Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PTU.V ·

Purepoint Uranium Group Inc: Hook Lake JV Partners Approve $3 Million For 2019 Exploration Budget

Exploration Programs Partnerships & JV

Purepoint Uranium Group Inc: Hook Lake JV Partners Approve $3 Million

For 2019 Exploration Budget

TORONTO

,

Dec. 11, 2018

/CNW/ - Purepoint Uranium Group Inc. (the "

Company

" or "

Purepoint

") (TSX: PTU.V) announced today that the proposed 2019

Hook Lake JV exploration program with a budgeted cost of

$3,000,000

has been approved by the JV partners. Situated within the Patterson Uranium

District, the Hook Lake JV is a project owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and Purepoint Uranium Group Inc. (21%), and

is on trend with recent high-grade uranium discoveries including Fission Uranium's Triple R deposit and NexGen's Arrow deposit.

Highlights:

An exploration budget of

$3,000,000

has been approved by the Hook Lake JV partners for 2019;

The proposed exploration program includes 6,600 metres of diamond drilling, approximately 17 holes utilizing two drills, and a ground geophysical

survey;

A transient electromagnetic survey will be carried out with the objective of defining a target path between the Dragon and Spitfire areas;

Seven diamond drill holes have been planned to test high-priority targets along the Patterson Corridor;

Ten diamond drill holes have been planned to begin testing the Derkson Corridor, just east of and parallel to the Patterson Lake Corridor, where historic

initial drilling in 1978 by SMDC discovered uranium mineralization.

Patterson Corridor and Derkson Corridor, Athabasca Basin (CNW Group/Purepoint Uranium Group Inc.)

Derkson Corridor

Historic exploration efforts in the Patterson area focused on the Derkson Corridor, where SMDC encountered uranium mineralization near the unconformity

averaging 0.24% U

3

O

8

and 1.35% Ni over 2.5 metres in 1978. Drill holes along this trend encountered very encouraging clay basement alteration but were

typically completed only 30 to 40 metres past the unconformity. Based on the geologic setting of the Patterson Corridor mineralization, it is considered that

the historic shallow drilling along the Derkson Corridor did not properly test for basement-hosted uranium deposits.

Ten holes are planned at depths of approximately 250 metres each (two to three times deeper than historic efforts) in hopes of opening up a new structural

corridor of discovery in the south-west

Athabasca

Basin.

Hook Lake JV Project

The Hook Lake JV project is owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and Purepoint Uranium Group Inc. (21%) and consists of

nine claims totaling 28,598 hectares situated in the southwestern

Athabasca

Basin. The Hook Lake JV is considered one of the highest quality uranium

exploration projects in the

Athabasca

Basin due to its location along the prospective

Patterson Lake

trend and the relatively shallow depth to the

unconformity.

Current exploration is targeting the Patterson Lake Corridor that hosts Fission's Triple R Deposit (indicated mineral resource 87,760,000 lbs U

3

O

8

at an

average grade of 1.82% U

3

O

8

), NexGen Energy's Arrow Deposit (indicated mineral resource 256,600,000 lbs U

3

O

8

at an average grade of 4.03%) and the

Spitfire Discovery by the Hook Lake JV.

About Purepoint

Purepoint Uranium Group Inc. is focused on the precision exploration of its seven projects in the Canadian Athabasca Basin. Purepoint proudly maintains

project ventures in the Basin with two of the largest uranium producers in the world, Cameco Corporation and Orano Canada Inc. Established in the

Athabasca

Basin well before the initial resurgence in uranium earlier last decade. Purepoint is actively advancing a large portfolio of multiple drill targets in

the world's richest uranium region.

Scott Frostad BSc

, MASc, PGeo, Purepoint's Vice President, Exploration, is the

Qualified Person

responsible for technical content of this release.

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS

RELEASE.

View original content to download multimedia:

http://www.prnewswire.com/news-releases/purepoint-uranium-group-inc-hook-lake-jv-partners-approve-3-million-for-2019-exploration-budget-300762979.html

SOURCE

Purepoint Uranium Group Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/December2018/11/c4762.html

%SEDAR: 00020406E

For further information:

Purepoint Uranium Group Inc., Chris Frostad, President and CEO, (416) 603-8368, www.purepoint.ca

CO: Purepoint Uranium Group Inc.

CNW 06:30e 11-DEC-18