Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PTU.V ·

Purepoint Uranium Announces AGM Results and Provides Update on its Hook Lake Project

Shareholder Meetings

Purepoint Uranium Announces AGM Results

and Provides Update on its Hook Lake Project

TORONTO

,

July 15, 2020

/CNW/ - Purepoint Uranium Group Inc. (TSXV: PTU) ("

Purepoint

" or the

"

Company

") announced results of its Annual General Meeting held in

Toronto, ON

, on

July 14, 2020

,

and provided an update on its corporate activities.

At the AGM, shareholders voted in favor of all matters of business. These matters included the

elections of Allan Beach,

Borys Chabursky

,

Chris Frostad

and

Scott Frostad

as Directors, the

appointment of MNP LLC as Auditors and the approval of the Incentive Stock Option Plan.

The Company is currently planning for its next drill program at its flagship Hook Lake Project, a joint

venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) in

the Patterson Uranium District,

Saskatchewan, Canada

.

The work to date at the Hook Lake Project as well as the collective discoveries and next steps are

detailed in a series of short videos which can be accessed at the links below:

The Patterson Model - Part 1

: A 4.5-minute video on the Patterson Model (

https://youtu.be/o1CbgHRfdAY

)

The Patterson Model - Part 2

: A 5-minute video outlining the recent findings, potential and plans

for the Sabre Zone (

https://youtu.be/KGZwvRnRHSo

)

Uncovering the Patterson Uranium District

: a 5-minute overview of the history of the Patterson

Uranium District (

https://youtu.be/Rt43EpZu4ck

)

More videos can be viewed at the Company website at:

https://purepoint.ca/videos/

Hook Lake JV Project

The Hook Lake JV Project is owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%),

and Purepoint Uranium Group Inc. (21%) as operator and consists of nine claims totaling 28,598

hectares situated in the southwestern

Athabasca

Basin. The Hook Lake JV Project is considered

one of the highest quality uranium exploration projects in the

Athabasca

Basin due to its location

along the prospective

Patterson Lake

trend and the relatively shallow depth to the unconformity.

Current exploration is targeting the Patterson Lake Corridor that hosts Fission's Triple R Deposit

(indicated mineral resource 87,760,000 lbs. U3O8 at an average grade of 1.82% U3O8 –

www.fissionuranium.com

), NexGen Energy's Arrow Deposit (indicated mineral resource 256,600,000

lbs. U3O8 at an average grade of 4.03% –

www.nexgenenergy.ca

) and the Spitfire discovery by

the Hook Lake JV. The foregoing mineral resource disclosure is information about the properties

adjacent to the Company's property and does not imply that the Company will obtain similar

information from its own property.

About Purepoint

Purepoint Uranium Group Inc. is focused on the precision exploration of its nine projects in the

Canadian Athabasca Basin, the world's richest uranium region. Established in the

Athabasca

Basin

well before the initial resurgence in uranium earlier last decade, Purepoint's flagship project is the

Hook Lake Project, a joint venture with two of the largest uranium suppliers in the world, Cameco

Corporation and Orano Canada Inc. The Hook Lake JV Project is on trend with recent high-grade

uranium discoveries including Fission Uranium's Triple R Deposit, NexGen's Arrow Deposit and the

Hook Lake JV's Spitfire discovery.

Scott Frostad BSc

, MASc, PGeo, Purepoint's Vice President, Exploration, is the Qualified

Person responsible for technical content of this release.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press

release.

Disclosure regarding forward-looking statements

This news release contains projections and forward-looking information that involve various risks and

uncertainties regarding future events. Such forward-looking information can include without limitation

statements based on current expectations involving a number of risks and uncertainties and are not

guarantees of future performance of the Company. These risks and uncertainties could cause actual

results and the Company's plans and objectives to differ materially from those expressed in the

forward-looking information. Actual results and future events could differ materially from those

anticipated in such information. These and all subsequent written and oral forward-looking

information are based on estimates and opinions of management on the dates they are made and

expressly qualified in their entirety by this notice.

SOURCE

Purepoint Uranium Group Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/July2020/15/c5747.html

%SEDAR: 00020406E

For further information:

Chris Frostad, President & CEO, Phone: (416) 603-8368, Email:

[email protected]

CO: Purepoint Uranium Group Inc.

CNW 06:30e 15-JUL-20