APRIL 22, 2022

NEWS RELEASE

PERSEUS MINING LIMITED

Level 2, 437 Roberts Road, Subiaco WA 6008

ABN: 27 106 808 986

1

UPDATE TO NKOSUO DRILLING COMPLETION NEWS RELEASE

Perth, Western Australia/April 22, 2022/ Perseus Mining Limited (PRU) wishes to provide a correction to

the news release ‘Perseus Completes Resource Drilling Programme at Nkosuo’ dated 20 April 2022. The

updated release corrects a small number of typographical errors included in the data in Appendix 2.

This announcement was approved for release by Perseus Mining Limited Managing Director and Chief

Executive Officer, Jeff Quartermaine.

20 APRIL 2022

NEWS RELEASE

PERSEUS MINING LIMITED

Level 2, 437 Roberts Road, Subiaco WA 6008

ABN: 27 106 808 986

1

PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME AT NKOSUO

Perseus Mining Limited (ASX/TSX: PRU) is pleased to report details of its recently completed resource drilling

program at the Nkosuo prospect, located 7 km from its Edikan Gold Mine in Ghana. Preparation of a maiden

Mineral Resource Estimate for the deposit has begun and is due for completion by the end of the June 2022

Quarter.

HIGHLIGHTS

• Perseus records further impressive drilling results from the Nkosuo prospect on the Agyakusu Prospecting Licence,

located within comfortable trucking distance of the processing facility at the Edikan Gold Mine in Ghana.

• Resource definition drilling over the northern part of the deposit is now complete and work has begun on the

estimation of a maiden Mineral Resource estimate for Nkosuo. This is due to be completed by the end of the June

2022 quarter.

• Results continue to demonstrate strong potential for shallow, granite-hosted open-pitable gold resources, with:

- NKS0048RD: 2.5m @ 87.3 g/t Au from 250.5m

- NKS0056DD: 30.2m @ 1.68 g/t Au from 102.34m and 12.2m @ 8.03 g/t Au from 136.5m

- NKS0100RC: 9m @ 13.93 g/t Au from 15m

- NKS0117RC: 22m @ 3.92 g/t Au from 8m

- NKS0120RC: 16m @ 4.17g/t Au from 24m

- NKS0142RC: 10m @ 3.65 g/t Au from 36m

- NKS0153RC: 7m @ 6.05g/t Au from 33m and 14m @ 7.72g/t Au from 44m

- NKS0164RC: 6m @ 6.71g/t Au from 16m and 22m @ 1.48g/t Au from 28m

- NKS0170RC: 43m @ 2.55 g/t Au from 7m and 39m @ 2.97 g/t Au from 56m

- NKS0175RD: 5m @ 24.74 g/t Au from 131m

- NKS0178RD: 14m @ 9.14 g/t Au from 2m, 30m @ 1.14 g/t Au from 20m and 48m @ 1.06 g/t Au from 66m

- NKS0214RC: 10m @ 7.49 g/t Au from 26m

• Results further confirm that the Nkosuo prospect hosts near-surface, granite-hosted gold mineralisation similar to

that mined in Edikan’s Fobinso and Abnabna (“AG”) pits.

• Mineralisation and granite host remain open to the south.

• Nkosuo discovery has the potential to extend Edikan’s mine life beyond forecast end in FY2026-2027.

2

NEWS RELEASE | PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME

AT NKOSUO

PERSEUSMINING.COM

Perseus’s Managing Director and CEO Jeff Quartermaine said:

“As Perseus works towards consolidating our position as a reliable 500,000oz per year gold producer, our near-mine

exploration drilling programmes are consistently delivering results that are aligned with this aim.

The drilling programme at Nkosuo has returned impressive results that demonstrate that the deposit has the potential

to materially add to Edikan’s mine life. We are particularly encouraged by similarities between the Nkosuo deposit and

the Fobinso and Abnabna deposits that we’ve already successfully developed, mined and processed at Edikan.

“While we are working towards completing a maiden Mineral Resource estimate for Nkosuo in the current quarter, we

note that Nkosuo is just the first of several interesting targets located on the Agyakusu Exploration Licence. Perseus

intends to continue exploring on each of the Agyakusu, Agyakusu-DML and Domenase exploration licence areas, all of

which are under option to Perseus and all of which are located within comfortable trucking distance of our Edikan

mill.”

NKOSUO EXPLORATION DRILLING

Results from Perseus’s recent exploration activities at the Nkosuo project adjacent to its Edikan Gold Mine (Edikan) in

Ghana continue to confirm the outstanding potential to grow its gold inventory at Edikan through further drilling

success.

Perseus secured an option to acquire the 23.85km2 Agyakusu prospecting licence (Appendix 1 - Figure 1.1), currently

held by Ghanaian company Adio-Mabas Ghana Ltd, in November 2019 (see New Release 4 November 2019).

Exploration drilling commenced at the Nkosuo prospect on the Agyakusu PL on 1 July 2021 , with the first highly

encouraging results being reported last year (News Release dated 13 October 2021), and further updated in January

2022 (News Release 18 January 2022).

Perseus has drilled a total of 36,895 metres in 97 Reverse Circulation (“RC”), 19 diamond (“DD”) holes and 103 RC pre-

collared diamond holes (“RD”). Drilling was initially conducted on a nominal 80 x 80 metre grid to scope out the extent

and overall geometry of the ho st granite and contained mineralisation, subsequently infilled to 40 x 20 metres over

the main mineralised zones to provide the basis for a mineral resource estimate.

Mineralisation at Nkosuo is hosted by a n elongated NNE-trending granitic plug extending at least 1.2 kilometres in

strike, with widths ranging from ~120 metres in the northern part to up to 160 metres in the southern part . The

northern part of the intrusive body is dislocated by a sinuous NW-SE fault that offsets the northern 400 metres of the

body ~160 metres to the northwest (Appendix 1 - Figure 1.2).

The strongest mineralisation is contained in the offset northern part of the intrusion and the northern central section

of the southern part of the intrusion, gradually waning to the southwest . The granite body dips at around 70 0 to the

west in the northern part of the intrusion, steepening to near vertical towards the south. Mineralisation within the

granite consists of variably intense quartz stockwork veining with associated quartz-carbonate-sericite alteration. The

veining and alteration are accompanied by 1-2% disseminated and selvage pyrite and arsenopyrite, with b etter gold

grades generally associated with higher concentrations of arsenopyrite.

The granite remains open to the south, with indications from surface workings that mineralisation may strengthen

within the southern apex of the intrusion, analogous to the situation in the northern apex.

Better intercepts from the Nkosuo drilling between 8 January and the completion of drilling on 28 March 2022 are

shown below in Appendix 2 - Table 1 and on Appendix 1 – Figure 1.2, with a complete summary included in Appendix

2 - Table 2. Representative sections are presented in Appendix 1 – Figures 1.3 to 1.5.

Results available to date from the Nkosuo drilling confirm Perseus’s previously declared potential for an Exploration

Target of 10Mt to 15 Mt grading 0.9 to 1.1 g/t gold for 275 to 500koz contained gold (News Release dated 13 October

2021). Current indications are that the bulk of this resource will be at depths shallower than 150 metres.

The Exploration Target is conceptual in nature and takes no account of geological complexity, possible mining method

or metallurgical recovery factors. The Exploration Target was estimated to enable an early assessment of the

discovery’s potential to add to Edikan’s mine life.

3

NEWS RELEASE | PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME

AT NKOSUO

PERSEUSMINING.COM

The potential quantity and grade of the Exploration Target is conceptual in nature and therefore is an approximation.

There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will

result in estima tion of a Mineral Resource. The Exploration Target has been prepared and reported in accordance

with the 2012 edition of the JORC Code and NI 43-101.

The Exploration Target is defined by:

• A wireframe of the host granite body used to limit the extent of interpreted mineralisation volume.

• Drill sample intervals composited to uniform 2 metre down-hole lengths with composite gold grades capped at

10g/t.

• Gold grades estimated by inverse distance squared weightings (IDW) into parent blocks with dimensions 20

metres east x 20 metres north x 10 metres elevation using a 50 metres east x 100 metres north x 100 metre

elevation search ellipsoid with a minimum of four samples required to make an estimate.

• Estimates informed only by samples within the granite.

• Parent blocks sub-blocked against the granite wireframe and interpreted weathering surfaces using a minimum 5

metres east x 5 metres north x 2.5 metres elevation sub-block to reliably estimate the mineralisation volume.

• Densities for weathered, transition and fresh rock assumed to be 1.8, 2.1 and 2.7 tonnes per cubic metre.

• Sub-blocks grading greater than 0.4g/t gold and to a maximum vertical depth of approximately 170 metres.

NEXT STEPS

• Results from the recent drilling will form the basis for a Mineral Resource Estimate to be completed during the June

2022 quarter.

• Metallurgical testwork is underway and geotechnical drilling has been undertaken to support studies into the Ore

Reserve potential, expected to be completed early in the September Quarter of 2022.

• In anticipation that this work will lead to a positive outcome, Perseus has exercised its option over the Agyakusu

permit, with the permit transfer currently awaiting Ministerial approval.

• Baseline studies to meet the requirements of the ESIA process have also commenced.

• Future drilling will focus on defining the southern extent of the granite and its contained mineralisation.

• Exploration more broadly at Edikan will investigate high -order prospects on the adjacent Ag yakusu DML and

Domenase permits where soil geochemical sampling has identified strong gold-in-soil anomalies associated with

mineralised granites.

This announcement has been approved for release by Perseus’s Managing Director and Chief Executive Officer, Jeff

Quartermaine.

4

NEWS RELEASE | PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME

AT NKOSUO

PERSEUSMINING.COM

COMPETENT PERSON STATEMENT:

The information in this report and the attachments that relate to exploration drilling results and the Nkosuo Exploration Target on the

Agyakusu permit is based on, and fairly represents, informati on and supporting documentation prepared by Dr Douglas Jones, a

Competent Person who is a Chartered Professional Geologist. Dr Jones is the Group General Manager Exploration of the Company. Dr

Jones has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the

activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of

Exploration Results, Mineral Resources and Ore Reserves’”) and to qualify as a “Qualified Person” under National Instrument 43-101

– Standards of Disclosure for Mineral Projects (“NI 43-101”). Dr Jones consents to the inclusion in this report of the matters based on

his information in the form and context in which it appears.

CAUTION REGARDING FORWARD LOOKING INFORMATION:

This report contains forward -looking information which is based on the assumptions, estimates, analysis and opinions of

management made in light of its experience and its perception of tren ds, current conditions and expected developments, as well

as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that

such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among

other things: the price of gold, continuing commercial production at the Yaouré Gold Mine, Edikan Gold Mine and Sissingué Gol d

Mine without any major disruption due to the COVID -19 pandemic or otherwise, the receipt of required governmental approvals,

the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner

and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the

foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management

believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there

can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known

and unknown risks, uncertainties, and other factors which may cause the actual resul ts, performance or achievements of the

Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such

forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current

exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as we ll as

those factors disclosed in the Company's publicly filed documents. The Company believ es that the assumptions and expectations

reflected in the forward -looking information are reasonable. Assumptions have been made regarding, among other things, the

Company’s ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold,

the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain fina ncing

as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus

does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

ASX/TSX CODE: PRU

REGISTERED OFFICE:

Level 2

437 Roberts Road

Subiaco WA 6008

Telephone: +61 8 6144 1700

Email: [email protected]

ABN: 27 106 808 986

www.perseusmining.com

CONTACTS:

Jeff Quartermaine

Managing Director & CEO

[email protected]

Nathan Ryan

Media Relations

+61 4 20 582 887

[email protected]

Claire Hall

Corporate Communications

[email protected]

5

NEWS RELEASE | PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME

AT NKOSUO

PERSEUSMINING.COM

APPENDIX 1 - FIGURES

Figure 1.1: Edikan Gold Project – Regional Geology, Tenements, Deposits and Prospects

6

NEWS RELEASE | PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME

AT NKOSUO

PERSEUSMINING.COM

Figure 1.2: Nkosuo Prospect – Drilling and Selected Results. Locations of Sections 1-3 shown.

7

NEWS RELEASE | PERSEUS COMPLETES RESOURCE DRILLING PROGRAMME

AT NKOSUO

PERSEUSMINING.COM

Figure 1.3: Nkosuo Prospect – Drill Section 1 – 20,160N Local Grid showing selected recent intercepts.

Figure 1.4: Nkosuo Prospect – Drill Section 2 – 20,080N Local Grid showing selected recent intercepts