25-010 intersected 377.5 379.5 2 0.015

CR25-015 intersected 367.5 368.5 1 0.012

CR25-014 intersected 346 355 9 0.028

  including     7.5 0.03

All grades were calculated from gamma-ray logs measured by Hawkins CBM Logging of Cody, Wyoming, a highly

experienced and skilled independent borehole geophysical contractor. Hawkins CBM Logging’s geophysical probe was most

recently calibrated at the US Department of Energy’s Casper, Wyoming logging test pits in June 2025. Uranium grades cited

were calculated from gamma-ray logs, and the cited grades are “equivalent” (“e”) grades of U3O8. All drill holes are vertical in

orientation and the geologic units hosting the uranium mineralization are flat lying, therefore reported thicknesses are true

thicknesses. No corrections were made for radiometric disequilibrium.

Figure 1: 2025 Cyclone Rim Target Area Drill Hole Location Map

Cyclone Project

The Project is situated in the Wyoming Basin physiographic province, in south-central Wyoming and within the Great Divide

Basin (Figure 2). Uranium mineralization occurs in the Tertiary age Battle Spring Formation as sandstone-hosted roll-fronts.

PUR’s mineral holdings include 1,161 unpatented mining claims and 9 State leases. In total, the Project comprises

approximately 26,180 acres. Portions of the Project area were explored by various companies beginning in the 1950’s. 

Wyoming has led the US in uranium production since 1995, and since the first uranium mines started operating in 1951, the

state has produced more than 238 million pounds of uranium concentrate. Wyoming hosts the largest known economic

uranium ore reserves in the US, which are in the Powder River Basin, Great Divide Basin, Shirley Basin, and Gas Hills (Wind

River Basin).1

Figure 2: Location of the Cyclone Project, Great Divide Basin, Wyoming

Qualified Person Statement

The scientific and technical information contained in this news release was reviewed and approved by Dean T. Wilton, PG,

CPG, MAIG, a consultant of PUR who is a “Qualified Person” (as defined in National Instrument 43-101 - Standards of

Disclosure for Mineral Projects). Mr. Wilton has verified the data disclosed in this news release, including sampling, analytical,

and test data underlying the information contained herein.

The drilling results cited in this release were derived from conventional mud rotary drill holes and continuously recorded

geophysical responses (gamma-ray, self-potential, and single point resistivity) from a borehole geophysical probe. The

mineralized zones are flat lying and the individual drill holes are vertical in orientation, and the thicknesses cited in this release

are true thicknesses. Grades of mineralization reported were calculated from the gamma-ray logs following a procedure that

was first developed in the early 1960s and is standard practice in the uranium industry. The borehole geophysical logging was

carried out by Hawkins CBM Logging of Cody Wyoming, an independent geophysical contractor that is highly experienced and

skilled in providing reliable and accurate data. The gamma-ray probe and instrumentation were most recently calibrated at the

US Department of Energy's gamma-ray test pits in Casper, Wyoming in June 2025.

Other information regarding the Company’s Cyclone Project can be referenced from the “Technical Report on the Cyclone

Uranium Project, Great Divide Basin, Wyoming USA, dated June 30, 2023, and it is available under the Company’s profile on

SEDAR +, at www.sedarplus.ca.

About Premier American Uranium Inc.

Premier American Uranium is focused on the consolidation, exploration, and development of uranium projects in the United

States, aiming to strengthen domestic energy security and support the transition to clean energy. One of PUR’s key strengths

is the extensive land holdings in three prominent uranium-producing regions in the United States: the Grants Mineral Belt of

New Mexico, the Great Divide Basin of Wyoming and the Uravan Mineral Belt of Colorado.

With current resources and defined resource exploration targets, PUR is actively advancing its portfolio through work

programs. PUR benefits from strong partnerships, with backing from Sachem Cove Partners, IsoEnergy Ltd., Mega Uranium

Ltd., and other institutional investors. The Company’s distinguished team had extensive experience in uranium exploration,

development, permitting, and operations, as well as uranium-focused mergers and acquisitions—positioning PUR as a key

player in advancing the U.S. uranium sector.

For More Information, Please Contact:

Premier American Uranium Inc.

Colin Healey, CEO

[email protected]

Toll-Free: 1-833-223-4673

Twitter: @PremierAUranium

www.premierur.com

Neither TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Statement Regarding Forward-Looking Information

This news release contains “forward-looking information” within the meaning of applicable Canadian securities laws. Forward-

looking information includes, but is not limited to, statements with respect to, planned exploration activities, the anticipated

results thereof and the anticipating timing for reporting of such results; future prospects for exploration; the potential for

mineral resource identification at the Project; expectations regarding the resurgence of nuclear power in the US; and other

activities, events or developments that are expected, anticipated or may occur in the future. Generally, but not always, forward-

looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”,

“scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of

such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”,

“occur” or “be achieved” or the negative connotation thereof.

Forward-looking information and statements are based on our current expectations, beliefs, assumptions, estimates and

forecasts about PUR’s business and the industry and markets in which it operates. Such forward-information and statements

are based on numerous assumptions, including among others, that the results of planned exploration activities are as

anticipated, the price of uranium, the anticipated cost of planned exploration activities, the completion, timing and results of

planned exploration activities being consistent with expectations, the anticipated mineralization being consistent with

expectations, that general business and economic conditions will not change in a material adverse manner, that financing will

be available if and when needed and on reasonable terms, that third party contractors, equipment and supplies and

governmental and other approvals required to conduct the Company’s planned exploration activities will be available on

reasonable terms and in a timely manner. Although the assumptions made by PUR in providing forward-looking information or

making forward-looking statements are considered reasonable by management at the time, there can be no assurance that

such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which

may cause actual results, performances and achievements of Premier American Uranium to differ materially from any

projections of results, performances and achievements of Premier American Uranium expressed or implied by such forward-

looking information or statements, including, among others: limited operating history, negative operating cash flow and

dependence on third party financing, uncertainty of additional financing, delays or failure to obtain required permits and

regulatory approvals, changes in mineral resources, no known mineral reserves, aboriginal title and consultation issues,

reliance on key management and other personnel; potential downturns in economic conditions; availability of third party

contractors; availability of equipment and supplies; failure of equipment to operate as anticipated; accidents, effects of

weather and other natural phenomena and other risks associated with the mineral exploration industry; changes in laws and

regulation, competition, and uninsurable risks and the risk factors with respect to Premier American Uranium set out in PUR’s

annual information form for the year ended December 31, 2024 and the other documents of PUR filed with the Canadian

securities regulators and available under PUR’s profile on SEDAR+ at www.sedarplus.ca.

Although PUR has attempted to identify important factors that could cause actual actions, events or results to differ materially

from those contained in the forward-looking information or implied by forward-looking information, there may be other factors

that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking

information and statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or

information. PUR undertakes no obligation to update or reissue forward-looking information as a result of new information or

events except as required by applicable securities laws.

1 Uranium resources summary of 2023 (wyo.gov)

Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/35355d18-1b96-4134-bd51-499f79b89a76

https://www.globenewswire.com/NewsRoom/AttachmentNg/6176be7f-1fdc-42dd-be9f-69a0bdffc768