Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PPX.V ·

PPX Mines 9,436 Tonnes Grading 8.65 gpt Au at Mina Callanquitas During Q4 2019; 40,692 Tonnes Grading 8.93 gpt Au for Full Year

Drill Results

_____________________________________________________________________________________

NEWS RELEASE TSX.V PPX; BVL PPX; SSE PPX

PPX Mines 9,436 Tonnes Grading 8.65 gpt Au at Mina Callanquitas During

Q4 2019; 40,692 Tonnes Grading 8.93 gpt Au for Full Year

Vancouver, British Columbia – March 25, 2020 – PPX Mining Corp. (the "Company" or “PPX”) is

pleased to announce that over 9,436 tonnes of ore grading 8.65 gpt gold were mined and processed during

calendar Q4 (October - December) 2019 at Mina Callanquitas, a rate of approximately 103 tonnes/day. In

addition, 938 metres of lateral mine development and exploration were also completed during the quarter.

Highlights of mining results for calendar Q4 2019 are given below:

• The Company’s mining partner Proyectos La Patagonia S.A.C. (“PLP”) provided the Company

with a detailed report on operations at Mina Callanquitas for calendar Q4 2019. PLP reports that

9,436 tonnes of gold mineralized ore were shipped to the Malin Plant of Silver Cascas S.A.C.

(“Silver Cascas”). The average gold grade of the ore was 8.65 gpt gold. Gold recoveries from

processing the mineralized rock at the Silver Cascas plant ranged from 76% to 85%, consistent

with gold recoveries observed previously. A total of 2,067 ounces of gold was recovered by Silver

Cascas during the period. To date, PPX has mined over 100,000 tonnes from the Measured and

Indicated Resource at Mina Callanquitas which includes a portion of the project’s Mineral Reserves

as defined in the Igor Pre-Feasibility Study (available on the Company’s website or SEDAR). PLP

utilizes the proceeds from the sale of the mineralized material to advance underground development

at Mina Callanquitas in order to facilitate the future expansion of the mining rate to 350 tonnes/day.

• For the full calendar year 2019, Mina Callanquitas produced 40,692 tonnes of ore grading 8.93 gpt

gold. Total gold recovered by Sliver Cascas was 9,194 ounces. In addition, 3,120 metres of lateral

development were completed during 2019 with the mine now open on five separate levels.

Production averaged 111 tonnes per day over the full year.

Brian J. Maher, President and CEO of PPX Mining Corp commented: “PPX is pleased with the progress

that PLP has made in opening up Mina Callanquitas on five separate levels. Developing multiple working

faces is the key to underground mining success and achieving our target of 350 tonnes/day during 2020.”

Coronavirus/COVID-19 Information:

Currently, all PPX and Sienna Minerals S.A.C. employees are working from home in accordance with their

individual government recommendations and mandates. This status will continue for the foreseeable future,

again under the guidance of respective local authorities.

About PPX Mining Corp:

PPX Mining Corp. (TSX.V: PPX.V, SSE: PPX, BVL: PPX) is a Canadian-based mining company with

assets in northern Peru. Igor, the Company’s 100%-owned flagship gold and silver project, is located in

the prolific Northern Peru gold belt in eastern La Libertad Department. PPX is developing the Callanquitas

Mine and heap leach facility to exploit high grade, underground-minable oxidized gold and silver ore.

Based on the Company’s Pre-Feasibility Study (“PFS”), PPX expects the Callanquitas Mine to produce up

to 26,000 AuEq* ounces per year over a seven-year mine life at cash cost of less than US$610/AuEq*

ounce (the Igor PFS is available on the Company’s website and SEDAR ). Simultaneously, PPX is

Page 2

accelerating its exploration program at Igor in order to fully evaluate the resource potential of the entire

Igor project area. The Callanquitas structure is open along strike and at depth, parallel structures are

unexplored. New discoveries at Portachuelos, coupled with the Domo and Tesoros exploration targets,

emphasize that the Igor Project is evolving into a district -scale project with multiple deposits and

mineralized zones.

*AuEq is calculated as follows: AuEq ounces = Au ounces + Ag ounces/75. Per PFS, inclusive of metallurgical recovery.

All scientific and technical information in this press release has been reviewed and approved by Quentin J.

Browne, P.Geo., Independent Consulting Geologist to PPX Mining Corp., who is a qualified person under

the definitions established by National Instrument 43-101.

On behalf of the Board of Directors

Brian J. Maher

President and Chief Executive Officer

FOR FURTHER INFORMATION, PLEASE CONTACT:

PPX Mining Corp.

Brian J. Maher, President and Chief Executive Officer

Phone: 1-530-913-4728

Email: [email protected]

Website: www.ppxmining.com

Cautionary Statement:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release. Certain disclosure in this release, June constitute

"forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and

Canadian securities legislation. In making the forward-looking statements in this release, the Company has applied certain factors

and assumptions that the Company believes are reasonable. However, the forward-looking statements in this release are subject to

numerous risks, uncertainties and other factors that June cause future results to differ materially from those expressed or implied

in such forward-looking statements. Such uncertainties and risks are detailed from time to time in the Company's filings with the

appropriate securities commissions, and June include, among others, market conditions, and delays in obtaining or failure to obtain

required regulatory approvals or financing. There can be no assurance that such statements will prove to be accurate, and actual

results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue

reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to,

update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as

required by law.