CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

Perth, Western Australia/December 5, 2024/ Perseus Mining Limited (ASX/TSX: PRU) is pleased to provide

an update on ongoing resource definition drilling being conducted at its recently acquired Nyanzaga Gold

Project in Tanzania (Nyanzaga or the Project).

Designed to increase Perseus’s understanding of Nyanzaga ’s Mineral Resource, a programme of drilling

commenced in August 2024. This work aimed to supplement and where needed, fill in gaps in the work done

by previous owners. The programme was also intended to provide additional information required to inform

a change in mine design from the prior owner’s plan of a small open pit plus underground operation to the

large-scale open pit operation contemplated by Perseus.

By mid-November 2024, eight drill rigs were operating on the site and a total of 20,278 m of combined

reverse circulation (RC) and diamond (DD) drilling of the Stage 1 Tusker Hill Infill Resource Development

Program was complete, representing 77% of the budgeted 26,250 m Tusker program.

The objective of this drilling program was to infill existing drilling completed predominantly at a spacing of

40 m × 40 m, to a nominal drill pattern of 20 m × 40 m to provide additional confidence in the defined

mineralisation. While the program is ongoing, results achieved to date are positive, with the more significant

results including:

o NYZDD1340: 56m @ 3.44 g/t gold from 273m and 111m @ 5.02 g/t gold from 438m including 11m

@ 22.02 g/t gold from 456m and 11m @ 17.09 g/t gold from 490m;

o NYZRCDD1336: 114m @ 3.72 g/t gold from 284m including 4m @ 20.84 g/t gold from 348m and

20m @ 5.18 g/t gold from 361m;

o NYZRCDD1353: 42m @ 4.74 g/t gold from 158m (pre collar only, additional results pending);

o NYZDD1329: 41.6m @ 3.99 g/t gold from 35m including 16m @ 7.13 g/t gold from 49m;

o NYZDD1330: 76m @ 2.07 g/t gold from 88m including 14m @ 3.87 g/t gold from 89m;

o NYZRCDD1328: 83m @ 2.29 g/t gold from 233m including 4m @ 28.13 g/t gold from 307m;

o NYZRCDD1331: 77m @ 2.92 g/t gold from 304m including 7m @ 11.50 g/t gold from 374m;

o NYZRCDD1338: 33.2m @ 3.02 g/t gold from 517m;

o NYZRCDD1341: 53m @ 2.27 g/t gold from 287m including 16m @ 4.06 g/t gold from 296m

Further geotechnical, metallurgical and sterilisation drilling programs are ongoing on site to further inform

final pit designs ahead of a Final Investment Decision (FID) which is expected to be made by Perseus in late

January 2025.

2

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

THE NYANZAGA GOLD PROJECT, TANZANIA

Nyanzaga is located in north-western Tanzania, within the Sengerema District of the Mwanza Region,

south of Lake Victoria approximately 60 kilometres southwest of Mwanza (Tanzania’s second largest city).

The Project is located on the north-eastern flank of the Sukumaland Archaean Greenstone Belt of the Lake

Victoria Goldfield, approximately 60 km east of Anglogold Ashanti’s Geita Gold Mine and 35 km northeast

of Barrick’s Bulyanhulu Gold Mine. The Project area covers Nyanzian greenstone volcanic rocks and

sediments typical of the greenstone belts of the central craton.

The Nyanzaga’s Mineral Resource Estimates consist of a Measured and Indicated Resource of 24.2 Mt

grading 3.64 g/t gold for 2.8 Moz gold and an Inferred Resource of 5.8 Mt grading 2.4 g/t gold for 0.5 Moz

gold. It has a Probable Ore Reserve Estimate of 40.1 Mt grading 2.01 g/t Au for 2.6 Moz gold.

These estimates were released by OreCorp Limited in ASX releases dated 12 September 2017 titled “MRE

Update for the Nyanzaga Project Increasing Category and Grade”, 5 May 2022 titled “DFS Completion and

Kilimani Mineral Resource Estimate update within the Nyanzaga Special Mining Licence – Tanzania”, and

22 August 2022 titled “Nyanzaga DFS Delivers Robust Results”, available on www.perseusmining.com.

As these estimates are Foreign Estimates for the purpose of Canadian NI 43 -101 disclosure, it should be

noted that these estimates have been prepared in accordance with the JORC Code (2012) and have not

been reported in accordance with NI 43 -101 and thata Qualified Person has not done sufficient work to

classify the resource estimate as current in accordance with NI 43-101.

OVERVIEW OF WORK PROGRAMS & RESULTS

Perseus is well advanced in its review of Nyanzaga’s existing geology, mining engineering and mineral

processing studies. Additional g eotechnical and mineral processing test work and analysis is also

underway to ensure optimal value can be extracted by development of the Project by Perseus. The

comprehensive review of all aspects of the Project will result in the production of Perseus’s Mineral

Resource estimate and Ore Reserve estimate for Nyanzaga to support the development FID which is

expected to be made by Perseus in January 2025.

Designed to increase Perseus’s understanding of the Nyanzaga Mineral Resource, a programme of drilling

was also started in August 2024. This work aimed to supplement and where needed, fill in gaps in the work

done by previous owners. The programme was also intended to provide additional information required to

inform a change in mine design from the prior owner’s plan of a small open cut plus underground operation

to the large-scale open pit operation contemplated by Perseus.

By mid-November 2024, eight drill rigs were operating on the site and a total of 20,278 m of combined

reverse circulation (RC) and diamond (DD) drilling of the Stage 1 Tusker Hill Infill Resource Development

Program was complete, representing 77% of the budgeted 26,250 m Tusker program.

The objective of this drilling program was to infill existing drilling completed predominantly at a spacing of

40 m × 40 m, to a nominal drill pattern of 20 m × 40 m to provide additional confidence in the defined

mineralization.

While the program is ongoing, results achieved to date are positive, with the m ore significant results

received to date including:

3

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

Hole Intercept

NYZDD1340 56m @ 3.44 g/t gold from 273m and 111m @ 5.02 g/t gold from 438m including

11m @ 22.02 g/t gold from 456m and 11m @ 17.09 g/t gold from 490m

NYZRCDD1336 114m @ 3.72 g/t gold from 284m including 4m @ 20.84 g/t gold from 348m and

20m @ 5.18 g/t gold from 361m

NYZRCDD1353* 42m @ 4.74 g/t gold from 158m (pre collar only, additional results pending)

NYZDD1329 41.6m @ 3.99 g/t gold from 35m including 16m @ 7.13 g/t gold from 49m

NYZDD1329 41.6m @ 3.99 g/t gold from 35m including 16m @ 7.13 g/t gold from 49m

NYZDD1330 76m @ 2.07 g/t gold from 88m including 14m @ 3.87 g/t gold from 89m

NYZRC1361 10m @ 3.10 g/t gold from 127m

NYZRCDD1328 83m @ 2.29 g/t gold from 233m including 4m @ 28.13 g/t gold from 307m

NYZRCDD1331 77m @ 2.92 g/t gold from 304m including 7m @ 11.50 g/t gold from 374m

NYZRCDD1332 55m @ 1.97 g/t gold from 374m

NYZRCDD1338 33.2m @ 3.02 g/t gold from 517m

NYZRCDD1341 53m @ 2.27 g/t gold from 287m including 16m @ 4.06 g/t gold from 296m

NYZRCDD1345 41m @ 2.12 g/t gold from 154m

NYZRCDD1347*: 30m @ 2.65 g/t gold from 373m (additional results pending)

NYZRCDD1356A 45m @ 2.03 g/t gold from 112m

NYZRCDD1358 55m @ 2.63 g/t gold from 206m

Note: Some assays are incomplete – i.e. not all assays have been received at the time of reporting including holes marked by *

and noted in the figure captions.

Figures illustrating the key aspects of the Nyanzaga Gold Project are presented in Appendix 1. Drill collar

details and significant intercepts (>2 m above 0.5 g/t gold Au) are summarised in Table 1 in Appendix 2.

4

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

OTHER PROJECT ACTIVITIES

Full scale construction is anticipated to commence in late January 2025 post the Project FID. Aside from

the drilling programmes detailed above, s ignificant progress has been made in preparation for the FID

including:

• Front End Engineering Design (FEED) is nearing completion. The FEED focussed on right sizing the

process plant throughput to align with the Perseus Feasibility work, incorporating the Perseus

lessons learnt from our existing operations and detailed project execution planning.

• Resettlement Action Plan – construction of community housing is progressing well, with first homes

on track for handover prior to end of December 2024.

• An early works program is underway to prepare the site for full construction including: construction

camp improvements, establishment of services, procurement of owners capability equipment and

clearing of land in camp and process areas.

• Work is advanced on agreeing amendments to the existing F ramework Agreement between

Perseus’s Tanzanian subsidiary and the Government of Tanzania. This work is specifically aimed at

aligning the Agreement with legislation and regulations introduced following the execution of the

original agreement.

Perseus’s Managing Director and CEO, Jeff Quartermaine, said:

“When Perseus acquired the Nyanzaga Gold Project earlier this year, we were confident that, in our hands,

Nyanzaga could be developed into a high -quality gold mine capable of generating significant benefits for all

stakeholders, including our shareholders, employees, the host government and communities in Tanzania.

The results of the work carried out by Perseus on the Project to date, especially the very promising results of the

infill resource definition drilling, has reinforced our belief that our goal is achievable.

We are looking forward to making a Final Investment Decision on the development of Nyanzaga in January 2025

and adding a high-quality operation to our existing geopolitically diversified, African focussed asset portfolio of

gold mining operations and development projects.

Following the Final Investment Decision in January 2025, development works will commence immediately, leading

to the production of first gold at the Nyanzaga Gold Mine by January 2027.”

This announcement has been approved for release by Perseus Mining Limited’s Managing Director

and Chief Executive Officer, Jeff Quartermaine.

5

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

ASX/TSX CODE: PRU

CAPITAL STRUCTURE:

Ordinary shares: 1,376,016,129

Performance rights: 9,853,824

REGISTERED OFFICE:

Level 2

437 Roberts Road

Subiaco WA 6008

Telephone: +61 8 6144 1700

www.perseusmining.com

DIRECTORS:

Rick Menell

Non-Executive Chairman

Jeff Quartermaine

Managing Director & CEO

Amber Banfield

Non-Executive Director

Elissa Cornelius

Non-Executive Director

Dan Lougher

Non-Executive Director

CONTACTS:

Jeff Quartermaine

Managing Director & CEO

[email protected]

Stephen Forman

Investor Relations

+61 484 036 681

[email protected]

Nathan Ryan

Media

+61 420 582 887

[email protected]

6

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

COMPETENT PERSON STATEMENT:

The information in this report and the attachments that relate to exploration drilling results at the Nyanzaga Gold Project is

based on, and fairly represents, information and supporting documentation prepared by Mr Glen Edwards, a Competent Person

who is a Chartered Professional Geologist. Mr Edwards is the General Manager Exploration of the Company, employed by Perseus

Mining Services Pty Ltd. Mr Edwards has sufficient experience, which is relevant to the style of mineralisation and type of deposit

under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the

‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC Code 2012”) and to qualify as

a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr Edwards

consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

ASX Listing Rules disclosure

All information on the Nyanzaga Mineral Resource and Ore Reserve estimates has been extracted from the OreCorp ASX

announcements dated 12 September 2017 titled “MRE Update for the Nyanzaga Project Increasing Category and Grade”, 5 May

2022 titled “DFS Completion and Kilimani Mineral Res ource Estimate update within the Nyanzaga Special Mining Licence –

Tanzania”, and 22 August 2022 titled “Nyanzaga DFS Delivers Robust Results” available on www.perseusmining.com. Perseus

confirms that it is not aware of any new information or data that mat erially affect the information included in the original ASX

announcements and that all material assumptions and technical parameters underpinning the estimates in the ASX announcements

continue to apply and have not materially changed. Perseus confirms that the form and context in which the Competent Person’s

findings are presented have not been materially modified from the original ASX announcements.

Canadian National Instrument NI43-101 disclosure

The information in this release relating to the Nyanzaga Gold Project is extracted from the OreCorp ASX announcements dated 12

September 2017 titled “MRE Update for the Nyanzaga Project Increasing Category and Grade”, 5 May 2022 titled “DFS Completion

and Kilimani Mineral Resource Estimate update within the Nyanzaga Special Mining Licence – Tanzania”, and 22 August 2022 titled

“Nyanzaga DFS Delivers Robust Results” available on www.perseusmining.com. A Qualified Person has not done sufficient work to

classify the Historical Estimates as current. As such, any Mineral Resource and Mineral Reserve estimates included in this section

are Historical Estimates as defined in Canadian National Instrument 43-101 and are not reported as current Perseus estimates. The

OreCorp Feasibility Study includes key assumptions for commodity prices, gold mining and processing costs, and there have been

no material changes in assumptions. The OreCorp Feasibility Study in its current form is a comprehensive compilation of all available

data applicable to the estimation of Mineral Resources and Mineral Reserves. Reference is made to Perseus’s news release dated

31 May 2024 titled "Perseus progresses Nyanzaga Gold Project” for further clarifying statements. Perseus confirms the applicability

of these statements have not materially changed.

John McGloin

Non-Executive Director

7

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

CAUTION REGARDING FORWARD LOOKING INFORMATION:

This report contains forward -looking information which is based on the assumptions, estimates, analysis and opinions of

management made in light of its experience and its perception of trends, current conditions and expected developments, as wel l

as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that

such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among

other things: the price of gold, continuing commercial production at the Yaouré Gold Mine, the Edikan Gold Mine and the Sissingué

Gold Mine without any major disruption, the receipt of required governmental approvals, the accuracy of capital and operating

cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to

obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustiv e

of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions

made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the

forward-looking information will prove to be accurate. Forward -looking information involves known and unknown risks,

uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially

different from any anticipated future results, performance or achievements expressed or implied by such forward -looking

information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the

actual results of future exploration, change s in project parameters as plans continue to be evaluated, as well as those factors

disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in

the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s

ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability

of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and

when required and on reasonable terms. Readers should not place undue reliance on forward -looking information. Perseus does

not undertake to update forward-looking information, except in accordance with applicable securities laws.

8

NEWS RELEASE | CONFIDENCE BOOSTING INFILL DRILLING AT NYANZAGA PROJECT

PERSEUSMINING.COM

APPENDIX 1 - FIGURES

Figure 1: Nyanzaga Project Location