Platinum Group Metals Ltd. Reports Third Quarter 2022 Results
(Vancouver/Johannesburg) Platinum Group Metals Ltd. (PTM:TSX; PLG:NYSE American)
(“Platinum Group”, “PTM” or the “Company”) reports the Company’s financial results for
the nine months ended May 31, 2022 and provides a summary of recent events and outlook.
The Company is focused on advancing the Waterberg Project located on the Northern Limb of
the Bushveld Complex in South Africa (the “Waterberg Project”). The Waterberg Project is
planned as a fully mechanised, shallow, decline access palladium, platinum, gold and rhodium
(“4E”) mine and is projected to be one of the largest and lowest cost underground platinum
group metals (“PGM” or “PGMs”) mines globally.
The Company’s near-term objectives are to advance the Waterberg Project to a development
and construction decision , including the arrangement of construction f inancing and
concentrate offtake arrangements. The Company is also advancing research and
development through Lion Battery Technologies Inc. (“ Lion”) using platinum and palladium
in lithium battery technolog ies in collaboration with Anglo American Platinum Limited
(“Anglo”) and Florida International University (“FIU”).
For details of the condensed consolidated interim financial statements for the nine months
ended May 31 , 20 22 (the “ Financial Statements ”) and Management’s Discussion and
Analysis for the nine months ended May 31, 2022 please see the Company’s filings on SEDAR
(www.sedar.com) or on EDGAR ( www.sec.gov). Shareholders are encouraged to visit the
Company’s website at www.platinumgroupmetals.net. Shareholders may receive a hard copy
of the complete Financial Statements from the Company free of charge upon request.
All amounts herein are reported in United States dollars unless otherwise specified. The
Company holds cash in Canadian dollars, United States dollars and South African Rand .
Changes in exchange rates may create variances in the cash holdings or results reported.
Recent Events
On June 14, 2022, the High Court of South Africa delivered a judgment dismissing a legal
challenge brought by Africa Wide Mineral Prospecting and Exploration (Pty) Limited (“ Africa
Wide”), a wholly owned subsidiary of Wesizwe Platinum Limited, to the 2018 sale of the
Maseve Mine to Royal Bafokeng Platinum Limited. In its judgment the High Court dismissed
all of the claims for which Africa Wide contended and ordered Africa Wide to make payment
of the defendants' costs. In its ruling, the High Court found that Africa Wide had firstly failed
to make its case on the evidence and secondly that, having failed to challenge the transaction
within the time limit prescribed under section 115 of the South Africa Companies Act, Africa
Wide's case was statutorily barred. On July 1, 2022 Africa Wide filed an application for leave
to appeal the judgment of the High Court and the Company intends to oppose the application.
PLATINUM GROUP METALS LTD. …2
On May 10, 2022, the Company and Japan Oil, Gas and Metals National Corporation
(“JOGMEC”) signed a formal Memorandum of Understanding (“ MOU”) acknowledging a
consensus to accelerate financing opportunities for the Waterberg Project. Hanwa Co., Ltd.
(“Hanwa”) was a witness to the MOU. JOGMEC expressed its intention to maintain JOGMEC’s
interests in the Waterberg Project and to support funding contributions for project
development to the extent possible.
On February 11, 2022 , the Company repa id the remaining principal balance due and
outstanding interest on a $20 million senior secured loan facility with Sprott Private Resource
Lending II (Collector), LP and the other lenders party thereto (the “2019 Sprott Facility”).
After this repayment, the Company became debt free and the pledge of its South African
assets as security was fully released.
On February 11, 2022, the Company completed a non -brokered private placement of
3,539,823 common shares at a price of $1.695 per common share to existing major beneficial
shareholder, Hosken Consolidated Investments Limited (“HCI”), resulting in proceeds to the
Company of $6.0 million (the “Private Placement”). Pricing of the Private Placement was
consistent with the equity consideration paid by the Company to purchase and cancel its
outstanding $19.99 million 6 7/8% Convertible Senior Subordinated Notes (“Convertible
Notes”) as described below. The Private Placement allowed HCI to return to a near 26%
interest in the Company, as it held prior to the purchase and cancellation of the Convertible
Notes.
On February 11, 2022, the Company reported the privately negotiated purchase and
cancellation of the Company’s Convertible Notes maturing on July 1, 2022. The Company
issued to the holders, on a private placement basis, an aggregate of 11,793,509 Common
Shares of the Company at a price of $1.695 per share in consideration for the $19.99 million
principal outstanding balance of the Convertible Notes. The Company paid accrued and
unpaid interest on the Convertible Notes in cash.
On October 14, 2021, the Company reported completion of a geotechnical drilling campaign
at the Waterberg Project consisting of 46 boreholes drilled along the planned centerline of
two sets of twin declines and box -cut positions. A total of 5,966 metres of drill core were
recovered and a total of 2,696 metres of core were geotechnically logged from within the zone
of interest. Downhole geophysical surveys were conducted . Core samples of all major
geotechnical units encountered were collected and subjected to laboratory testing.
Geotechnical qualified persons monitoring the drill programme determined that in general,
the rock mass encountered along both decline routes is competent and can support the
planned excavations with no major problem areas expected.
On July 6, 2021 , Waterberg JV Resources Proprietary Limited (“ Waterberg JV Co. ”)
completed the registration of a mining right at the Minerals and Petroleum Titles Registration
Office (the “Waterberg Mining Right”). The Waterberg Mining Right was notarially executed
by the Department of Mineral Resources and Energy (“DMRE”) on April 13, 2021, and remains
active.
Results For The Nine Months Ended May 31, 2022
During the nine months ended May 31, 2022, the Company incurred a net loss of $7.26 million
(May 31, 2021 - $8.84 million). In the current period, general and administrative expenses
were $3.26 million (May 31, 2021 - $2.91 million) with the increase primarily due to legal
PLATINUM GROUP METALS LTD. …3
fees for the Africa Wide trial , which took place during October 2021 and March 2022 (as
described above). In the current period , interest expense of $ 1.65 million was recognized
(May 31, 2021 - $3.63 million) with the reduction due to reduced overall debt outstanding
during the current period. The currency translation adjustment recognized in the nine month
period was a loss of $2.79 million (May 31, 2021 - $6.13 million gain) with the variance due
to the Rand decreasing in value relative to the U.S. Dollar during the current period.
At May 31, 2022, finance income consisting of interest earned and property rental fees in the
period amounted to $ 0.09 million (May 31, 2021 - $0.07 million). Loss per share for the
period amounted to $ 0.08, as compared to a loss of $0.12 per share for the nine months
ended May 31, 2021.
During the nine months ended May 31, 2022, $9.4 million of principal was repaid against the
2019 Sprott Facility, eliminating the principal balance due. During the period the Company
also fully repaid $20 million of Convertible Notes.
Amounts receivable (including 2021 ATM proceeds receivable) at May 31, 2022, totalled $0.56
million (August 31, 2021 - $0.48 million) while accounts payable and accrued liabilities
amounted to $ 0.77 million ( August 31, 2021 - $2.46 million). A mounts receivable were
comprised mainly of value added taxes repayable to the Company in South Africa. Accounts
payable consisted primarily of Waterberg engineering fees, accrued professional fees and
regular trade payables.
Total expenditures on the Waterberg Project, before partner reimbursements, for the nine
month period were approximately $ 2.6 million (May 31, 2021 - $1.9 million). At May 31,
2022, $43.4 million in accumulated net costs had been capitalized to the Waterberg Project.
Total expenditures on the property since inception from all investor sources to May 31, 2022,
are approximately $80.8 million.
For more information on mineral properties, see Note 3 of the Financial Statements.
Outlook
The Company’s key business objective is to advance the Waterberg Project to a development
and construction decision. PTM is the operator of the Waterberg Project as directed by a
technical committee comprised of representatives from joint venture partners Impala
Platinum Holdings Ltd. (“ Implats”), Mnombo Wethu Consultants (Pty) Ltd. (“ Mnombo”),
JOGMEC and Hanwa. Before project financing and a construction decision can be undertaken,
arrangements will be required for project concentrate offtake or processing.
A Waterberg JV Co. budget in the amount of R40 million (approximately $2.7 million) for the
fiscal period ending August 31, 2022 , was approved by the partners to the joint venture on
March 9, 2022 . The Company is working to advance project permitting, engineering,
infrastructure servitudes , surface access and community relationships. The Company
continues to work closely with regional and local communities and their leadership on mine
development plans to achieve optimal outcomes and best value to all stakeholders.
PLATINUM GROUP METALS LTD. …4
The Company is considering commercial alternatives for mine development, financing and
concentrate offtake. Studies to assess the economic feasibility of constructing a dedicated
Waterberg matte furnace to process Waterberg concentrate as an alternative to a traditional
concentrate offtake arrangement are underway. The NI 43-101 definitive feasibility study
technical report for the Waterberg Project entitled “Independent Technical Report, Waterberg
Project Definitive Feasibility Study and Mineral Resource Update, Bushveld Complex, South
Africa” dated October 4, 2019 , stated that “Additional smelting capacity may need to be
constructed in the industry to be able to treat the flotation concentrate from Waterberg and
the other potential Platreef miners. ” Discussions with potential pa rticipating partners in a
possible matte furnace facility are in process . Parallel d iscussions are also underway with
South African smelter operators considering concentrate offtake arrangements for the project.
Implats currently holds a right of first refusal to match concentrate offtake terms offered to
Waterberg JV Co. by bona fide third parties (the “Offtake ROFR”). Processing of Waterberg
concentrate through a matte furnace owned by Waterberg JV Co. or by one or more of the
Waterberg JV partners would not be subject to the Offtake ROFR as such an entity would not
be a “bona fide third party”. Any transaction between Waterberg JV Co. involving one or
more shareholders must be entered into on a bona fide arms-length basis and for fair value.
Under the terms of the Waterberg JV Co. shareholders agreement, Hanwa holds the exclusive
right to purchase or direct the sale of all or part of the Waterberg Project concentrate or metal
contained therein.
The market for PGMs has generally improved over the last several years resulting in higher
4E metal basket prices. Supply chain disruptions resulting from the global COVID pandemic
and exacerbated by the Ukraine conflict continue to negatively impact global auto production.
Notwithstanding weak auto demand, PGM prices have been supported by geopolitical tensions
with the threat of Russian PG M exports being cut or sanctioned, representing a significant
supply risk. Resolution of the conflict could remove price support. Visibility on the resolution
of supply chain issues is difficult to predict but PG M prices could strengthen in the medium
term based on pent up auto demand once auto production normalizes. Major South African
PGM producers have recently announced wage settlement agreements . Supply risk, due to
union strike action at present appears to be unlikely. T he projected market penetration of
battery electric vehicles in the future could soften the market for palladium in the longer term
as demand for internal combustion engines with catalytic converters is potentially reduced.
Other metals to be produced at Waterberg, being platinum, rhodium, gold, copper and nickel,
are expected to see strong demand and prices in the longer term.
As the world seeks to decarbonize and look for solutions to climate change, the unique
properties of PGMs as powerful catalysts are being applied to various technologies as possible
solutions for more efficient energy generation. The Company’s battery technology initiative
through Lion with partner Anglo represents a new opportunity in the high -profile lithium
battery research an d innovation field. The investment in Lion creates a potential vertical
integration with a broader industrial market development strategy to bring new technologies
to market which use palladium and platinum. Research and development efforts by FIU on
behalf of Lion continue. Technical results from Lion’s research may have application to most
lithium-ion battery chemistries and the scope of Lion’s research work is being expanded.
Senior officers of the Company and A nglo recently spent a day together at FIU to review
PLATINUM GROUP METALS LTD. …5
progress by the Lion research team and to discuss possible future commercialization of Lion’s
patented technology.
Environmental, Social and Governance
In late 2021, Platinum Group submitted its inaugural Environmental, Social and Governance
(“ESG”) disclosure submission with Digbee Ltd. (“ Digbee”), a United Kingdom based
company with a mining-focused expert network and ESG disclosure platform aimed at
facilitating improved disclosure and better access to capital markets for mining companies
with strong ESG practices. Digbee has been endorsed by leading financial firms such as
Blackrock, BMO, and Dundee Corporation. Digbee’s reporting framework is aligned with global
standards, including the Equator Principles, which provide a fram ework for financial
institutions to assess environmental and social risks in projects. For more details refer to the
Company’s 2021 Form 20-F and Annual Information Form (“AIF”). As well as the discussions
within this news release, the reader is encouraged to also see the Company’s disclosure made
under the heading “Risk Factors” in the Company’s 2021 Form 20-F and AIF.
Qualified Person
Rob van Egmond, P.Geo., a consultant geologist to the Company and a former employee, is
an independent qualified person as defined in National Instrument 43 -101 Standards of
Disclosure for Mineral Projects (“NI 43-101”). Mr. van Egmond has reviewed, validated and
approved the scientific and technical information contained in thi s news release and has
previously visited the Waterberg Project site.
About Platinum Group Metals Ltd. and the Waterberg Project
Platinum Group Metals Ltd. is the operator of the Waterberg Project, a bulk underground
palladium and platinum deposit located in South Africa. The Waterberg Project was
discovered by Platinum Group and is being advanced by Waterberg JV Co.
On behalf of the Board of
Platinum Group Metals Ltd.
Frank R. Hallam
President, CEO and Director
For further information contact:
Kris Begic, VP, Corporate Development
Platinum Group Metals Ltd., Vancouver
Tel: (604) 899-5450 / Toll Free: (866) 899-5450
www.platinumgroupmetals.net
Disclosure
The TSX and the NYSE American have not reviewed and do not accept responsibility for the
accuracy or adequacy of this news release, which has been prepared by management.
The COVID-19 pandemic and related measures taken by governments create uncertainty and have
had, and may continue to have, an adverse impact on aspects of the Company’s business,
including employee health, workforce productivity and availability, travel restrictions, contractor
PLATINUM GROUP METALS LTD. …6
availability, supply availability, the Company’s ability to maintain its controls and procedures
regarding financial and disclosure matters and the availability of capital and insurance and the
costs thereof, some of which, individually or when aggregated with other impacts, may be material
to the Company. Effective April 5, 2022, South Africa lifted its National State of Disaster declared
in relation to the COVID-19 Pandemic and moved to reduce COVID-19 restrictions to below Alert
level 1, its lowest level of alert . In response to uncertainty caused by the COVID-19 pandemic,
the Company has implemented additional testing and monitoring protocols for its work at the
Waterberg Project site and elsewhere in South Africa.
This news release contains forward-looking information within the meaning of Canadian securities
laws and forward -looking statements within the meaning of U.S. securities laws (collectively
“forward-looking statements”). Forward-looking statements are typically identified by words such
as: “believe”, “expect”, “anticipate”, “intend”, “estimate”, “may”, “plans”, “postulate” and similar
expressions, or are those, which, by their nature, refer to future events. All statements that are
not statements of historical fact are forward -looking statements. Forward-looking statements in
this news release include, but are not limited to, statements the success of the Company’s
objective to advance the Waterberg Project to a development and construction decision, the
outcome of Africa Wide’s appeal to the High Court’s judgment, the plan for and development of
the Waterberg Project and the potential benefits and results thereof, financing and mine
development of the Waterberg Project, potential commercial alternatives for mine development
financing and concentrate offtake, financing and mine development of the Waterberg Project, the
size and cost of the Waterberg Project, Implats’ decision to exercise its right of first refusal with
respect to concentrate offtake, the economic feasibility of establishing a dedicated Waterberg
matte furnace, work with local communities, the development of new battery technologies and
the potential benefits of utilizing palladium and platinum therein, the commercialization thereof,
potential vertical integration with a broader industrial market development strategy, providing
shareholder value, and Lion’s development of next generation battery technology, a return to
strength in the market for PGMs, the success of Lion’s and FIU’s research and development efforts,
the expansion of Lion’s research work into additional battery chemistries, the Company’s ability
to better access capital markets due to its ESG practices, the outcome of the Company’s pre -
construction drill programme at the Waterberg Project, the ability of the Company to obtain all
required permitting, surface access, and infrastructure servitudes, the low risk of union strike
action, the projections of the market and prices for PGEs the recovery of the car sales market, the
effect of battery electric vehicles on the market for palladium, the use of PG Ms in solutions to
climate change, and the Company’s other future plans and expectations. Although the Company
believes any forward -looking statements in this news release are reasonable, it can give no
assurance that the expectations and assumptions in such statements will prove to be correct.
The Company cautions investors that any forward -looking statements by the Company are not
guarantees of future results or performance and that actual results may differ materially from
those in forwa rd-looking statements as a result of various factors, including possible adverse
impacts due the global outbreak of COVID -19 (as described above), the Company’s inability to
generate sufficient cash flow or raise additional capital, and to comply with the terms of any new
indebtedness; additional financing requirements; and any new indebtedness may be secured,
which potentially could result in the loss of any assets pledged by the Company; the Company’s
history of losses and negative cash flow; the Company’ s ability to continue as a going concern;
the Company’s properties may not be brought into a state of commercial production; uncertainty
of estimated production, development plans and cost estimates for the Waterberg Project;
discrepancies between actual a nd estimated mineral reserves and mineral resources, between
actual and estimated development and operating costs, between actual and estimated
metallurgical recoveries and between estimated and actual production; fluctuations in the relative
values of the U.S. Dollar, the Rand and the Canadian Dollar; volatility in metals prices; the
uncertainty of alternative funding sources for Waterberg JV Co.; the Company may become subject
to the U.S. Investment Company Act; the failure of the Company or the other sha reholders to
fund their pro rata share of funding obligations for the Waterberg Project; any disputes or
disagreements with the other shareholders of Waterberg JV Co. or Mnombo; the ability of the
PLATINUM GROUP METALS LTD. …7
Company to retain its key management employees and skilled and experienced personnel;
conflicts of interest; litigation or other administrative proceedings brought against the Company;
actual or alleged breaches of governance processes or instances of fraud, bribery or corruption;
exploration, development and mini ng risks and the inherently dangerous nature of the mining
industry, and the risk of inadequate insurance or inability to obtain insurance to cover these risks
and other risks and uncertainties; property and mineral title risks including defective title to
mineral claims or property; changes in national and local government legislation, taxation,
controls, regulations and political or economic developments in Canada and South Africa;
equipment shortages and the ability of the Company to acquire necessary ac cess rights and
infrastructure for its mineral properties; environmental regulations and the ability to obtain and
maintain necessary permits, including environmental authorizations and water use licences;
extreme competition in the mineral exploration industry; delays in obtaining, or a failure to obtain,
permits necessary for current or future operations or failures to comply with the terms of such
permits; risks of doing business in South Africa, including but not limited to, labour, economic and
political instability and potential changes to and failures to comply with legislation; the Company’s
common shares may be delisted from the NYSE American or the TSX if it cannot maintain
compliance with the applicable listing requirements; and other risk factors described in the
Company’s most recent Form 20-F annual report, AIF and other filings with the SEC and Canadian
securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively.
Proposed changes in the miner al law in South Africa if implemented as proposed would have a
material adverse effect on the Company’s business and potential interest in projects. Any forward-
looking statement speaks only as of the date on which it is made and, except as may be required
by applicable securities laws, the Company disclaims any intent or obligation to update any
forward-looking statement, whether because of new information, future events or results or
otherwise.
The technical and scientific information contained herein has been prepared in accordance with NI
43-101, which differs from the standards adopted by the SEC. Accordingly, the technical and
scientific information contained herein, including any estimates of mineral reserves and mineral
resources, may not be comparable to similar information disclosed by U.S. companies subject to
the disclosure requirements of the SEC.