Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PPX.V ·

PPX Closes First Tranche of Construction Facility

Financings Mine Development & Operations

NEWS RELEASE; TSX.V PPX; BVL PPX

PPX CLOSES FIRST TRANCHE OF CONSTRUCTION FACILITY

Toronto – September 25, 2024 – PPX Mining Corp. (the “ Company ” or “ PPX ”, including its Peruvian

subsidiaries) is pleased to announce that it closed the first tranche of the construction facility (th e “ Loan ”)

provided by its major shareholder and received gross proceeds of US$1,800,000.

On September 19, 2024, PPX received its final const ruction permit to start building a 350 tpd CIL and

Flotation plant at the Igor Project, La Libertad, Peru. The plant will process the oxide and sulphide materials

mined from the Callanquitas Mine. This permit was t he only pending condition precedent to access the

US$6,000,000 Loan arranged for construction purpose s, as announced by the Company in its press release

dated January 2, 2024.

The key terms of this Loan are as follows:

• US$6,000,000 total debt facility to be disbursed in 4 tranches.

• 11.75% annual interest rate.

• 1.5 years grace period, paying only interest, to cover the construction and commissioning periods.

• 3 years principal amortization period, following the grace period.

• The facility will be administered through a trust s tructure that will guarantee the repayment of the

loan obligations. In addition, other trusts will be established to ensure the construction funding flow

and to protect the surface rights and shares of the Peruvian subsidiary holding the construction and

processing permits.

• Total and partial prepayments are authorized with no penalties.

• A 3% finder’s fee in shares of PPX is payable to an arm’s length finder, as compensation for

facilitating the Loan. The common shares issuable to the finder will be subject to a four-month hold

period from the date of issuance in accordance with applicable Canadian securities laws. The Loan

and the finder’s fee remain subject to the final approval of the TSXV.

Brian Imrie, Chairman commented “We are grateful to receive the first tranche of the construction faci lity

arranged with our major shareholder, a clear suppor ter of the project, who granted this facility at at tractive

terms to the Company. Management expects to finaliz e in the following days an agreement with the

construction company that will assist PPX with plant construction.”

The creditor of the Loan is a control person of the Company. Accordingly, the Loan constitutes a relat ed

party transaction pursuant to Multilateral Instrume nt 61-101 – Protection of Minority Security Holders in

Special Transactions (“ MI 61-101 ”). The Company is exempt from the requirement to o btain minority

shareholder approval in connection with the Loan in reliance on the exemption contained in section 5.7(1)(f)

of MI 61-101, as the Company has determined that the Loan contains reasonable commercial terms that are

not less advantageous to the Company than if the Lo an was obtained from an arm’s length party, and the

Loan is not convertible or repayable as to principa l or interest, directly or indirectly, in equity or voting

securities of the Company or its subsidiaries. The formal valuation requirements are not applicable to the

Loan pursuant to section 5.4(1) of MI 61-101. The board of directors of the Company approved the Loan and

no materially contrary view or abstention was expressed or made by any director of the Company in relation

thereto.

About PPX Mining Corp:

PPX Mining Corp. (TSX.V: PPX.V, BVL: PPX) is a Canadian-based mining company with assets in northern

Peru. Igor, the Company’s 100%-owned flagship gold and silver project, is located in the prolific Nort hern

Peru gold belt in eastern La Libertad Department.

On behalf of the Board of Directors

Brian Imrie

Chairman

82 Richmond Street East

Toronto, Ontario M5C 1P1

Canada

416-361-0737

Neither TSX Venture Exchange nor its Regulation Ser vices Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts respo nsibility for the adequacy or accuracy of this

release.

Cautionary Statement:

This press release contains forward-looking informa tion and forward-looking statements (collectively,

“ forward-looking statements ”) as such terms are defined by applicable securities laws, including, but not

limited to statements regarding future plans on the Igor Project , statements regarding the terms and

completion of the remaining tranches of the Loan an d entering into an agreement regarding plant

construction . Forward-looking statements are statements that rela te to future events. In this context,

forward-looking statements often address expected f uture business plans and financial performance and

often contain words such as “anticipate,” “believe, ” “plan,” “estimate,” “expect,” and “intend,”, stat ements

that an action or event “may,” “might,” “could,” “s hould,” “would” or “will” be taken or occur, or oth er

similar expressions. Forward-looking statements are subject to a number of known and unknown risks and

uncertainties, many of which involve factors or circumstances that are beyond the Company’s control, and

the Company’s actual results could differ materiall y from those stated or implied in forward-looking

statements due to many various factors. Such uncert ainties and risks include, among others, delays in

obtaining or inability to obtain required regulatory approvals; actual development plans and costs differing

materially from the Company’s estimates; and compliance with complex regulations associated with mining

activities. Although the Company believes that the expectations reflected in the forward-looking statements

are reasonable, the Company cannot guarantee that t he events and circumstances reflected in the forward-

looking statements will be achieved or occur. The t iming of events and circumstances and actual result s

could differ materially from those projected in the forward-looking statements. Accordingly, one shoul d

not place undue reliance on forward- looking statements. All forward-looking statements contained in this

press release are made as of today’s date, and the Company undertakes no obligation to update or publicly

revise any forward-looking statements, whether as a result of new information, future events or otherwise,

unless required by law.