Perseus Increases Edikan’S Inventories of Mineral Resources and ORE Reserves

Resource Estimates

JULY 19, 2022

NEWS RELEASE

PERSEUS MINING LIMITED

Level 2, 437 Roberts Road, Subiaco WA 6008

ABN: 27 106 808 986

1

PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

Perth/Western Australia/ July 19, 2022/ Perseus Mining Limited (ASX/TSX: PRU) has completed a Feasibility Study on

the Nkosuo Project, located approximately seven kilometres north-northwest of its Edikan Gold Mine in Ghana, adding

substantial Mineral Resources and Ore Reserves to Edikan’s previously published inventory.

HIGHLIGHTS

• Indicated Mineral Resources1 at Nkosuo amount to 14.5Mt at 0.91g/t for 422,000 ounces of contained gold, and

Inferred Mineral Resources are estimated at 0.95 million tonnes grading 0.90 g/t gold containing 27,000 ounces of

gold at 30 June 2022.

• Probable Ore Reserves1 total 10 million tonnes of ore grading 1.04g/t gold and containing 332,000 ounces of gold.

• Planned processing of the Nkosuo Ore Reserves in the Edikan mill is expected to increase the life of the Edikan

operation by 18 to 24 months, extending the mine life to FY2027.

Nkosuo Measured and Indicated Mineral Resources as at 30 June 2022

PROJECT DEPOSIT

TYPE

MEASURED RESOURCES INDICATED RESOURCES MEASURED + INDICATED

RESOURCES

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Nkosuo1 - - - 14.5 0.91 422 14.5 0.91 422

Total - - - 14.5 0.91 422 14.5 0.91 422

1 Refer to Notes in the individual tables of Mineral Resources and Ore Reserves.

Nkosuo Proved and Probable Ore Reserves as at 30 June 2022

DEPOSIT DEPOSIT

TYPE

PROVED PROBABLE PROVED + PROBABLE

Quantity

Mt

Grade

g/t gold

Gold

‘000 oz

Quantity

Mt

Grade

g/t gold

Gold

‘000 oz

Quantity

Mt

Grade

g/t gold

Gold

‘000 oz

Nkosuo1 - - - 10.0 1.04 332 10.0 1.04 332

Total - - - 10.0 1.04 332 10.0 1.04 332

1 Refer to Notes in the individual tables of Mineral Resources and Ore Reserves.

Perseus’s Managing Director and CEO Jeff Quartermaine said:

“The addition of Mineral Resources and Ore Reserves from the Nkosuo Project adds significantly to the mine life at

Edikan Gold Mine, ensuring operations can continue while Perseus conducts further exploration on the recently

acquired Agyakusu Exploration Permit and two other adjoining Exploration Permits that are under option to Perseus.

We believe that the discovery of additional Ore Reserves in trucking distance of existing infrastructure is the most cost

effective means available to Perseus of creating value for shareholders. With this objective, further exploration on the

nearby tenements will be well funded by Perseus and we are optimistic of discovering further deposits of a similar scale

to Nkosuo that will further add to the mine life of the Edikan operation.”

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

2

OVERVIEW OF NKOSUO

Nkosuo is located in Ghana, West Africa, approximately 40 kilometres southwest of the regional town of Obuasi, 200

kilometres west-northwest of the capital Accra and seven kilometres to the north-northwest of Perseus’s Edikan Gold

Mine near the town of Ayanfuri.

A Feasibility Study has been completed on the development of mineralisation discovered by Perseus at Nkosuo

resulting in the estimation of an Ore Reserve of 332,000 ounces (contained) producing 272,000 ounces (recovered)

over three years of mining. All in site costs (AISCs) are expected to be in the range of US$870-US$890 per ounce for

Nkosuo.

The area of the Nkosuo Project is underlain principally by Paleoproterozoic Birimian flysch-type metasediments

consisting of dacitic volcaniclastics, greywackes plus argillaceous (phyllitic) sediments, intensely folded, faulted and

metamorphosed to upper greenschist facies. Numerous small “Basin-type” or “Cape Coast-type” granite bodies have

intruded the sediments along several regional structures.

The Nkosuo Project comprises mineralisation hosted by a single north-northeast striking granitoid body measuring at

least 600 metres along strike, typically 250 metres horizontal width and dipping approximately 75 degrees toward

west-northwest.

Nkosuo will be mined in a single open pit, with a waste dump located to the west of the pit as shown in Figure 1. Ore

from the pit will be trucked on a dedicated haul road to the Edikan processing plant for co-processing with ores from

existing Edikan open pits and stockpiles.

Figure 1: Nkosuo Project Layout

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

3

MINERAL RESOURCE ESTIMATE S

The Mineral Resource estimates are reported in accordance with the 2012 Australasian Code for Reporting of

Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). The classification categories of Measured,

Indicated and Inferred under the JORC Code are equivalent to the CIM categories of the same names (CIM, 2014).

For a comprehensive description of the Nkosuo Mineral Resource estimates, refer to the JORC tables included in

Appendix 1. The currently estimated Mineral Resources at Nkosuo are summarised in Table 1 and 2 below.

Table 1: Nkosuo Measured and Indicated Mineral Resources –30 June 2022 1,2

PROJECT DEPOSIT

TYPE

MEASURED RESOURCES INDICATED RESOURCES MEASURED + INDICATED

RESOURCES

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Nkosuo 3,4 Open Pit - - - 14.5 0.91 422 14.5 0.91 422

Total - - - 14.5 0.91 422 14.5 0.91 422

Table 2: Nkosuo Inferred Mineral Resources – 30 June 2022 2

PROJECT DEPOSIT

TYPE

INFERRED RESOURCES

Quantity

Mt

Grade

g/t gold

Gold

'000 oz

Nkosuo 3,4 Open Pit 0.95 0.9 27

Total 0.95 0.9 27

Notes:

1. Indicated Mineral Resources are inclusive of Ore Reserves.

2. Rounding of numbers to appropriate precisions may have resulted in apparent inconsistencies.

3. Based on June 2022 Mineral Resource model constrained to US$1,800/oz pit shell.

0.3g/t gold cut-off applied to in situ material.

GEOLOGY

The Nkosuo project is an addition to the Edikan group of gold deposits that occur near the western flank of the

Ashanti Greenstone Belt in south-western Ghana. The regional geology of the Edikan property is underlain principally

by Paleoproterozoic Birimian metasediments of the Kumasi-Afema basin, positioned between the Ashanti and Sefwi

Greenstone Belts.

Nkosuo is a granite -hosted orogenic gold deposit with structurally controlled mineralisation occurring with

disseminated pyrite-arsenopyrite mineralisation associated with quartz veining and sericite alteration within the

granite. The surrounding metasedimentary rocks are almost entirely devoid of mineralisation.

The granitoid body at Nkosuo hosting the gold mineralisation strikes north-northeast with an identified length of 600

metres along strike and typically 250 metres in horizontal width that dips 75 degrees towards the west -northwest.

Drilling has confirmed that the granitoid body is continuous to at least 350 metres vertical depth below surface. The

entire granite is not mineralised throughout but drilling to date indicates substantial zones of gold mineralisation up

to 100 metres horizontal width.

DRILLING TECHNIQUES

Nkosuo Mineral Resources are delineated by 222 drill holes for a total of 36,982 metres comprised of reverse

circulation (“RC”) and diamond core drill holes drilled by Perseus since 2021. The global Nkosuo Mineral Resource

estimates are informed entirely by Perseus drilling with a breakdown by sample type of 43% RC and 57% diamond.

This ratio changes for the Mineral Resource constrained within the US$1,800 pit optimisation to 22% RC and 77%

diamond. RC drilling used face-sampling hammers with 139-millimetre hole diameter and the diamond core was HQ

in the weathered material which changed to NQ2 in the fresh material.

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

4

Drill hole collar locations have been surveyed by qualified surveyors. Both RC and diamond core holes were down -

hole surveyed at nominal 30 metre intervals.

Orientation of most drill holes at Nkosuo is approximately perpendicular to the strike of mineralisation. Drilling has

occurred at 20 metres spacing on 40 metre spaced traverses with holes generally dipping at -55 degrees towards 119

degrees azimuth with partial infill to 20 metres by 20 metres in places. Drill coverage generally extends to about 150

metres vertical depth and to a maximum depth of about 380 metres.

SAMPLING

RC drill samples were collected at drill sites at 1 metre intervals and split using multi -stage riffle splitters. For the

majority of Perseus’s drilling, each two consecutive samples were composited into one sample for assaying. Sample

weights were nominally 2.5 kilograms and 5 kilograms for 1 metre and 2 metre samples respectively.

Diamond core was sawn in half using a diamond blade saw, with the right -hand half sent for assaying and the left -

hand half stored in core trays for reference. Samples were normally taken at 1 metre intervals.

RC drill samples were logged visually for recovery, sample condition (i.e., dry, damp, wet) and contamination. Sample

condition logs are available for 96% of RC samples within the mineralised granite. Recovered sample weight s are

available for 64% of RC samples and RC sample recoveries ranged from an estimated 46% for highly weathered to

80% for fresh material. Diamond core recoveries were measured linearly per drill run. Core recoveries averaged 67%

in weathered materials an d 98% in fresh rock. There is no indication of a relationship between gold grades and

RC/Diamond sample recoveries.

SAMPLE ANALYTICAL METHODS

All sample preparation and assaying was carried out by commercial laboratories; no sample preparation was

undertaken by Perseus. Preparation of core and RC samples followed a standard path of drying at 105 degrees Celsius

for at least 12 hours, crushing the entire sample to 85% passing -2 millimetres and grinding a 1.5 kilogram split to

85% passing 75 microns. 300gram pulp subsamples are selected by multiple scoop passes.

All RC and diamond core samples have been assayed by 50-gram fire assay with AAS determination by Intertek Testing

Services Ghana at their Tarkwa assay laboratory. The technique is considered a total extraction technique

Perseus’s quality assurance and quality control “QAQC” procedures included submission of coarse blanks inserted at

1 in 20, certified reference standards at 1 in 20, internal laboratory standards, duplicates and repeats .

ESTIMATION METHODOLOGY – OPEN PIT MINERAL RESOURCES

Mineral Resources were estimated by Multiple Indicator Kriging (“MIK”) of 2 metre down -hole composited gold

grades from RC and diamond drilling . Compositing and wireframing were performed using Micromine software.

Exploratory data analysis, variogram calculation and modelling, and resource estimation were performed using FSSI

Consultants (Australia) Pty Ltd (FSSI) GS3M software.

A total of 10 holes were excluded from the estimate due to hole twinning to prevent clustering effects in the

estimates which represented approximately 3% of the mineralised domain composites being excluded.

Mineralised domains used for resource estimation delineate zones within which the tenor and spatial trends of

mineralisation are similar. Sample data were also separated into sub -domains representing weathering horizons

using surfaces provided by Perse us. Grade continuity was characterised by indicator variograms modelled at 14

indicator thresholds. At Nkosuo, class grades were derived from class mean grades with the exception of upper bin

grades which were derived from class medians.

The above approaches to treatment of high grades reduces the impact of small numbers of extreme grades on

estimates of resources.

At Nkosuo, Mineral Resources were estimated into panels with dimensions 2 0 metres x 20 metres x 5 metres (X, Y,

Z), approximating the drill hole spacing in the closer spaced parts of the drill pattern.

The estimates include variance adjustments to provide estimates of recoverable resources expected to be

recoverable by open pit mining on the scale presently practiced at Edikan.

CRITERIA FOR RESOURCE CLASSIFICATION

Nkosuo estimates were classified as Indicated and Inferred based on the data collected (geology, survey and assaying

data), the density of data, and the confidence in the geological model and mineralisation model. Indicated resources

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

5

are informed by drilling spaced at up to 40 metres by 40 metres and Inferred resources are on the peripheries of

drilling out to a maximum distance of approximately 40 metres from drilling.

CUT-OFF GRADE

The cut-off grade of 0. 3g/t gold for the stated open pit Mineral Resource estimates reflects economic parameters

deriving from current and anticipated mining practices at Nkosuo and a gold price of US$1,800/oz.

REASONABLE PROSPECTS FOR EVENTUAL ECONOMIC EXTRACTION

Mineral Resources are reported within an optimal pit shell generated using cost and revenue parameters in the

Nkosuo Feasibility Study and a gold price of US$1,800/oz.

ORE RESERVE ESTIMATE

The Ore Reserve is summarised below in Table 3 and is based on the Nkosuo Mineral Resources as at 30 June 2022.

Ore Reserves are reported in accordance with the JORC Code and are reported by category, deposit and type, above

variable cut-off grades. The classification categories of Proved and Probable under the JORC Code are equivalent to the

CIM Proven Mineral Reserve and Probable Mineral Reserve categories respectively (CIM, 2010). Appendix 1 provides

the JORC Table 1 criteria for the Nkosuo Ore Reserves.

The Probable Ore Reserves for Nkosuo are estimated as 10.0 Mt grading 1.04 g/t gold, containing 332,000 ounces

of gold, with no Proved Ore Reserves currently identified.

Table 3: Nkosuo Proved and Probable Ore Reserves as at 30 June 2022

DEPOSIT DEPOSIT

TYPE

PROVED PROBABLE PROVED + PROBABLE

Quantity

Mt

Grade

g/t gold

Gold

‘000 oz

Quantity

Mt

Grade

g/t gold

Gold

‘000 oz

Quantity

Mt

Grade

g/t gold

Gold

‘000 oz

Nkosuo1,2,3,4 Open Pit - - - 10.0 1.04 332 10.0 1.04 332

Total - - - 10.0 1.04 332 10.0 1.04 332

Notes:

1. Based on Mineral Resource Estimates which were current at 30 June 2022.

2. Variable gold grade cut-off for each material type, ranging from 0.35 g/t to 0.45 g/t.

3. Inferred Mineral Resource is considered as waste.

4. Rounding of numbers to appropriate precisions may have resulted in apparent inconsistencies.

ECONOMIC ASSUMPTIONS

• Gold metal price US$1,300/oz.

• Un-escalated average costs used in optimising pit designs are as shown in Table 4 below.

• A discount rate of 10% (real) has been assumed to calculate net present values of forecast cash flows.

Table 4: Assumed average operating costs

• MINING (OPEN PIT) • PROCESSING • G&A • SELLING • ROYALTIES

US$3.61t/mined US$8.67/milled US$2.31t/milled US$2.24/oz sold 6.5%1

Notes:

1. Royalties are 6.5% plus an additional $2/Reserve oz discovery bonus payable to Adio Mabas Group.

OPEN PIT MINING PARAMETERS

• The chosen method for the Open Pit Reserves is conventional open pit mining utilising hydraulic excavators

and trucks, mining bench heights of 5 metres with 2.5 metre flitches to minimise ore loss and waste rock

dilution.

• The economic pit shell was defined using Whittle pit optimisation software (“Whittle”) with inputs such as

geotechnical parameters, metallurgical recovery and mining costs.

• The pit optimisation was run with revenue generated only by Measured and Indicated Mineral Resources. No

value was allocated to Inferred Mineral Resources.

• Whittle input parameters are based on Perseus Mining Limited site operating experience in similar deposits

at Edikan and supporting technical studies undertaken as part of the Nkosuo Feasibility study.

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

6

• The pit slope designs are based on a geotechnical study by George, Orr and Associates (Australia) Pty Ltd.

Overall pit slopes are 30 to 60 degrees inclusive of berms spaced at between 5 and 20 metres vertically and

berm widths of 6 to 13 metres.

• Pit ramps have been designed for a 100-tonne payload truck fleet and are set at 24 metres (dual lane) to 16

metres (single lane). Minimum mining width is 40 metres for the 100-tonne class truck fleet.

• Vertical mining advance has been capped based on Perseus’s operating experience.

• No environmental issues are known to exist which will prevent open pit mining and ore processing to

continue to operate. Perseus has sufficient space available for waste dumps and tailings dams to store the

expected quantities of mine waste rock and tailings associated with the Nkosuo open pit Ore Reserve.

• Ore cut-off grades are based on the gold price, cost and mining parameters are as shown in Table 5 below.

Table 5: Open Pit Cut-Off Grades

DEPOSIT CUT-OFF GRADE BY ORE TYPE (G/T GOLD)

Oxide Transition Fresh Granite

Nkosuo 0.35 0.45 0.45

PROCESSING PARAMETERS

• The process metallurgical recovery for gold is fixed by material type in each deposit. Gold recovery rates

range from 55% for oxide ore and 90% for primary ore. Recovery is shown in Table 6.

• No deleterious material has been identified.

• Average annual processing throughput rate of ore is nominally 7.0Mtpa, with throughput rates variable by

material type and deposit. The processing circuit involves single stage crushing, semi-autogenous grinding,

gravity recovery, flotation, regrind and CIL.

Table 6: Metallurgical Recoveries by Material Type and Pit

DEPOSIT METALLURGICAL RECOVERIES BY ORE TYPE (%)

Oxide Transition Fresh Granite

Nkosuo 55.1 87.6 90.3

STOCKPILE PARAMETERS

It is assumed that all Ore Reserve material is mined and fed to the processing plant during Edikan’s mine life based

on the material blending schedule and all the material is rehandle d on the ROM stockpile. Stockpiles of Nkosuo low

grade material that remain unprocessed at the end of mine life are excluded from Ore Reserves.

CRITERIA FOR ORE RESERVE CLASSIFICATION

Ore Reserves have been classified based on the underlying Mineral Resource classifications and a Feasibility level

study for the Nkosuo project. Mineral Resources were classified as Indicated and Inferred. The Ore Reserves, based

only on the Indicated Resources, have been classified as Probable Ore Reserves, respectively.

The Ore Reserve is classified as Probable in accordance with the JORC Code, corresponding to the Mineral Resource

classification of Indicated and taking into account other modifying factors where relevant. The deposit’s geological

model is well constrained. The Ore Reserve classification is considered appropriate given the nature of the deposit,

the moderate grade variability, drilling density, structural complexity and mining and processing history of similar

deposits at Edikan. Therefore, it was deemed appropriate to use Indicated Mineral Resources as a basis for Probable

Ore Reserves.

No Inferred Mineral Resources were included in the Ore Reserve estimate.

NEXT STEPS

• With the completion of the Nkosuo Feasibility Study, an application will be lodged with the Ghanaian

Minerals Commission (Mincom) acting on behalf of the Ministry for Lands and Natural Resources.

• In parallel with the Mincom submission, an application will be lodged with the Environmental Protection

Agency (EPA) of Ghana which paves the way for community baseline studies and public hearings . These

activities culminate in generation of an Environmental Impact Assessment.

• Perseus will then submit an Environmental Impact Statement , which is the final document required for

granting of an Environmental Permit for mining at the Nkosuo project.

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL

RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

7

• Conversion of the Agyakusu Prospecting Licence to a Mining Lease and granting of an Environmental Permit

for Nkosuo is expected to take 18 to 24 months.

This announcement was approved for release by Managing Director and CEO, Jeff Quartermaine.

COMPETENT PERSON STATEMENT:

The information in this report that relates to Mineral Resources for Nkosuo is based on information compiled by Mr Gary Brabham , a

Competent Person who is a Fellow of The Austra lasian Institute of Mining and Metallurgy and a Mem ber of the Australian Institute of

Geoscientists. Mr Brabham was until 1 July 2022 a full-time employee and is currently a consultant of Perseus Mining. Mr Brabham has

sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activities which he is

undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,

Mineral Resources and Ore Reserves” and a Qualified Person as defined in NI43-101. Mr Brabham consents to the inclusion in this report of

the matters based on his information in the form and context in which it appears.

The information in this report that relates to Ore Reserves for the Nkosuo deposit is based on information compiled by Mr Adrian Ralph, a

Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Ralph is a full-time employee of Perseus Mining.

Mr Ralph has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activities

which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration

Results, Mineral Resources and Ore Reserves” and a Qualified Person as defined in NI43-101. Mr Ralph consents to the inclusion in this report

of the matters based on his information in the form and context in which it appears.

CAUTION REGARDING FORWARD LOOKING INFORMATION:

This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made

in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management

of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove

to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial

production at the Sissingué Gold Mine, the Edikan Gold Mine and the Yaouré Gold Mine without any major disruption due to the COVID-19

pandemic or otherwise, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of

the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and

on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used

by the Company. Although management believes that the assumptions made by the Company and the expectations represented by suc h

information are reasonable, there can be no assurance that the forward -looking information will prove to be accurate. Forward -looking

information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performanc e or

achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or

implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current

exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors

disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward-

looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s ability to carry on its

exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a

safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonabl e terms.

Readers should not place undue reliance on forward -looking information. Perseus d oes not undertake to update any forward -looking

information, except in accordance with applicable securities laws.

ASX/TSX CODE: PRU

REGISTERED OFFICE:

Level 2, 437 Roberts Road

Subiaco WA 6008

Telephone: +61 8 6144 1700

Email: [email protected]

WWW.PERSEUSMINING.COM

CONTACTS:

Jeff Quartermaine

Managing Director & CEO

[email protected]

Nathan Ryan

Media Relations

+61 4 20 582 887

[email protected]

Claire Hall

Corporate Communications

+61 414 558 202

[email protected]

NEWS RELEASE | PERSEUS INCREASES EDIKAN’S INVENTORIES OF MINERAL RESOURCES AND ORE RESERVES

PERSEUSMINING.COM

8

JORC TABL E 1 – NKOSUO PROJECT

JORC 2012 Table 1 – Section 1 sampling techniques and data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code Explanation Commentary

Sampling

techniques

Nature and quality of sampling (e.g. cut channels, random chips, or

specific specialised industry standard measurement tools appropriate

to the minerals under investigation, such as down hole gamma sondes,

or handheld XRF instruments, etc.). These examples should not be taken

as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity

and the appropriate calibration of any measurement tools or systems

used.

Aspects of the determination of mineralisation that are Material to the

Public Report. In cases where ‘industry standard’ work has been done

this would be relatively simple (e.g. ‘reverse circulation drilling was

used to obtain 1 m samples from which 3 kg was pulverised to produce

a 30 g charge for fire assay’). In other cases more explanation may be

required, such as where there is coarse gold that has inherent sampling

problems. Unusual commodities or mineralisation types (e.g. submarine

nodules) may warrant disclosure of detailed information.

Other than for soil sampling and an airborne EM -magnetics-radiometrics survey conducted in 2020 there has been no

previous mineral exploration at Nkosuo. The presence of gold mineralisation was first revealed by artisanal miners in

2019. Perseus commenced drilling in July 2021. Drilling completed to 31 March 2022 is tabulated bel ow. All drilling on

the Property to date has been located at the Nkosuo project.

Drilling Type No. Holes RC metres DD metres Purpose

RC 90 7,043 0 Resource

Pre-collared DD 109 10,992 15,885 Resource

DD 11 0 1,900 Resource

RC 1 120 0 Water

DD 5 0 262 Met

Pre-collared DD 2 115 180 Geotech

DD 4 0 485 Geotech

Totals 222 18,270 18,712

RC drilling used face-sampling hammers with 139mm hole diameter. Samples were collected at one metre intervals and

logged visually for recovery, sample condition (dry, damp, wet) and contamination. Sample recoveries were measured by

weighing bulk recovered samples.

Diamond drilling utilised HQ triple-tube (61.1mm Ø) drilling in weathered materials and NQ2 (50.6mm Ø) diameter core

in fresh rock. Diamond core recoveries were measured linearly per drill run. Core recoveries averaged 70% in weathered

materials and 100% in fresh rock.

Drilling techniques Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air

blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple

or standard tube, depth of diamond tails, face-sampling bit or other

type, whether core is oriented and if so, by what method, etc.).

RC drilling used face-sampling hammers with 139mm hole diameter. Samples were collected at one metre intervals.

Diamond drilling utilised HQ triple-tube (61.1mm Ø) drilling in weathered materials and NQ2 (50.6mm Ø) diameter core

in fresh rock. Core in fresh rock was oriented using a “Reflex ACT II” device.

Drill sample

recovery

Method of recording and assessing core and chip sample recoveries and

results assessed.

Measures taken to maximise sample recovery and ensure

representative nature of the samples.

RC drill samples were logged visually for recovery, sample condition (dry, damp, wet) and contamination. Sample

condition logs are available for 96% of RC samples within the mineralised granite.

RC

metres

drilled

With

sample

condition

log

Dry Moist Damp Wet