Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PTU.V ·

Purepoint Uranium Group Inc.: Mobilizes at Hook Lake in Preparation for Winter Program

Corporate Updates

Purepoint Uranium Group Inc.: Mobilizes at Hook Lake in

Preparation for Winter Program

TORONTO

,

Dec. 23, 2019

/CNW/ - Purepoint Uranium Group Inc. (TSXV: PTU) ("

Purepoint

" or the "

Company

") announced today that field

crews have mobilized at the Hook Lake project in preparation for this winter's exploration program. The Hook Lake Project is a joint venture

between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%) and Purepoint (21%) in the Patterson Uranium District,

Saskatchewan

Canada

. The Hook Lake project lies on the southwestern edge of

Saskatchewan's

Athabasca

Basin and is adjacent to and on trend with recent

high-grade uranium discoveries including Fission Uranium's Triple R deposit and NexGen's Arrow deposit.

"Our

Patterson Lake

camp is now open and field crews are building up lake ice using flood pumps in preparation of lake-based holes to be drilled

early next year. We have awarded our drilling contract to Cyr Drilling International Ltd., who will be drilling up to 3,500 metres, and our

geophysical work has been awarded to Discovery International Geophysics Inc.", said

Scott Frostad

, Purepoint's Vice President of Exploration.

"The 2020 diamond drilling will continue to test high-priority targets along the Patterson Corridor including a conductive shear between the Spitfire

Zone and the Dragon area as well as follow-up targets within the Hornet area. We anticipate the electromagnetic geophysical survey will provide

new drill targets northeast of encouraging drill hole HK19-105 early next year, in time for consideration during this drill program".

An exploration budget of

$2,000,000

has been approved by the Hook Lake JV partners for 2020 that includes up to 3,500 metres of drilling in

approximately seven holes and a geophysical survey (see

news release from

November 12, 2019

). More information on the Hook Lake Project

can also be viewed on the Company's website

https://purepoint.ca/projects/hook-lake/

.

Hook Lake Project - 2020 Exploration Targets (CNW Group/Purepoint Uranium Group Inc.)

Hook Lake JV Project

The Hook Lake JV project is owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and Purepoint Uranium Group Inc. (21%) as

operator and consists of nine claims totaling 28,598 hectares situated in the southwestern

Athabasca

Basin. The Hook Lake JV is considered one

of the highest quality uranium exploration projects in the

Athabasca

Basin due to its location along the prospective

Patterson Lake

trend and the

relatively shallow depth to the unconformity.

Current exploration is targeting the Patterson Lake Corridor that hosts Fission's Triple R Deposit (indicated mineral resource 87,760,000 lbs

U3O8 at an average grade of 1.82% U3O8 –

www.fissionuranium.com

), NexGen Energy's Arrow Deposit (indicated mineral resource

256,600,000 lbs U3O8 at an average grade of 4.03% –

www.nexgenenergy.ca

) and the Spitfire Discovery by the Hook Lake JV. The foregoing

mineral resource disclosure is information about the properties adjacent Company's property and does not imply that the Company will obtain

similar information from its own property.

About Purepoint

Purepoint Uranium Group Inc. is focused on the precision exploration of its ten projects in the Canadian Athabasca Basin, the world's richest

uranium region. Established in the

Athabasca

Basin well before the initial resurgence in uranium earlier last decade, Purepoint's flagship project is

the Hook Lake Project, a joint venture with two of the largest uranium suppliers in the world, Cameco Corporation and Orano Canada Inc. The

Hook Lake JV is on trend with recent high-grade uranium discoveries including Fission Uranium's Triple R Deposit, NexGen's Arrow Deposit and

Purepoint's Spitfire discovery.

Scott Frostad BSc

, MASc, PGeo, Purepoint's Vice President, Exploration, is the Qualified Person responsible for technical content of this

release.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts

responsibility for the adequacy or accuracy of this Press release.

Disclosure regarding forward-looking statements

This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such

forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties

and are not guarantees of future performance of the Company. These risks and uncertainties could cause actual results and the Company's plans

and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially

from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and

opinions of management on the dates they are made and expressly qualified in their entirety by this notice.

View original content to download multimedia:

http://www.prnewswire.com/news-releases/purepoint-uranium-group-inc-mobilizes-at-hook-lake-in-preparation-for-winter-program-300978486.html

SOURCE

Purepoint Uranium Group Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/December2019/23/c7316.html

%SEDAR: 00020406E

For further information:

Chris Frostad, President & CEO, Phone: (416) 603-8368, Email: [email protected]

CO: Purepoint Uranium Group Inc.

CNW 06:30e 23-DEC-19