Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PUR.V ·

Premier American Uranium Announces Preliminary Economic Assessment and Mineral Resource Update for the Cebolleta Uranium Project, Outlining Project Economics and Framework for Enhancement PEA outlines base case production averaging 1.4 Mlb U ₃O₈ annually over a 13-year mine life for total output of

Resource Estimates Economic Studies

Premier American Uranium Announces Preliminary Economic Assessment and

Mineral Resource Update for the Cebolleta Uranium Project, Outlining Project

Economics and Framework for Enhancement

PEA outlines base case production averaging 1.4 Mlb U ₃O₈ annually over a 13-year mine life for total output of 18.1

Mlb with an after-tax NPV (8%) of US$83.9M, with strong leverage to higher uranium prices and increased recovery

TORONTO, Oct. 30, 2025 -- Premier American Uranium Inc. (“PUR” or “Premier American Uranium” or the

“Company”) (TSXV: PUR, OTCQB: PAUIF) is pleased to announce the results of its Preliminary Economic Assessment

(“PEA”) for the Cebolleta Uranium Project (“Cebolleta ” or the “Project”) in New Mexico. The PEA highlights the potential for a

large-scale, long-life, low-capex uranium project with leverage to rising uranium prices. The PEA contemplates a heap leach

strategy that produces a uranium-loaded resin that would be suitable for off-site processing at multiple under-utilized licensed

domestic in-Situ Recovery (ISR) central processing plants, enabling potential development without reliance on legacy

conventional mills. Preliminary economics are believed to have strong potential to be enhanced near-term with advanced

metallurgical testing and process optimization.

The updated Mineral Resource Estimate (“MRE”) for Cebolleta increases Indicated Mineral Resources by 1.7 Mlb eU3O8 (+9%)

to 20.3 Mlb eU 3O8 and increases Inferred Mineral Resources by 2.2 Mlb eU 3O8 (+45%) to 7.0 Mlb eU 3O8, compared to the

previous technical report on the Project released in April 2024 (the “ 2024 Technical Report ”). The updated MRE positions

Cebolleta as one of the largest undeveloped uranium deposits in the western United States. The PEA and MRE are included in

a Technical Report (the “Technical Report ”) prepared in accordance with the requirements of National Instrument 43-101 –

Standards of Disclosure for Mineral Projects (" NI 43-101 ") by SLR International Corporation (" SLR"), an independent

consulting firm with extensive experience in mining and mineral processing, including uranium operations in the United States.

The PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to

have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no

certainty that the PEA will be realized.

Highlights

• Base case mining concept shows Cebolleta average production of 1.4 Mlb U ₃O₈ annually (peak of 2.0 Mlb) for

a total of 18.1 Mlb over its 13-year mine life.

◦ After-tax net present value (“NPV”) (8%) of US$83.9M (US$106M pre-tax)

◦ After-tax IRR of 17.7%

◦ Pre-production costs:

◾ Direct CAPEX of US$64.2M

◾ Indirect (EPCM / Owners cost / Indirect) of US$19.3M

◾ 35% contingency of US$29.2M

◦ Life of Mine (“LOM”) after-tax free cash flow of US$287M

◦ LOM operating cashflow of US$496M

◦ Average operating cost of US$41.60 per lb U3O8 recovered

◾ Relatively low operating costs are underpinned by very competitive heap leach processing costs of

US$16.72 per short ton

◦ Base case uranium price assumption of US$90/lb U₃O₈

• Strong leverage to uranium prices , with higher prices expected to potentially further enhance project

economics and cash flow generation. Uranium price sensitivity analysis shows after-tax NPV (8%) could

reach:

◾ US$154M at US$100/lb U₃O₈

◾ US$325M at US$125/lb U₃O₈

◾ US$488M at US$150/lb U₃O₈

• Upside potential with improved metallurgical recoveries – Sensitivity analysis indicates that base-case after-tax

NPV (8%) of US$84M, increases by approximately 90% to US$159M using a 90% metallurgical recovery assumption.

• Updated MRE significantly increases total Project mineral resources:

◦ Indicated resource: 20.3 Mlb eU 3O8 (8.3 Mst grading 0.12% eU 3O8), up 1.7 Mlb eU 3O8 or 9% vs. 2024

Technical Report

◦ Inferred resource : 7.0 Mlb eU3O8 (3.6 Mst grading 0.10% eU 3O8), up 2.1 Mlb eU3O8 or 43% vs. 2024 Technical

Report

Colin Healey, CEO and Director of Premier American Uranium, commented, “The PEA highlights that Cebolleta has the

potential to be a cornerstone U.S. uranium project with a long mine life, low upfront capital, and strong leverage to higher

uranium prices. Alongside the PEA, the updated MRE significantly increases project-wide resources, reflecting another

successful deliverable for our team. With a clear pathway to optimizing embedded process assumptions through additional

metallurgical studies, and exploration upside potential, we see an opportunity to rapidly de-risk and increase project value, as

we advance Cebolleta toward potential development. We believe these next steps have the potential to position Cebolleta as a

critical contributor to U.S. energy independence.”

Table 1: Summary of Key Economic Parameters – Base Case

Description US$ million

Realized Market Prices  

U3O8 ($/lb) $90

Payable Metal  

U3O8 (klb) 18,101

Total Gross Revenue $1,629

Mining Cost $(705)

Mill Feed Transport Cost $(1)

Process Cost $(175)

G & A Cost $(76)

Royalties $(98)

Severance Tax $(29)

Total Operating Costs $(1,085)

Operating Margin (EBITDA) $545

Operating Margin % 33%

Corporate Income Tax $(48)

Working Capital* $0

Operating Cash Flow $496

Development Capital $(113)

Sustaining Capital $(81)

Closure/Reclamation $(16)

Total Capital $(209)

Pre-tax Free Cash Flow $335.4

Pre-tax NPV @ 5% $166.8

Pre-tax NPV @ 8% $106.3

Pre-tax NPV @ 12% $53.3

Pre-tax IRR 19.8%

Pre-tax Undiscounted Payback from Start of Commercial Production (Years) 4.3

After-tax Free Cash Flow $286.9

After-tax NPV @ 5% $137.3

After-tax NPV @ 8% $83.9

After-tax NPV @ 12% $37.3

After-tax IRR 17.7%

After-tax Undiscounted Payback from Start of Commercial Production (Years) 4.9

Sensitivity Analysis

Sensitivity analysis of the Cebolleta PEA indicates strong leverage to uranium price, where a 11% increase to the base case

assumption (US$90/lb U 3O8) to US$100/lb, increases after-tax NPV (8%) by 83%, to US$154M. Given the current market

growth expectations for the uranium sector and recent (2024 peak UxC Spot uranium price: US$107/lb U 3O8) and leading

uranium price indicators, (UxC 5-year price: US$94/lb U 3O8), sensitivity at higher prices was also examined. At US$125/lb

U3O8, the after-tax project NPV (8%) increases to US$325M (39% increase in uranium price increases post-tax NPV (8%) by

288%).

Also notable, is the leverage to metallurgical recovery assumption, where a 2.5% increase from 80% recovery to 82%,

increases post-tax NPV (8%) by 19%, to US$99.6M. Increasing recovery by 12% (from 80% recovery to 90%) increases after-

tax NPV (8%) by 90%, to US$159M. Standard uranium project sensitivities to various inputs are tabled below.

Table 2: After-Tax Sensitivity Analyses (deviation from base-case)

Variance Metal Prices

(US$/lb U3O8)

NPV at 8%

(US$000)

78%  $70  ($57,384)

89%  $80  $14,410

100%  $90   $83,857

111%  $100  $153,718

122%  $110  $222,911

139%  $125  $325,391

167%  $150  $487,514

Variance Recovery

(%)

NPV at 8%

(US$000)

95%  64%  ($41,713)

98%  72%  $21,288

100%  80%  $83,857

103%  82%  $99,590

112%  90%  $159,261

Variance LOM Total Operating Costs

(US$/ton cumulative)

NPV at 8%

(US$000)

85%  $804,491  $145,076

93%  $875,476  $114,522

100%  $946,460  $83,857

118%  $1,112,091  $12,696

135%  $1,277,721  ($61,750)

Variance LOM Total Capital Costs

(US$000)

NPV at 8%

(US$000)

85%  $190,546  $105,766

93%  $207,359  $94,812

100%  $224,172  $83,857

118%  $263,402  $58,297

135%  $302,633  $32,736

Mineral Resource Estimate

The Cebolleta Uranium Project is underlain by Upper Jurassic Morrison Formation units, particularly the Jackpile Sandstone

Member, which hosts the majority of uranium mineralization. The mineralization is primarily stratabound and tabular, hosted

within medium- to coarse-grained, humate-rich fluvial sandstones of the Jackpile Sandstone. Mineralization is primarily hosted

in the relatively flat laying Jackpile Sandstone at depths below the surface of 0 ft to 500 ft. The Project is composed of the St.

Anthony, Willie P, and Areas I, II, III, IV, and V mining areas.

Historical exploration, including over 4,000 drill holes and multiple mining operations (Willie P, Climax M-6, St. Anthony, and

Sohio JJ#1), has established a robust geologic and mineralization framework for the Project.

A modern confirmation drilling program conducted in 2023 validated historical drilling data, confirming stratigraphy,

mineralization thickness, and grades. Results support the use of legacy data in current resource estimation.

The MRE incorporates over 3,300 validated drill holes totaling greater than 1.7 million feet and is summarized below.

SLR is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant

factors that could materially affect the MRE.

Table 3: Mineral Resource Estimate – Cebolleta Uranium Project - Effective May 14, 2025

Classification Grade Cut-off

(% eU3O8)

Tonnage

(Mst)

Grade

(% eU3O8)

Contained Metal

(Mlb eU3O8)

Indicated        

Underground 0.00 5.89 0.15 18.14

Open Pit 0.02 3.81 0.07 5.61

Subtotal Indicated   9.70 0.12 23.75

Depletion   -1.40 0.12 -3.44

Total Indicated less Depletion   8.30 0.12 20.31

Inferred        

Underground 0.00 1.79 0.12 4.42

Open Pit 0.02 1.81 0.07 2.62

Total Inferred   3.60 0.10 7.04

Notes:

1. CIM (2014) definitions were followed for Mineral Resources.

2. Mineral Resources are estimated using a long-term uranium price of US$90/lb U3O8.

3. Underground Mineral Resources are reported at a cut-off grade of 0.0% eU3O8 within underground reporting panels

designed at a cut-off grade of 0.06% eU3O8. Reporting panels have a maximum design height of 100 ft, length,

minimum design height of 6 ft, and width of 50 ft.

4. Open Pit Mineral Resources are reported at a cut-off grade of 0.02% eU3O8 and constrained by a preliminary optimized

pit shell with a pit slope angle of 50° and bench height of 20 ft.

5. The optimized pit shell, underground reporting shapes, and cut-off grades were generated by assuming metallurgical

recovery of 80%, standard treatment and refining charges, mining costs of $3.31/st moved for open pit and $54/st

marginal mining cost for underground, processing costs of $16.72/st processed, and general and administrative costs

of $6.50/st processed.

6. Mineral Resources have been depleted based on past reported production numbers from the underground JJ#1, Climax

M-6 and Willie P underground mines.

7. A minimum mining width of two feet was used for construction the wireframes.

8. Tonnage Factor is 16 ft3/st (Density is 0.625 st/ft 3 or 2.00 t/m3).

9. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

10. Numbers may not add due to rounding.

Mine Plan Overview and Mineable Resources

The PEA contemplates a two-year underground pre-production period and a 13-year active mine life comprised of underground

and open pit mining across seven mining zones (St. Anthony, Willie P, and Areas I, II, III, IV, and V). The primary mining

methods expected to be employed at Cebolleta will be open pit (St. Anthony Area) and room and pillar (Areas I, II, III, IV, V

and Willie P, St. Anthony North and South Zones).

The mine plan, which is based on Indicated and Inferred Mineral Resources, includes a total of 8.30 million short tons (Mst) at

0.12% eU₃O₈ containing 20.31 million pounds (Mlb) eU ₃O₈ Indicated and 3.60 Mst at 0.10% eU ₃O₈ containing 7.04 Mlb eU ₃O₈

Inferred.

The underground mining areas will be accessed by a 3,500-ft long adit decline starting near the heap pad location for Area III,

with a 2,500-ft long extension of this decline to access Area II. There will be a second access to the underground mining at

Area I and Willie P, which will be a 930-ft long adit starting at a location in the northwest corner of the St. Anthony open pit.

These two underground accesses will be connected by a 3,800-ft long drift. A minimum mining thickness of six feet was

applied to two-foot-thick mining blocks. An underground 85% mining recovery was applied to the Mineral Resource Estimate

reporting panels with underground panel dilution expected to be 21%. PUR is acutely aware of the need to keep dilution low,

given the high cost of mining and treatment.

Over the LOM, mining is expected to supply total process feed of 10.46 Mst with an average head grade of 0.11% eU 3O8.

Mining rates are anticipated to be 1,079 short tons per day (“stpd”) from underground and 1,982 stpd from open pit operations.

It is envisioned that Cebolleta will supply approximately 1.1 million short tons of mineralized material per year to PUR’s heap

leach pad (“HLP”) located on the Cebolleta property.

Figure 1: Mine Plan View – Cebolleta Uranium Project Open Pit and Underground

Processing Overview

Mineralized material will be crushed via mobile crusher in 2-stages to a 2-inch crush size and stacked in lifts on an HLP and

irrigated with dilute sulfuric acid solution for uranium leaching. The LOM average head grade is 0.11% U 3O8, and the process

design U3O8 head grade is 0.140% with the nominal leach recovery assumed at 80%.

Leached uranium is collected as a pregnant leach solution (“PLS”) and processed via ion exchange columns containing resin.

The uranium in the PLS will load onto the resin with the resultant barren solution recycled back to the heap leach for additional

leaching cycles. Loaded resin columns will be removed from service and shipped offsite for further processing.

Total expected LOM uranium recovered is 18.28 Mlb eU 3O8 over the 13-year operating life for an annual average production

rate of 1.4 Mlb eU3O8 (assumed to be 99% payable).

The key planned design criteria are summarized below.

Table 4: Cebolleta Process Design Criteria

Parameter Units Design Source

Daily throughput stpd 2,300 Assumed

Annual throughput stpa 839,500 Calculated

U3O8head grade, design % 0.140 Calculated

U3O8head grade, LOM % 0.110 Calculated

Heap leach recovery % 80 Assumed

U3O8production – Stacked Short Tons per Day stpa 2,290 Calculated

U3O8production – Average Annual Recovered

Metal

Mlb/annum 1.4 Calculated

U3O8production – Average Daily Recovered

Metal

lb/day 3,800 Calculated

ROM moisture % 3 Assumed

Mineralized material specific gravity   3 Assumed

Mineralized Heap Leach bulk density lb/ft3 99.88 Assumed

Crushing   2 stage mobile crusher Assumed

Crusher P80 in 2 Assumed

Heap leach stacking time hours/day 10 Assumed

Heap leach pad dimensions      

Pad height ft 26.2 Assumed

Irrigation rate gpm/ft2 0.004 Assumed

Heap Leach Time Days 90 Assumed

Overall heap leach pad mass st 299,000 Calculated

Heap leach pad application mass st 207,000 Calculated

Heap leach pad area ft2 228,164 Calculated

Heap leach application area ft2 157,960 Calculated

Acid Concentration % 98 Assumed

Leach solution H2SO4Concentration lb/gal 0.05 Assumed

Pregnant solution flowrate gpm 646 Calculated

Evaporation % 7% Assumed

Uranium pregnant solution concentration mg/L 664 Calculated

Ion exchange column volume ft3 530 Assumed

Resin bed depth, height ft 10.8 Calculated

Column diameter ft 8.3 Calculated

Number of columns   4 (2 online, 2 standby) Calculated

Bed volumes per hour BV/hr 10 Calculated

Uranium loading capacity g U3O8per litre resin 30 Assumed

Loaded resin volume per day st 11 Calculated

Number of columns taken out of service per day Columns/d 1.0 Calculated

Number of columns inventory   21 Assumed

Loading pH   1.5 – 2.5 Assumed

Operating temperature Ambient Ambient (20 – 40C) Assumed

Pressure drop across column bar 0.5 – 1 Assumed

Figure 2: Payable eU 3O8 LOM Production Schedule

Project Infrastructure Overview

Current Project access is considered very good and the PEA includes upgrading for commercial operations. The Project will

require an HLP, a resin-in-column processing plant, and standard surface facilities to support mining and processing

operations.

The HLP and associated pond will be synthetically lined so that the solution is contained within a closed system, with the only

net solution loss being to evaporation (designed as a zero-discharge facility). An appropriate location on site has been

identified that meets the capacity requirements and other constraints, as shown below. The HLP construction is staged

throughout the Project life to reduce up-front capital costs.

The Project will have line power and diesel-generated backup electric power for the processing plant, underground operation,

ventilation fans, and surface infrastructure.

The general site layout, including placement of the heap leach pad, waste dump, power lines, roads, underground drifts and

vent shafts are depicted below.

Figure 3: Site Infrastructure Layout

Key Recommendations of the PEA

Given the favourable technical and economic results of the PEA, the independent technical consultants preparing the PEA and

Technical Report have recommended a multi-phase plan to further de-risk and refine project scope and economics, including

advanced metallurgical test work to investigate and enhance leach recovery assumptions and assess other opportunities for

optimization identified within the PEA. Recommendations also include drilling of core holes for confirmation and to provide

sample material for leach tests, among a broader scope of work, ultimately supporting a recommendation to pursue a PEA

update or Preliminary Feasibility Study.

Technical Report

The effective date of the PEA and the MRE is May 15 , 2025, and the Technical Report will be filed on the Company's website

and under its SEDAR+ profile within 45 days of this news release.

When available, readers are encouraged to read the Technical Report in its entirety, including all qualifications, assumptions

and exclusions that relate to the PEA and mineral resource model. The Technical Report is intended to be read as a whole,

and sections should not be read or relied upon out of context.

About the Cebolleta Uranium Project and Mineral Resources

Located in New Mexico, the Cebolleta Uranium Project is a past-producing property with extensive historical work and

infrastructure. Its location in one of the premier uranium districts in the US provides strategic advantages, including proximity

to utilities and existing processing facilities.

Qualified Person

The scientific and technical information contained in this news release relating to the PEA and MRE was reviewed and

approved by Mr. Mark B. Mathisen, C.P.G., Stuart Collins, P.E., Jeffrey L. Woods, MMSA QP, Lee (Pat) Gochnour, MMSA

QP and Matthew Behling, P.E., for SLR International Corporation, the authors of the Current Technical Report, each of whom

is a “Qualified Person” (as defined in NI 43-101).

Mr. Mathisen (QP) has verified the exploration, sampling, analytical, and test data supporting the Technical Report through

review and audit of historical and recent databases, comparison with original geophysical logs and assay records, and

inspection of drill hole collar, interval, and grade data for completeness and accuracy. Verification included a site visit on

September 12, 2023, review of drilling and downhole logging procedures, and evaluation of the 2023 twin-hole and 2025 Willie

P database audits, which confirmed strong correlation with historical results and overall data reliability. Although no historical

core or quality assurance/quality control reference materials are available and most legacy holes lack deviation surveys, no

limitations were placed upon the QP during the verification process, and the QP considers the verification methods and

resulting database adequate for Mineral Resource estimation and compliant with NI 43-101 requirements.

Additional scientific and technical information in this news release not specific to the PEA and MRE has been reviewed and

approved by Dean T. Wilton, PG, CPG, MAIG, a consultant of Premier American Uranium Inc. , who is a “Qualified

Person” (as defined in NI 43-101).

About Premier American Uranium Inc.

Premier American Uranium is focused on consolidating, exploring, and developing uranium projects across the United States

to strengthen domestic energy security and advance the transition to clean energy. The Company’s extensive land position

spans five of the nation’s top uranium districts, with active work programs underway in New Mexico’s Grants Mineral Belt and

Wyoming’s Great Divide and Powder River Basins.

Backed by strategic partners including Sachem Cove Partners, IsoEnergy Ltd., Mega Uranium Ltd., and other leading

institutional investors, PUR is advancing a portfolio supported by defined resources and high-priority exploration and

development targets. Led by a distinguished team with deep expertise in uranium exploration, development, permitting,

operations, and uranium-focused M&A, the Company is well positioned as a key player in advancing the U.S. uranium sector.

For More Information, Please Contact:

Premier American Uranium Inc.

Colin Healey, CEO and Director

[email protected]

Toll-Free: 1-833-223-4673

X: @PremierAUranium

www.premierur.com

Neither TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Non-GAAP Financial Measures

This news release includes certain terms or performance measures commonly used in the mining industry that are not defined

under International Financial Reporting Standards ("IFRS"). Such non-GAAP performance measures, including operating costs

and free cash flow, are included because it understands that investors use this information to determine the Company's ability

to generate earnings and cash flows. The Company believes that conventional measures of performance prepared in

accordance with IFRS do not fully illustrate the ability of mines to generate cash flows.  Non-GAAP financial measures should

not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS and are not

necessarily indicative of cash flows presented under IFRS. These measures have no standardized meaning under IFRS and

may not be comparable to similar measures presented by other companies.

Cautionary Statement Regarding Forward-Looking Information

This news release contains “forward-looking information” within the meaning of applicable Canadian securities laws. Forward-

looking information includes, but is not limited to, statements with respect to, the economic and scoping-level parameters of

the PEA and the Project; the anticipated timeline for completion of the Technical Report; mineral resource estimates; the cost

and timing of any development of the Project; the proposed mine plan and mining methods; dilution and mining recoveries;

processing method and rates; production rates; projected metallurgical recovery rates; infrastructure requirements; energy

sources; capital and operating cost estimates; the projected LOM and other expected attributes of the Project; the NPV, IRR

and payback period of capital; the uranium industry and uranium prices; government regulations and permitting; access to the

Project; water sources and management; estimates of reclamation obligations and closure costs; requirements for additional

capital; expectations with respect to project development and permitting, construction and operational processes; availability

of services to be provided by third parties; future development methods and plans;  and other activities, events or

developments that are expected, anticipated or may occur in the future. Generally, but not always, forward-looking information

and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”,

“estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words

and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or

“be achieved” or the negative connotation thereof.

Forward-looking information and statements are based on our current expectations, beliefs, assumptions, estimates and

forecasts about PUR’s business and the industry and markets in which it operates. Such forward-information and statements

are based on numerous assumptions, including among others, general business and economic conditions will not change in a

material adverse manner, that financing will be available if and when needed and on reasonable terms, that third party

contractors, equipment and supplies and governmental and other approvals required to conduct the Company’s planned

exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by PUR in

providing forward-looking information or making forward-looking statements are considered reasonable by management at the

time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which

may cause actual results, performances and achievements of Premier American Uranium to differ materially from any

projections of results, performances and achievements of Premier American Uranium expressed or implied by such forward-

looking information or statements, including, among others: risks related to the inherent uncertainties regarding cost

estimates; changes in commodity and metal prices; results of future exploration activities; cost overruns; the limited operating

history of the Company; negative operating cash flow and dependence on third party financing; uncertainty of additional

financing; delays or failure to obtain required permits and regulatory approvals; changes in mineral resources; no known

mineral reserves; aboriginal title and consultation issues; reliance on key management and other personnel; potential

downturns in economic conditions; availability of third party contractors; availability of equipment and supplies; failure of

equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated

with the mineral exploration industry; changes in laws and regulation, competition, and uninsurable risks and the risk factors