Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PPX.V ·

PPX Mining Announces Resumption of Diamond Drilling Program at the Callanquitas MINE

Exploration Programs

PPX MINING CORP | 82 Richmond Street East, M5C 1P1, Toronto, Ontario, Canada | +1416-361-0737 | www.ppxmining.com

NEWS RELEASE; TSX.V PPX; BVL PPX

PPX MINING ANNOUNCES RESUMPTION OF DIAMOND DRILLING PROGRAM AT THE

CALLANQUITAS MINE

Toronto, Ontario – June 30 th , 2026 – PPX Mining Corp. (TSXV: PPX) (BVL: PPX) (" PPX" or the

"Company") is pleased to announce that its Peruvian mining pa rtner, Proyectos La Patagonia S.A.C.

("PLP"), has signed a drilling services contract wi th RAMPERU S.A.C. Servicios Generales

("RAMPERU") to resume diamond drilling exploration activities at the Company's flagship Callanquitas

Mine in northern Peru.

The drilling campaign marks the continuation of PPX's systematic exploration strategy aimed at expanding

the known mineralization surrounding the Callanquit as deposit and advancing the Company's

understanding of the broader Igor Project.

The drilling campaign will focus on testing extensi ons of known mineralized structures within the

Callanquitas veins through HQ3 diamond drilling. In formation collected during the program, including

geological logging, structural data, core recovery and analytical results, will be used to refine the Company's

geological model and support future resource evaluation and mine planning activities.

The Company expects mobilization activities to begi n following the contractual advance payment and

completion of site preparations, with drilling expected to continue over approximately nine months.

Program Highlights

• Initial diamond drilling program of approximately 4 ,860 metres using a modern Tecdrill

H400E drill rig.

• Option to expand the campaign to approximately 9,810 metres through the addition of a second

drill rig.

• Expected execution period of approximately 265 calendar days following mobilization.

• Comprehensive health, safety, environmental and operational standards.

• Daily technical reporting, borehole documentation and final technical acceptance procedures.

• PLP to provide site infrastructure including access , water, power, fuel, accommodation and

auxiliary equipment.

Ernest Mast, President and CEO commented: "The exec ution of this drilling contract represents another

important milestone as we continue to grow and bett er define the Callanquitas Mine. The exploration

program is designed to further define and expand th e high-grade mineralized system surrounding our

existing resources while supporting our long-term mine development plans."

All scientific and technical information contained in this press release has been reviewed and approved by

Dr. Warren Pratt, PGeo., Technical Advisor of PPX M ining Corp., who is a qualified person as defined

within the National Instrument NI-43-101.

On behalf of the Board Members

Ernest Mast

President and CEO

PPX Mining Corp.

PPX MINING CORP | 82 Richmond Street East, M5C 1P1, Toronto, Ontario, Canada | +1416-361-0737 | www.ppxmining.com

82 Richmond Street East Toronto, Ontario M5C 1P1, Canada

Telephone: 416-361-0737

Website: www.ppxmining.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts respo nsibility for the adequacy or accuracy of this

release.

Warning Statement

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain disclosures in this release may constitute “forward-looking statements” within the meaning of the

United States Securities Litigation Reform Act of 1995 and the Canadian securities legislation. In making

the forward-looking statements in this release, the Company has applied certain factors and assumption s

that it believes are reasonable. However, forward-looking statements in this release are subject to numerous

risks, uncertainties and other factors that may cause future results to differ materially from those expressed

or implied by such forward-looking statements. Such risks and uncertainties are detailed from time to time

in the Company's filings with relevant securities c ommissions, and may include, but are not limited to ,

market conditions, and delays in obtaining or failing to obtain regulatory approvals or financing. There can

be no assurance that such statements will prove to be accurate and actual results and future events co uld

differ materially from those anticipated in such st atements. Readers should not place undue reliance o n

forward-looking statements. The Company has no inte ntion, and expressly disclaims any intention or

obligation, to update or revise any forward-looking statements, whether as a result of new information ,

future events or otherwise, except as required by law.