TORONTO, January 20, 202 6 — Premier American Uranium Inc. (“PUR”, the “Company” or “Premier American
Uranium”) (TSXV: PUR) (OTCQB: PAUIF) is pleased to announce drill results from the 2025 drilling program at the
Company’s wholly-owned Kaycee ISR Uranium Project (“Kaycee” or the “Project”) located in the prolific Powder River
Basin (“PRB”) of northeastern Wyoming. The 2025 drilling campaign successfully advanced multiple targets, expanding
areas of known uranium mineralization in the Outpost, Rustler, and Stampede exploration areas, each associated with
major redox-controlled roll-front systems within the PRB. The Project is situated in the vicinity of several past and
presently producing ISR uranium operations, including Energy Fuels Inc.’s Nichols Ranch and Uranium Energy Corp .’s
Christensen Ranch ISR operations (Figure 1).
Highlights
• Drilling completed in 2025 includes 132 drillholes for a total of 100,107 ft.
• Follow-up drilling in the Outpost target area (Figure 2) during 2025 has confirmed the presence of a
newly defined uranium -bearing roll front system within Fort Union Formation channel sands. The
discovery builds upon positive drilling results from the Company’s late -2024 drilling program. Careful
and astute field observations by the Company’s geologists resulted in the recognition of remnant
uranium mineralization in up-dip exposures along the Pine Ridge escarpment and its relationship to more
robust mineralization down-dip, at the Outpost target area with the following results:
o Eleven of the 23 holes encountered uranium mineralization.
o Eight of the 11 mineralized holes encountered grades of 0.02% eU₃O₈ or greater with a thickness
of at least 2 ft (Table 1), including 3.5 ft of 0.27% eU₃O₈ in drillhole LT25-065 and 5.5 ft of 0.125%
eU₃O₈ in drillhole LT25-069.
• Drilling in the Rustler area further defined a previously identified north-south trending redox-front with
associated uranium mineralization hosted in Wasatch Formation channel sands. This 3.5 -mile corridor
represents one of the most laterally continuous redox interfaces in the project area, with the following
results:
o Twenty-two of the total 81 holes drilled in the Rustler area in 2025 encountered uranium
mineralization.
o Fifteen of the 22 mineralized holes encountered grades of 0.02% eU₃O₈ or greater with a
thickness of at least 2 ft (Table 1), including 8.5 ft of 0.083% eU₃O₈ in drillhole RT25-042 and 4 ft
of 0.09% eU₃O₈ in drillhole RT25-064. The mineralized holes confirm the continuity of previously
identified mineralization and are believed to demonstrate favourable host-sand characteristics
and geologic characteristics similar to the nearby Nichols Ranch ISR uranium project of Energy
Fuels Inc. less than five miles to the east.
• Mineralized intercepts encountered in the Stampede area during 2025 drilling (Table 1) demonstrate
continuity of the Wasatch-hosted redox trend between Stampede and Rustler, indicating that uranium
mineralization extends along a broad north–south corridor. This finding strengthens the regional model
for roll-front development and supports ongoing exploration targeting underexplored segments of the
redox trend.
Colin Healey, CEO of PUR commented, “We are highly encouraged with the results of the 2025 drilling program at
Kaycee, which validated our thesis that the Project offers resource potential in a top U.S. uranium producing
jurisdiction. The program delivered a substantial number of holes with grades and thicknesses exceeding those
typically necessary for incorporation into a mineral resource estimate, which we believe is very positive and bodes well
for our 2026 exploration plans at Kaycee which are in the final planning stages. Goals for 2026 at include aggressive
follow-up on newly identified and known mineralized areas to determine resource potential and formally confirming
historical resources at the Project, while also testing high-priority targets born from recent drill work. PUR continues
to establish a track record of successful consolidation of quality projects and rapidly demonstrating further value in
the expanding portfolio. I congratulate our growing team on our successes portfolio wide.”
Table 1. 2025 Kaycee Significant Intercepts
Hole Intercept From (ft) To (ft) Length (ft) eU₃O₈%
LT25-051
intersected 793.5 796 2.5 0.072
including 1.5 0.095
including 1 0.111
LT25-059 intersected 610 616.5 6.5 0.063
including 4.5 0.078
LT25-065
intersected 798.5 802 3.5 0.27
including 2.5 0.365
including 2 0.438
LT25-066
intersected 783.5 786.5 3 0.065
including 1.5 0.095
including 0.5 0.115
LT25-068
intersected 806 810 4 0.084
including 3 0.099
including 1 0.109
LT25-069
intersected 782.5 785.5 3 0.33
and 799.5 805 5.5 0.125
including 4 0.159
including 2 0.259
LT25-070 intersected 789 791 2 0.039
including 0.5 0.053
LT25-071 intersected 789.5 793 3.5 0.037
including 0.5 0.06
RT25-018 intersected 137 139.5 2.5 0.045
including 1 0.062
RT25-028
intersected 527.5 531.5 4 0.053
including 2 0.073
and 537.5 540 2.5 0.034
RT25-042
intersected 440 448.5 8.5 0.083
including 7.5 0.09
including 2 0.117
RT25-047 intersected 419.5 421.5 2 0.046
including 1 0.061
RT25-049 intersected 695.5 697.5 2 0.33
RT25-053 intersected 702 704 2 0.028
RT25-058
intersected 364 369 5 0.061
including 2 0.07
including 1.5 0.073
and 675.5 678 2.5 0.041
including 1 0.051
RT25-060 intersected 425 428.5 3.5 0.056
including 2 0.074
RT25-062 intersected 456 458.5 2.5 0.03
RT25-064
intersected 409 413 4 0.09
including 2.5 0.127
including 2 0.145
RT25-065 intersected 644 647 3 0.027
RT25-072 intersected 563.5 568 4.5 0.027
RT25-073 intersected 560.5 563 2.5 0.027
RT25-075 intersected 525 527.5 2.5 0.077
RT25-078 intersected 513 515.5 2.5 0.032
SP25-012 intersected 742 744 2 0.063
including 1 0.084
SP25-016 intersected 733.5 736.5 3 0.025
Notes: Drill holes reported here encountered uranium mineralization with >2 -ft thickness at or above a cut -off grade of 0.02%
eU₃O₈.All grades were calculated from gamma-ray logs measured by Century Geophysics of Tulsa Oklahoma, which is independent
of the Company. The geophysical results are based on equivalent uranium (eU 3O8) of the gamma-ray probes which are calibrated
at the Department of Energy’s test facility in Casper, Wyoming. Uranium grades cited are calculated from gamma-ray logs, and the
cited grades are “equivalent” (“e”) grades of U₃O₈ %. eU₃O₈ is a measure of gamma intensity from a decay product of uranium
and is not a direct measurement of uranium. No corrections were made for radiometric disequilibrium. Numerous comparisons of
eU₃O₈ and chemical assays of PRB core samples indicate that eU₃O₈ is a reasonable indicator of the actual uranium assay. All drill
holes are vertical in orientation and the geologic units hosting the uranium mineralization are generally very flat lying, th erefore
reported thicknesses represent true thicknesses.
Figure 1. Kaycee Project Location, Wyoming
Figure 2. Kaycee Project Key Targets Drilled in 2025
Kaycee Project
The Kaycee Project in Wyoming's Powder River Basin consists of over 42 square miles of mineral rights over a 36-mile
mineralized trend hosting more than 110 miles of identified roll fronts (Figure 3). The Project is believed to be the only
project in the PRB where all three known historically productive sandstone formations (Wasatch, Fort Union, and Lance)
are mineralized and potentially accessible for ISR extraction. The Project represents the larges t grass -roots ISR
exploration in the United States, with upwards of 400,000 ft of drilling completed since 2023.
PUR anchors one of the strongest exploration portfolios in Wyoming, combining its Cyclone Project in the Great Divide
Basin with Kaycee to drive one of the largest ongoing drilling programs in the state and significantly expand its presence
in both of the state’s major ISR-amenable uranium districts.
Figure 3. PUR’s Wyoming exploration portfolio, highlighting the Kaycee Project in the Powder River
Basin and the Cyclone Project in the Great Divide Basin. Active exploration is currently underway at
both projects.
Qualified Person Statement
The scientific and technical information contained in this news release was reviewed and approved by J.J. Brown, P .G.,
SME-RM, a consultant of PUR, who is a “Qualified Person” as defined by National Instrument 43 -101 - Standards of
Disclosure for Mineral Projects . Ms. Brown has verified the data disclosed in this news release, including sampling,
analytical, and test data underlying the information contained herein.
The drilling results cited in this news release were derived from conventional mud rotary drill holes and continuously
recorded geophysical responses (gamma -ray, spontaneous-potential, and single point resistivity) from a borehole
geophysical probe. The mineralized zones are flat lying and the individual drill holes are vertical in orientation, and the
thicknesses cited in this release are considered to be true thicknesses. Grades of mineralization reported were
calculated from the gamma-ray logs following a procedure that was first developed in the early 1960s and is standard
practice in the uranium industry. The borehole geophysical logging was carried out by Century Geophysics of Tulsa,
Oklahoma, a highly experienced and skilled geophysical contractor with a well-established history of providing reliable
and accurate data.
Other information regarding the Company’s Kaycee Project, including with respect to the Quality Assurance and
Quality Control measures applied during the work program can be referenced from the “Technical Report for NI 43-
101 Kaycee Uranium Project, Johnson County, Wyoming USA”, dated September 21, 2025, which is available under the
Company’s profile on SEDAR +, at www.sedarplus.ca.
About Premier American Uranium Inc.
Premier American Uranium is focused on consolidating, exploring, and developing uranium projects across the United
States to strengthen domestic energy security and advance the transition to clean energy. The Company’s extensive
land position spans five of the nation’s top uranium districts, with active work programs underway in New Mexico’s
Grants Mineral Belt and Wyoming’s Great Divide and Powder River Basins.
Backed by strategic partners including Sachem Cove Partners, IsoEnergy Ltd., Mega Uranium Ltd., and other leading
institutional investors, PUR is advancing a portfolio supported by defined resources and high-priority exploration and
development targets. Le d by a distinguished team with deep expertise in uranium exploration, development,
permitting, operations, and uranium-focused M&A, the Company is well positioned as a key player in advancing the
U.S. uranium sector.
For More Information, Please Contact:
Premier American Uranium Inc.
Colin Healey, CEO
Toll-Free: 1-833-223-4673
Twitter: @PremierAUranium
www.premierur.com
Neither TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary Statement Regarding Forward-Looking Information
This news release contains “forward-looking information” within the meaning of applicable Canadian securities laws.
Forward-looking information includes, but is not limited to, statements with respect to, planned exploration activities
for 2026, the anticipated results thereof and the anticipating timing for reporting of such results; future prospects for
exploration; the potential for mineral resource identification at the Project; expectations regarding the transition to
clean energy in the US; and other activities, events or developments that are expected, anticipated or may occur in the
future. Generally, but not always, forward -looking information and statements can be identified by the use of words
such as “plans”, “expects”, “is e xpected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or
“believes” or the negative connotation thereof or variations of such words and phrases or statements that certain
actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative
connotation thereof.
Forward-looking information and statements are based on our current expectations, beliefs, assumptions, estimates
and forecasts about PUR’s business and the industry and markets in which it operates. Such forward -information and
statements are based on num erous assumptions, including among others, that the results of planned exploration
activities are as anticipated, the price of uranium, the anticipated cost of planned exploration activities, the completion,
timing and results of planned exploration activi ties being consistent with expectations, the anticipated mineralization
being consistent with expectations, that general business and economic conditions will not change in a material adverse
manner, that financing will be available if and when needed and on reasonable terms, that third party contractors,
equipment and supplies and governmental and other approvals required to conduct the Company’s planned exploration
activities will be available on reasonable terms and in a timely manner. Although the assum ptions made by PUR in
providing forward -looking information or making forward -looking statements are considered reasonable by
management at the time, there can be no assurance that such assumptions will prove to be accurate.
Forward-looking information and statements also involve known and unknown risks and uncertainties and other
factors, which may cause actual results, performances and achievements of Premier American Uranium to differ
materially from any projections of results, performances and achievements of Premier American Uranium expressed or
implied by such forward -looking information or statements, including, among others: limited operating history,
negative operating cash flow and dependence on third party financing, uncertainty of additional financing, delays or
failure to obtain required permits and regulatory approvals, changes in mineral resources, no known mineral reserves,
aboriginal title and consultation issues, reliance on key management and other personnel; potential downturns in
economic conditions; availability of third party contractors; availability of equipment and supplies; failure of equipment
to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with
the mineral exploration industry; changes in laws and regulation, competition, and uninsurable risks and the risk factors
with respect to Premier American Uranium set out in PUR’s annual information form for the year ended December 31,
2024 and the other documents of PUR filed with the Canadian securities regulators and available under PUR’s profile
on SEDAR+ at www.sedarplus.ca.
Although PUR has attempted to identify important factors that could cause actual actions, events or results to differ
materially from those contained in the forward -looking information or implied by forward -looking information, there
may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that
forward-looking information and statements will prove to be accurate, as actual results and future events could differ
materially from those anticipated, esti mated or intended. Accordingly, readers should not place undue reliance on
forward-looking statements or information. PUR undertakes no obligation to update or reissue forward -looking
information as a result of new information or events except as required by applicable securities laws.