Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PTU.V ·

Purepoint Uranium Announces Upcoming Hook Lake Drill Program

Exploration Programs

Purepoint Uranium Announces Upcoming Hook

Lake Drill Program

Toronto, Ontario--(Newsfile Corp. - November 20, 2023) - Purepoint Uranium Group Inc. (TSXV: PTU)

(OTCQB: PTUUF)

("Purepoint"

or the

"Company"

) announced today the approval of the exploration

program for the Hook Lake Project for the upcoming winter season. The Hook Lake Project is a joint

venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and

drilling is scheduled to commence in January 2024. The Project lies on the southwestern edge of

Canada's Athabasca Basin, Canada and is adjacent to, and on trend with, high-grade uranium

discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

"This past winter's program ended on a very high note with a uranium intercept associated with boron

that is reminiscent of our early discoveries at the Spitfire Deposit.

As a matter of fact, hole CRT23-05

delivered the project's highest uranium grade outside of the Spitfire Deposit" said Scott Frostad, Vice

President Exploration at Purepoint. "We are anxious to follow up on this radioactivity to determine

whether we are coming into a prominent area of mineralization."

Highlights

Approximately 2,500 metres of diamond drilling are planned across 5 holes at the Carter Corridor.

The program will follow up on hole CRT23-05 which returned an assay of 0.08% U3O8 (671 ppm

U) over 0.4 metres (319.1 to 319.5m) from a 15-metre graphitic shear zone (318 to 333m

downhole depth) below the unconformity (283m).

In addition, the CRT23-05 mineralization was found to have a significant boron halo returning

greater than 800 ppm B over 35 metres (305-340m).

The Carter corridor is a long lived, reactivated fault zone that lies between the Clearwater Domain

granitic intrusive rocks to the west and runs parallel to the Patterson structural corridor to the

immediate east.

The 25-kilometre strike length of the Carter structural/conductive corridor is almost entirely located

within the Hook Lake JV project.

Drilling is expected to begin in January 2024.

Complete details of all Purepoint's exploration projects and next steps can be found on the

company's website at

https://purepoint.ca/investor/portfolio-handbook/

.

A current National Instrument 43-101 compliant technical report on the flagship Hook Lake Joint Venture

project can be found at

https://purepoint.ca/projects/hook-lake/

- "Technical Report on the Hook Lake

Project, Northern Saskatchewan, Canada April 19, 2022."

Hook Lake - The Carter Corridor

The Hook Lake JV Project is owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and

Purepoint Uranium Group Inc. (21%) as operator and consists of nine claims totaling 28,598 hectares

situated in the southwestern Athabasca Basin. The Hook Lake JV Project is considered one of the

highest quality uranium exploration projects in the Athabasca Basin due to its location along the

prospective Patterson Lake trend and the relatively shallow depth to the unconformity.

The Patterson Lake area was recently flown by an airborne gravity survey (Boulanger, Kiss and

Tschirhart, 2019) that was funded by the Targeted Geoscience Initiative (TGI), a collaborative federal

geoscience program. The gravity results show the southern portion of the Carter corridor as being

associated with the same gravity high response as the Triple R and Arrow uranium deposits. The gravity

low response west of the Carter corridor reflects the geologically younger, Clearwater Domain intrusions.

The TGI researchers (Potter et al., 2020) consider the Clearwater Domain intrusions as being high-heat-

producers that warmed and circulated hydrothermal fluids over the structural corridors. Prolonged

interaction of oxidized uranium-bearing fluids with basement rocks via reactivated faults is thought to

have formed the high-grade uranium deposits.

Earlier this year, Purepoint drilled 2,710 metres in six holes to test the Carter Corridor. As this was our

first pass drilling, the main conductive trend was tested using 800 metre step-outs towards the north to

identify the most prospective geology.

Drill hole CRT23-05 intersected a sheared/faulted chlorite-altered, graphitic diorite gneiss over 15

metres before encountering 5 metres of intense clay alteration. The graphitic shear returned an assay of

0.08% U3O8 (671 ppm U) over 0.4 metres (319.1 to 319.5m).

About Purepoint

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline

of 9 advanced projects in Canada's Athabasca Basin. In addition to its flagship joint venture project at

Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake,

Purepoint also holds seven, 100% owned projects with proven uranium rich targets. With an aggressive

exploration program underway on multiple projects, Purepoint is emerging as the preeminent uranium

explorer in the world's richest uranium district.

Scott Frostad, P.Geo., Purepoint's Vice President, Exploration, is the Qualified Person responsible for

technical content of this release.

For more information, please contact:

Chris Frostad, President & CEO

Phone: (416) 603-8368

Email:

[email protected]

For additional information please visit our website at

https://purepoint.ca

,

our X feed:

@PurepointU3O8

or our LinkedIn page

@Purepoint-Uranium

.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press

release.

Disclosure regarding forward-looking statements

This press release contains projections and forward-looking information that involve various risks and

uncertainties regarding future events. Such forward-looking information can include without limitation

statements based on current expectations involving a number of risks and uncertainties and are not

guarantees of future performance of the Company. These risks and uncertainties could cause actual

results and the Company's plans and objectives to differ materially from those expressed in the forward-

looking information. Actual results and future events could differ materially from those anticipated in such

information. These and all subsequent written and oral forward-looking information are based on

estimates and opinions of management on the dates they are made and expressly qualified in their

entirety by this notice.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/187961