Purepoint Uranium and Cameco Approve 2025 Drill Program for Smart Lake Joint Venture
Purepoint Uranium and Cameco Approve 2025
Drill Program for Smart Lake Joint Venture
Toronto, Ontario--(Newsfile Corp. - November 26, 2024) - Purepoint Uranium Group Inc. (TSXV: PTU)
(OTCQB: PTUUF) ("
Purepoint
" or the "
Company
") is pleased to announce the approval of a $1.2
million drilling program at the Smart Lake Joint Venture (JV) Project, marking a significant return to this
highly prospective project within the southwestern Athabasca Basin, Saskatchewan, Canada.
The Smart Lake JV, jointly owned by Cameco Corporation (73%) and Purepoint (27%), exemplifies
Purepoint's strategy of advancing high-potential projects through partnerships with industry leaders. As
operator of the joint venture, Purepoint continues to provide its proven exploration expertise while
leveraging Cameco's technical support and financial resources. Our JV relationships enable efficient
and well-supported exploration while preserving Purepoint's strong financial position and offering a clear
path to potential development.
Chris Frostad, President and CEO of Purepoint, remarked: "The approval of this drill program marks an
exciting return to the Smart Lake Project, where our first exploration efforts revealed strong potential.
With the backing of Cameco and new geophysical data guiding our efforts, we look forward to advancing
and expanding upon the success of our earlier work."
Highlights
2025 Drill Program Approved
: A $1.2-million budget will support approximately 2,500 metres of
diamond drilling targeting the northern Groomes Lake conductor.
Geophysical Survey Commenced
: A 39-line-km transient electromagnetic (TEM) survey is
underway and will refine drill targets for the upcoming campaign.
Exploration Resumed:
Building on uranium mineralization identified during Smart Lake's first
drill program, this marks Purepoint's return to the property after focusing on other joint venture
opportunities in the region.
Revisiting a Proven Uranium Target
The 2025 drill program builds on the results of Purepoint's initial drill campaign at Smart Lake in 2008,
during which uranium mineralization was first identified. Initial holes, including SMT08-01, intersected
strongly altered basement structures associated with elevated radioactivity, highlighting the potential for
large-scale uranium mineralization. SMT08-05 returned 147 ppm U over 15.4 metres (153.0 to 168.4
metres) from a fault zone defined by multiple intervals of hematite breccia, shearing, gouge, poor core
recovery and elevated radioactivity.
Although subsequent exploration efforts shifted to Hook Lake
following regional discoveries by neighboring projects, the Smart Lake property has remained a priority
within Purepoint's portfolio for its untested conductors and compelling geological parallels to high-grade
deposits.
A National Instrument 43-101 compliant Technical Report for the Smart Lake project is available on the
Company's website. The technical report for Smart Lake filed by the Company in 2012 under the
Company's profile at
https://www.sedarplus.ca/
and displayed on its website at
https://purepoint.ca/projects/smart-lake/
may be relied on for background information but contains a work
program not updated to reflect current exploration plans.
2025 Drill Program and Geophysical Survey
The approved drilling program will focus on high-priority targets within the northern Groomes Lake target
area. The strong Groomes Lake electromagnetic conductor remains largely untested despite evidence
of a favourable structural setting. The ongoing TEM survey, scheduled for completion by year-end, will
provide detailed insights into subsurface conductors, optimizing drill targeting and efficiency.
About Smart Lake
The Smart Lake Project is located approximately 60 km south of the historic Cluff Lake mine and 18 km
west-northwest of the Hook Lake JV Project. The property spans 9,860 hectares within the Athabasca
Basin, an area renowned for hosting the world's highest-grade uranium deposits.
Initial exploration at Smart Lake established the presence of graphitic shear zones, hydrothermal
alteration, and anomalous radioactivity. The favourable geologic indicators, combined with its strategic
location and extensive geophysical data, position Smart Lake for uranium exploration success.
Figure 1: Smart Lake Location
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3218/231317_6156083124565b71_002full.jpg
About Purepoint Uranium Group Inc.
Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) is a focused explorer with a dynamic
portfolio of advanced projects within the renowned Athabasca Basin in Canada. The most prospective
projects are actively operated on behalf of partnerships with industry leaders including Cameco
Corporation, Orano Canada Inc., and IsoEnergy Ltd.
Additionally, the Company holds a promising VHMS project currently optioned to and strategically
positioned adjacent to and on trend with Foran Corporation's McIlvena Bay project. Through a robust and
proactive exploration strategy, Purepoint is solidifying its position as a leading explorer in one of the
globe's most significant uranium districts.
For further details on the Smart Lake Project and Purepoint's exploration portfolio, visit
www.purepoint.ca
.
Scott Frostad, P.Geo., Purepoint's Vice President, Exploration, is the Qualified Person responsible for
technical content of this release.
For more information, please contact:
Chris Frostad, President & CEO
Phone: (416) 603-8368
Email:
For additional information please visit our website at
https://purepoint.ca
,
our X feed:
@PurepointU3O8
or our LinkedIn page
@Purepoint-Uranium
.
Neither the Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press
release.
Disclosure regarding forward-looking statements
This press release contains projections and forward-looking information that involve various risks and
uncertainties regarding future events. Such forward-looking information can include without limitation
statements based on current expectations involving a number of risks and uncertainties and are not
guarantees of future performance of the Company. These risks and uncertainties could cause actual
results and the Company's plans and objectives to differ materially from those expressed in the forward-
looking information. Actual results and future events could differ materially from those anticipated in such
information. These and all subsequent written and oral forward-looking information are based on
estimates and opinions of management on the dates they are made and expressly qualified in their
entirety by this notice.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/231317